X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495112015002

Well Details

Well ID: 0495112015002
Loading map...
Location: 00/15-20-049-11W5/2
Location Alias: 00/15-20-49-11 W5M
Location Alias 2: 00/15-20-049-11 W5/02
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 20
County/Municipality: Brazeau County
Well Name: KEYERA PEMBINA 15-20-49-11
Operator Name: Keyera Energy Ltd.
License Number: 0086975
License Date: 1980-11-12
License Status: Issued
Spud Date: 1980-11-18
Final Drill Date: 1980-12-29
Well Total Depth: 3015.00 m
Surface Hole Latitude: 53.248243
Surface Hole Longitude: -115.570073

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-12 Obtained License
1980-12-29 Finished Drilling
1980-12-29 Well Mode changed to Drilled and Cased
1981-01-01 Drill Stem Test Performed
1981-01-03 Production Casing Operation Performed
1981-07-06 Perforation Treatment Performed - Jet Perforation
1981-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-10 Perforation Treatment Performed - Fractured
1981-08-21 Perforation Treatment Performed - Jet Perforation
1981-09-01 Well Began Production
1981-09-01 Well Fluid changed to Crude Oil
1981-09-01 Well Mode changed to Flowing
1981-12-01 Well Fluid changed to Crude Oil
1981-12-01 Well Mode changed to Suspended
1982-06-01 Well Fluid changed to Crude Oil
1982-06-01 Well Mode changed to Pumping
1987-05-27 Well Log Performed
1988-12-09 Perforation Treatment Performed - Chemical Squeeze
1988-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-07 Perforation Treatment Performed - Chemical Squeeze
1990-09-09 Perforation Treatment Performed - Chemical Squeeze
1990-09-12 Well Log Performed
1990-09-13 Perforation Treatment Performed - Jet Perforation
1990-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-14 Well Log Performed
1991-03-05 Perforation Treatment Performed - Chemical Squeeze
1991-06-26 Perforation Treatment Performed - Chemical Squeeze
1991-09-26 Perforation Treatment Performed - Chemical Squeeze
1991-11-21 Perforation Treatment Performed - Chemical Squeeze
1992-01-12 Perforation Treatment Performed - Cement Squeeze
1992-01-15 Perforation Treatment Performed - Cement Squeeze
1992-01-17 Well Log Performed
1992-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-18 Perforation Treatment Performed - Jet Perforation
1992-01-20 Well Log Performed
1992-01-22 Perforation Treatment Performed - Jet Perforation
1992-01-22 Well Log Performed
1992-01-28 Well Log Performed
1992-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-05 Perforation Treatment Performed - Chemical Squeeze
1992-09-30 Perforation Treatment Performed - Chemical Squeeze
2010-03-31 Well Log Performed
2010-04-01 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-07-06 Perforation 2315.00 2325.00 3
1990-09-14 Acid Treatment 2915.50 2925.50 0
1991-03-05 Chemical Squeeze 2915.50 2925.50 0
1991-06-26 Chemical Squeeze 2915.50 2925.50 0
1991-09-26 Chemical Squeeze 2915.50 2919.50 0
1991-11-21 Chemical Squeeze 2915.50 2925.50 0
1992-01-12 Cement Squeeze 2315.00 2325.00 0
1992-01-15 Cement Squeeze 2915.50 2925.50 0
1992-01-18 Perforation 2923.00 2925.50 13
1992-01-18 Acid Treatment 2923.00 2925.50 0
1992-01-22 Perforation 2315.00 2325.00 13
1981-07-07 Acid Treatment 2315.00 2325.00 0
1992-01-30 Acid Treatment 2923.00 2925.50 0
1992-05-05 Chemical Squeeze 2923.00 2925.50 0
1992-09-30 Chemical Squeeze 2923.00 2925.50 0
2010-04-01 Perforation 2902.00 2907.00 17
1981-07-10 Fracture 2315.00 2325.00 0
1981-08-21 Perforation 2915.50 2919.50 4
1988-12-09 Chemical Squeeze 2915.50 2919.50 0
1988-12-10 Acid Treatment 2915.50 2919.50 0
1990-09-07 Chemical Squeeze 2915.50 2919.50 0
1990-09-09 Chemical Squeeze 2915.50 2919.50 0
1990-09-13 Perforation 2921.50 2925.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1452 0.0 0.0 0.0
1982 4345 0.0 0.0 0.0
1983 6870 0.0 0.0 0.0
1984 7389 0.0 0.0 0.0
1985 4942 0.0 0.0 0.0
1986 3812 0.0 0.0 0.0
1987 6497 0.0 0.0 0.0
1988 7292 0.0 0.0 0.0
1989 7936 0.0 0.0 0.0
1990 8022 0.0 0.0 0.0
1991 7786 0.0 0.0 0.0
1992 6750 0.0 0.0 0.0
1993 6858 0.0 0.0 0.0
1994 6322 0.0 0.0 0.0
1995 8437 0.0 0.0 0.0
1996 8397 0.0 0.0 0.0
1997 8670 0.0 0.0 0.0
1998 8390 0.0 0.0 0.0
1999 8582 0.0 0.0 0.0
2000 8465 0.0 0.0 0.0
2001 7761 0.0 0.0 0.0
2002 8371 0.0 0.0 0.0
2003 8485 0.0 0.0 0.0
2004 8286 0.0 0.0 0.0
2005 8471 0.0 0.0 0.0
2006 8496 0.0 0.0 0.0
2007 8663 0.0 0.0 0.0
2008 8573 0.0 0.0 0.0
2009 7119 0.0 0.0 0.0
2010 6302 0.0 0.0 0.0
2011 8169 0.0 0.0 0.0
2012 4694 0.0 0.0 0.0
2013 5525 0.0 0.0 0.0
2014 7893 0.0 0.0 0.0
2015 8424 0.0 0.0 0.0
2016 8547 0.0 0.0 0.0
2017 4092 0.0 0.0 0.0
2018 8184 0.0 0.0 0.0
2019 7415 0.0 0.0 0.0
2020 2097 0.0 0.0 0.0

For data sources see[5]

References