0495113210002

Well Details

Well ID: 0495113210002
Loading map...
Location: 00/10-32-049-11W5/2
Location Alias: 00/10-32-49-11 W5M
Location Alias 2: 00/10-32-049-11 W5/02
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 32
County/Municipality: Brazeau County
Well Name: KEYERA PEMBINA 10-32-49-11
Operator Name: Keyera Energy Ltd.
License Number: 0117340
License Date: 1985-08-29
License Status: Suspension
Spud Date: 1985-08-31
Final Drill Date: 1989-08-03
Well Total Depth: 3280.00 m
Surface Hole Latitude: 53.274694
Surface Hole Longitude: -115.573178

For data sources see[1][2]

Well History

Date Event
1985-08-29 Obtained License
1985-09-01 Surface Casing Operation Performed
1985-09-22 Intermediate Casing Operation Performed
1989-07-23 Direction Drilling Operation Performed - Horizontal
1989-07-24 Well Log Performed
1989-08-03 Finished Drilling
1989-08-03 Well Log Performed
1989-08-03 Well Mode changed to Drilled and Cased
1989-08-07 Lost Circulation Occurred
1989-08-08 Liner Casing Operation Performed
1989-08-08 Rig Released
1989-08-28 Well Log Performed
1989-09-11 Perforation Treatment Performed - Jet Perforation
1989-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-15 Well Began Production
1989-09-15 Well Fluid changed to Crude Oil
1989-09-15 Well Mode changed to Flowing
1989-12-08 Well Log Performed
1990-01-24 Well Log Performed
1990-01-28 Well Log Performed
1990-08-25 Perforation Treatment Performed - Jet Perforation
1990-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-09-26 Perforation Treatment Performed - Chemical Squeeze
1991-09-28 Perforation Treatment Performed - Chemical Squeeze
1991-11-08 Perforation Treatment Performed - Chemical Squeeze
1991-11-21 Perforation Treatment Performed - Chemical Squeeze
1991-12-31 Perforation Treatment Performed - Chemical Squeeze
1992-03-04 Perforation Treatment Performed - Chemical Squeeze
1992-03-05 Perforation Treatment Performed - Chemical Squeeze
1992-04-06 Perforation Treatment Performed - Chemical Squeeze
1992-08-28 Well Log Performed
1992-09-01 Well Began Injection
1992-09-01 Well Fluid changed to Gas
1992-09-01 Well Type changed to Injection
1992-09-03 Perforation Treatment Performed - Jet Perforation
1992-09-03 Well Log Performed
1992-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-10-01 Well Type changed to Observation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-07-23 2721.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-09-11 Perforation 3157.00 3158.00 7
1989-09-13 Acid Treatment 3157.00 3254.00 0
1990-08-25 Perforation 3068.00 3069.00 13
1990-08-25 Perforation 3072.00 3073.00 13
1990-08-25 Perforation 3076.00 3077.00 13
1990-08-25 Perforation 3082.00 3083.00 13
1990-08-25 Perforation 3085.00 3086.00 13
1990-08-25 Perforation 3088.00 3089.00 13
1990-08-25 Perforation 3093.00 3094.00 13
1990-08-25 Perforation 3096.00 3097.00 13
1990-08-25 Perforation 3099.00 3100.00 13
1989-09-11 Perforation 3161.00 3162.00 7
1990-08-25 Perforation 3102.00 3103.00 13
1990-08-25 Perforation 3109.00 3110.00 13
1990-08-25 Perforation 3112.00 3113.00 13
1990-08-25 Perforation 3117.00 3118.00 13
1990-08-25 Perforation 3121.00 3122.00 13
1990-08-25 Perforation 3125.00 3126.00 13
1990-08-25 Perforation 3130.00 3131.00 13
1990-08-25 Perforation 3133.00 3134.00 13
1990-08-25 Perforation 3136.00 3137.00 13
1990-08-25 Perforation 3139.00 3140.00 13
1989-09-11 Perforation 3171.50 3174.00 7
1990-08-25 Perforation 3142.00 3143.00 13
1990-08-28 Acid Treatment 3068.00 3143.00 0
1991-09-26 Chemical Squeeze 3068.00 3143.00 0
1991-09-28 Chemical Squeeze 3068.00 3143.00 0
1991-11-08 Chemical Squeeze 3068.00 3143.00 0
1991-11-21 Chemical Squeeze 3068.00 3143.00 0
1991-12-31 Chemical Squeeze 3068.00 3143.00 0
1992-03-04 Chemical Squeeze 3068.00 3143.00 0
1992-03-05 Chemical Squeeze 3068.00 3143.00 0
1992-04-06 Chemical Squeeze 3068.00 3143.00 0
1989-09-11 Perforation 3175.50 3178.00 7
1992-09-03 Perforation 2899.00 2903.00 13
1992-09-04 Acid Treatment 2899.00 2903.00 0
1992-09-05 Acid Treatment 2899.00 2903.00 0
1989-09-11 Perforation 3181.50 3187.00 7
1989-09-11 Perforation 3188.50 3195.00 7
1989-09-11 Perforation 3198.50 3200.50 7
1989-09-11 Perforation 3205.00 3212.00 7
1989-09-11 Perforation 3246.50 3254.00 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1275 0.0 0.0 0.0
1990 5429 0.0 0.0 0.0
1991 7780 0.0 0.0 0.0
1992 5158 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1989-08-07 Lost Circulation 3280.00 3280.00

For data sources see[7]