If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495113210002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.274694,"lon":-115.573178,"icon":""}]} |
Location: 00/10-32-049-11W5/2 | |
Location Alias: 00/10-32-49-11 W5M | |
Location Alias 2: 00/10-32-049-11 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 11 | |
Section: 32 | |
County/Municipality: Brazeau County | |
Well Name: KEYERA PEMBINA 10-32-49-11 | |
Operator Name: Keyera Energy Ltd. | |
License Number: 0117340 | |
License Date: 1985-08-29 | |
License Status: Suspension | |
Spud Date: 1985-08-31 | |
Final Drill Date: 1989-08-03 | |
Well Total Depth: 3280.00 m | |
Surface Hole Latitude: 53.274694 | |
Surface Hole Longitude: -115.573178 |
Date | Event |
---|---|
1985-08-29 | Obtained License |
1985-09-01 | Surface Casing Operation Performed |
1985-09-22 | Intermediate Casing Operation Performed |
1989-07-23 | Direction Drilling Operation Performed - Horizontal |
1989-07-24 | Well Log Performed |
1989-08-03 | Finished Drilling |
1989-08-03 | Well Log Performed |
1989-08-03 | Well Mode changed to Drilled and Cased |
1989-08-07 | Lost Circulation Occurred |
1989-08-08 | Liner Casing Operation Performed |
1989-08-08 | Rig Released |
1989-08-28 | Well Log Performed |
1989-09-11 | Perforation Treatment Performed - Jet Perforation |
1989-09-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-15 | Well Began Production |
1989-09-15 | Well Fluid changed to Crude Oil |
1989-09-15 | Well Mode changed to Flowing |
1989-12-08 | Well Log Performed |
1990-01-24 | Well Log Performed |
1990-01-28 | Well Log Performed |
1990-08-25 | Perforation Treatment Performed - Jet Perforation |
1990-08-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-09-26 | Perforation Treatment Performed - Chemical Squeeze |
1991-09-28 | Perforation Treatment Performed - Chemical Squeeze |
1991-11-08 | Perforation Treatment Performed - Chemical Squeeze |
1991-11-21 | Perforation Treatment Performed - Chemical Squeeze |
1991-12-31 | Perforation Treatment Performed - Chemical Squeeze |
1992-03-04 | Perforation Treatment Performed - Chemical Squeeze |
1992-03-05 | Perforation Treatment Performed - Chemical Squeeze |
1992-04-06 | Perforation Treatment Performed - Chemical Squeeze |
1992-08-28 | Well Log Performed |
1992-09-01 | Well Began Injection |
1992-09-01 | Well Fluid changed to Gas |
1992-09-01 | Well Type changed to Injection |
1992-09-03 | Perforation Treatment Performed - Jet Perforation |
1992-09-03 | Well Log Performed |
1992-09-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-09-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-10-01 | Well Type changed to Observation |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1989-07-23 | 2721.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-09-11 | Perforation | 3157.00 | 3158.00 | 7 |
1989-09-13 | Acid Treatment | 3157.00 | 3254.00 | 0 |
1990-08-25 | Perforation | 3068.00 | 3069.00 | 13 |
1990-08-25 | Perforation | 3072.00 | 3073.00 | 13 |
1990-08-25 | Perforation | 3076.00 | 3077.00 | 13 |
1990-08-25 | Perforation | 3082.00 | 3083.00 | 13 |
1990-08-25 | Perforation | 3085.00 | 3086.00 | 13 |
1990-08-25 | Perforation | 3088.00 | 3089.00 | 13 |
1990-08-25 | Perforation | 3093.00 | 3094.00 | 13 |
1990-08-25 | Perforation | 3096.00 | 3097.00 | 13 |
1990-08-25 | Perforation | 3099.00 | 3100.00 | 13 |
1989-09-11 | Perforation | 3161.00 | 3162.00 | 7 |
1990-08-25 | Perforation | 3102.00 | 3103.00 | 13 |
1990-08-25 | Perforation | 3109.00 | 3110.00 | 13 |
1990-08-25 | Perforation | 3112.00 | 3113.00 | 13 |
1990-08-25 | Perforation | 3117.00 | 3118.00 | 13 |
1990-08-25 | Perforation | 3121.00 | 3122.00 | 13 |
1990-08-25 | Perforation | 3125.00 | 3126.00 | 13 |
1990-08-25 | Perforation | 3130.00 | 3131.00 | 13 |
1990-08-25 | Perforation | 3133.00 | 3134.00 | 13 |
1990-08-25 | Perforation | 3136.00 | 3137.00 | 13 |
1990-08-25 | Perforation | 3139.00 | 3140.00 | 13 |
1989-09-11 | Perforation | 3171.50 | 3174.00 | 7 |
1990-08-25 | Perforation | 3142.00 | 3143.00 | 13 |
1990-08-28 | Acid Treatment | 3068.00 | 3143.00 | 0 |
1991-09-26 | Chemical Squeeze | 3068.00 | 3143.00 | 0 |
1991-09-28 | Chemical Squeeze | 3068.00 | 3143.00 | 0 |
1991-11-08 | Chemical Squeeze | 3068.00 | 3143.00 | 0 |
1991-11-21 | Chemical Squeeze | 3068.00 | 3143.00 | 0 |
1991-12-31 | Chemical Squeeze | 3068.00 | 3143.00 | 0 |
1992-03-04 | Chemical Squeeze | 3068.00 | 3143.00 | 0 |
1992-03-05 | Chemical Squeeze | 3068.00 | 3143.00 | 0 |
1992-04-06 | Chemical Squeeze | 3068.00 | 3143.00 | 0 |
1989-09-11 | Perforation | 3175.50 | 3178.00 | 7 |
1992-09-03 | Perforation | 2899.00 | 2903.00 | 13 |
1992-09-04 | Acid Treatment | 2899.00 | 2903.00 | 0 |
1992-09-05 | Acid Treatment | 2899.00 | 2903.00 | 0 |
1989-09-11 | Perforation | 3181.50 | 3187.00 | 7 |
1989-09-11 | Perforation | 3188.50 | 3195.00 | 7 |
1989-09-11 | Perforation | 3198.50 | 3200.50 | 7 |
1989-09-11 | Perforation | 3205.00 | 3212.00 | 7 |
1989-09-11 | Perforation | 3246.50 | 3254.00 | 7 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 1275 | 0.0 | 0.0 | 0.0 |
1990 | 5429 | 0.0 | 0.0 | 0.0 |
1991 | 7780 | 0.0 | 0.0 | 0.0 |
1992 | 5158 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1989-08-07 | Lost Circulation | 3280.00 | 3280.00 |
For data sources see[7]