If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495121212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.218286,"lon":-115.602449,"icon":""}]} |
| Location: 00/12-12-049-12W5/0 | |
| Location Alias: 00/12-12-49-12 W5M | |
| Location Alias 2: 00/12-12-049-12 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 12 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK PEMBINA 12-12-49-12 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0451201 | |
| License Date: 2012-11-30 | |
| License Status: Issued | |
| Spud Date: 2013-03-11 | |
| Final Drill Date: 2013-03-25 | |
| Well Total Depth: 3830.00 m | |
| Surface Hole Latitude: 53.218286 | |
| Surface Hole Longitude: -115.602449 |
| Date | Event |
|---|---|
| 2012-11-30 | Obtained License |
| 2013-03-13 | Surface Casing Operation Performed |
| 2013-03-15 | Direction Drilling Operation Performed - Deviate |
| 2013-03-16 | Direction Drilling Operation Performed - Horizontal |
| 2013-03-17 | Well Log Performed |
| 2013-03-23 | Well Log Performed |
| 2013-03-25 | Finished Drilling |
| 2013-03-25 | Well Log Performed |
| 2013-03-25 | Well Mode changed to Drilled and Cased |
| 2013-03-27 | Production Casing Operation Performed |
| 2013-03-28 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-03-28 | Rig Released |
| 2013-03-30 | Well Log Performed |
| 2013-04-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-04-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-04-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-04-12 | Well Began Production |
| 2013-04-12 | Well Fluid changed to Crude Oil |
| 2013-04-12 | Well Mode changed to Flowing |
| 2013-04-14 | Well Log Performed |
| 2013-05-27 | Well Fluid changed to Crude Oil |
| 2013-05-27 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-03-11 | Ironhand Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-03-15 | 1536.00 | Deviate (5 - 79 degrees) |
| 2013-03-16 | 1942.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-03-28 | Open Hole/Barefoot Completion | 3826.00 | 3830.00 | 0 |
| 2013-04-10 | Multi-Stage Fracture | 3030.90 | 3031.00 | 0 |
| 2013-04-10 | Multi-Stage Fracture | 2953.60 | 2953.70 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2877.90 | 2878.00 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2819.70 | 2819.80 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2743.00 | 2743.10 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2681.10 | 2681.20 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2604.20 | 2604.30 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2541.60 | 2541.70 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2464.60 | 2464.70 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2387.60 | 2387.70 | 0 |
| 2013-04-06 | Multi-Stage Fracture | 3800.30 | 3800.40 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2327.30 | 2327.40 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2250.40 | 2250.50 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2189.60 | 2189.70 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2114.60 | 2114.70 | 0 |
| 2013-04-11 | Multi-Stage Fracture | 2052.60 | 2052.70 | 0 |
| 2013-04-06 | Multi-Stage Fracture | 3730.50 | 3730.60 | 0 |
| 2013-04-10 | Multi-Stage Fracture | 3442.70 | 3442.80 | 0 |
| 2013-04-10 | Multi-Stage Fracture | 3380.80 | 3380.90 | 0 |
| 2013-04-10 | Multi-Stage Fracture | 3305.80 | 3350.90 | 0 |
| 2013-04-10 | Multi-Stage Fracture | 3229.80 | 3229.90 | 0 |
| 2013-04-10 | Multi-Stage Fracture | 3168.10 | 3168.20 | 0 |
| 2013-04-10 | Multi-Stage Fracture | 3092.60 | 3092.70 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-04-06 | 2013-04-11 | 1,829 | 2,733 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 77.4553 | N/A | |||
| 20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 9.4491 | N/A | ||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 5.4376 | N/A | ||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 1.7981 | N/A | ||
| Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0208 | N/A | |
| Water | 7732-18-5 | 100 | 0.0218 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.178 | N/A | |
| DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0824 | N/A | |
| Ethoxylated phenolic resin | 8300 | 100 | 0.0847 | N/A | ||||
| Isobutyl ketone | 8300 | 100 | 0.083 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0968 | N/A | ||||
| Organic acid salts 1 | 8300 | 100 | 0.0824 | N/A | ||||
| Organic acid salts 2 | 8300 | 100 | 0.0839 | N/A | ||||
| Organic acid salts 3 | 8300 | 100 | 0.0847 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 6.751 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0616 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-04-06 | 2013-04-11 | Surface Water - Runoff | 2797 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 5223 | 0.0 | 0.0 | 0.0 |
| 2014 | 8525 | 0.0 | 0.0 | 0.0 |
| 2015 | 8722 | 0.0 | 0.0 | 0.0 |
| 2016 | 8779 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8565 | 0.0 | 0.0 | 0.0 |
| 2019 | 8749 | 0.0 | 0.0 | 0.0 |
| 2020 | 1988 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-03-28 | No Incident Encountered | 0.00 | 0.00 |
| 2013-04-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]