If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495121412000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.23204,"lon":-115.630903,"icon":""}]} |
| Location: 00/12-14-049-12W5/0 | |
| Location Alias: 00/12-14-49-12 W5M | |
| Location Alias 2: 00/12-14-049-12 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 14 | |
| County/Municipality: Yellowhead County | |
| Well Name: RIDGEBACK PEMBINA 12-14-49-12 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0440581 | |
| License Date: 2011-12-07 | |
| License Status: Issued | |
| Spud Date: 2012-02-13 | |
| Final Drill Date: 2012-02-23 | |
| Well Total Depth: 3505.00 m | |
| Surface Hole Latitude: 53.232040 | |
| Surface Hole Longitude: -115.630903 |
| Date | Event |
|---|---|
| 2010-02-23 | Well Log Performed |
| 2011-12-07 | Obtained License |
| 2012-02-15 | Surface Casing Operation Performed |
| 2012-02-15 | Well Log Performed |
| 2012-02-16 | Direction Drilling Operation Performed - Horizontal |
| 2012-02-18 | Well Log Performed |
| 2012-02-23 | Finished Drilling |
| 2012-02-23 | Well Mode changed to Drilled and Cased |
| 2012-02-25 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-02-25 | Production Casing Operation Performed |
| 2012-02-25 | Rig Released |
| 2012-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-03-24 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-03-25 | Well Began Production |
| 2012-03-25 | Well Fluid changed to Crude Oil |
| 2012-03-25 | Well Mode changed to Flowing |
| 2017-04-01 | Well Fluid changed to Crude Oil |
| 2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-13 | Ironhand Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-16 | 2008.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-02-25 | Open Hole/Barefoot Completion | 3503.50 | 3505.00 | 0 |
| 2012-03-23 | Multi-Stage Fracture | 2913.30 | 2913.40 | 0 |
| 2012-03-23 | Multi-Stage Fracture | 2841.60 | 2841.70 | 0 |
| 2012-03-23 | Multi-Stage Fracture | 2781.30 | 2781.40 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2707.70 | 2707.80 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2635.00 | 2635.10 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2562.50 | 2562.60 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2490.60 | 2490.70 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2418.40 | 2418.50 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2357.50 | 2357.60 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2282.60 | 2282.70 | 0 |
| 2012-03-23 | Multi-Stage Fracture | 3478.10 | 3478.20 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2212.20 | 2212.30 | 0 |
| 2012-03-24 | Multi-Stage Fracture | 2150.50 | 2150.60 | 0 |
| 2012-03-23 | Multi-Stage Fracture | 3412.10 | 3412.20 | 0 |
| 2012-03-23 | Multi-Stage Fracture | 3340.20 | 3340.30 | 0 |
| 2012-03-23 | Multi-Stage Fracture | 3266.50 | 3266.60 | 0 |
| 2012-03-23 | Multi-Stage Fracture | 3193.80 | 3193.90 | 0 |
| 2012-03-23 | Multi-Stage Fracture | 3119.70 | 3119.80 | 0 |
| 2012-03-23 | Multi-Stage Fracture | 3063.00 | 3063.10 | 0 |
| 2012-03-23 | Multi-Stage Fracture | 2988.30 | 2988.40 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 5757 | 0.0 | 0.0 | 0.0 |
| 2013 | 8622 | 0.0 | 0.0 | 0.0 |
| 2014 | 8435 | 0.0 | 0.0 | 0.0 |
| 2015 | 8689 | 0.0 | 0.0 | 0.0 |
| 2016 | 8613 | 0.0 | 0.0 | 0.0 |
| 2017 | 8733 | 0.0 | 0.0 | 0.0 |
| 2018 | 8741 | 0.0 | 0.0 | 0.0 |
| 2019 | 8735 | 0.0 | 0.0 | 0.0 |
| 2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-03-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]