If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495122013000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.247489,"lon":-115.704016,"icon":""}]} |
| Location: 00/13-20-049-12W5/0 | |
| Location Alias: 00/13-20-49-12 W5M | |
| Location Alias 2: 00/13-20-049-12 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 20 | |
| County/Municipality: Yellowhead County | |
| Well Name: RIDGEBACK PEMBINA 13-20-49-12 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0447132 | |
| License Date: 2012-07-13 | |
| License Status: Issued | |
| Spud Date: 2012-08-04 | |
| Final Drill Date: 2012-08-16 | |
| Well Total Depth: 3609.00 m | |
| Surface Hole Latitude: 53.247489 | |
| Surface Hole Longitude: -115.704016 |
| Date | Event |
|---|---|
| 2012-07-13 | Obtained License |
| 2012-08-07 | Surface Casing Operation Performed |
| 2012-08-08 | Well Log Performed |
| 2012-08-09 | Direction Drilling Operation Performed - Deviate |
| 2012-08-10 | Direction Drilling Operation Performed - Horizontal |
| 2012-08-10 | Well Log Performed |
| 2012-08-16 | Finished Drilling |
| 2012-08-16 | Well Log Performed |
| 2012-08-16 | Well Mode changed to Drilled and Cased |
| 2012-08-18 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-08-18 | Production Casing Operation Performed |
| 2012-08-18 | Rig Released |
| 2012-08-26 | Well Log Performed |
| 2012-09-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-17 | Well Began Production |
| 2012-09-17 | Well Fluid changed to Crude Oil |
| 2012-09-17 | Well Mode changed to Flowing |
| 2012-09-23 | Well Log Performed |
| 2017-04-01 | Well Fluid changed to Crude Oil |
| 2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-05 | Precision Drilling Corporation | 309 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-08-09 | 1519.00 | Deviate (5 - 79 degrees) |
| 2012-08-10 | 2073.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-08-18 | Open Hole/Barefoot Completion | 3604.00 | 3609.00 | 0 |
| 2012-09-15 | Multi-Stage Fracture | 2996.30 | 2996.40 | 0 |
| 2012-09-15 | Multi-Stage Fracture | 2920.70 | 2920.80 | 0 |
| 2012-09-15 | Multi-Stage Fracture | 2846.80 | 2846.90 | 0 |
| 2012-09-15 | Multi-Stage Fracture | 2771.30 | 2771.40 | 0 |
| 2012-09-16 | Multi-Stage Fracture | 2697.90 | 2698.00 | 0 |
| 2012-09-16 | Multi-Stage Fracture | 2621.80 | 2621.90 | 0 |
| 2012-09-16 | Multi-Stage Fracture | 2547.20 | 2547.30 | 0 |
| 2012-09-16 | Multi-Stage Fracture | 2471.80 | 2471.90 | 0 |
| 2012-09-16 | Multi-Stage Fracture | 2395.50 | 2395.60 | 0 |
| 2012-09-16 | Multi-Stage Fracture | 2320.00 | 2320.10 | 0 |
| 2012-09-14 | Multi-Stage Fracture | 3578.40 | 3578.50 | 0 |
| 2012-09-16 | Multi-Stage Fracture | 2258.60 | 2258.70 | 0 |
| 2012-09-16 | Multi-Stage Fracture | 2182.30 | 2182.40 | 0 |
| 2012-09-14 | Multi-Stage Fracture | 3509.20 | 3509.30 | 0 |
| 2012-09-15 | Multi-Stage Fracture | 3432.60 | 3432.70 | 0 |
| 2012-09-15 | Multi-Stage Fracture | 3360.90 | 3361.00 | 0 |
| 2012-09-15 | Multi-Stage Fracture | 3286.50 | 3286.60 | 0 |
| 2012-09-15 | Multi-Stage Fracture | 3211.10 | 3211.20 | 0 |
| 2012-09-15 | Multi-Stage Fracture | 3134.60 | 3134.70 | 0 |
| 2012-09-15 | Multi-Stage Fracture | 3058.50 | 3058.60 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1671 | 0.0 | 0.0 | 0.0 |
| 2013 | 8599 | 0.0 | 0.0 | 0.0 |
| 2014 | 8725 | 0.0 | 0.0 | 0.0 |
| 2015 | 8229 | 0.0 | 0.0 | 0.0 |
| 2016 | 8734 | 0.0 | 0.0 | 0.0 |
| 2017 | 8709 | 0.0 | 0.0 | 0.0 |
| 2018 | 8731 | 0.0 | 0.0 | 0.0 |
| 2019 | 8654 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-18 | No Incident Encountered | 0.00 | 0.00 |
| 2012-09-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]