If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495122701023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.266596,"lon":-115.658351,"icon":""}]} |
Location: 02/01-27-049-12W5/3 | |
Location Alias: 02/01-27-49-12 W5M | |
Location Alias 2: 02/01-27-049-12 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 27 | |
County/Municipality: Yellowhead County | |
Well Name: MANCAL HZ PEMBINA 1-27-49-12 | |
Operator Name: Mancal Energy Inc. | |
License Number: 0437842 | |
License Date: 2011-10-20 | |
License Status: Amended | |
Spud Date: 2011-11-06 | |
Final Drill Date: 2011-12-13 | |
Well Total Depth: 3567.00 m | |
Surface Hole Latitude: 53.266596 | |
Surface Hole Longitude: -115.658351 |
Date | Event |
---|---|
2011-10-20 | Obtained License |
2011-11-10 | Surface Casing Operation Performed |
2011-11-14 | Direction Drilling Operation Performed - Horizontal |
2011-11-21 | Intermediate Casing Operation Performed |
2011-11-23 | Well Log Performed |
2011-12-05 | Well Log Performed |
2011-12-13 | Finished Drilling |
2011-12-13 | Well Log Performed |
2011-12-13 | Well Mode changed to Drilled and Cased |
2011-12-16 | Liner Casing Operation Performed |
2011-12-18 | Rig Released |
2012-01-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-31 | Well Log Performed |
2012-02-15 | Well Began Production |
2012-02-15 | Well Fluid changed to Gas |
2012-02-15 | Well Mode changed to Flowing |
2015-05-29 | Well Fluid changed to Gas |
2015-05-29 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-14 | 1821.70 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-25 | Multi-Stage Fracture | 2433.10 | 3567.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 7323 | 0.0 | 0.0 | 0.0 |
2013 | 8694 | 0.0 | 0.0 | 0.0 |
2014 | 8689 | 0.0 | 0.0 | 0.0 |
2015 | 7407 | 0.0 | 0.0 | 0.0 |
2016 | 8541 | 0.0 | 0.0 | 0.0 |
2017 | 8420 | 0.0 | 0.0 | 0.0 |
2018 | 8331 | 0.0 | 0.0 | 0.0 |
2019 | 8189 | 0.0 | 0.0 | 0.0 |
2020 | 2136 | 0.0 | 0.0 | 0.0 |
For data sources see[6]