X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495203316000

Well Details

Well ID: 0495203316000
Loading map...
Location: 00/16-33-049-20W5/0
Location Alias: 00/16-33-49-20 W5M
Location Alias 2: 00/16-33-049-20 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 20
Section: 33
County/Municipality: Yellowhead County
Well Name: TOURMALINE HZ MINEHEAD 16-33-49-20
Operator Name: Tourmaline Oil Corp.
License Number: 0475652
License Date: 2015-06-03
License Status: Amended
Spud Date: 2015-06-29
Final Drill Date: 2015-07-25
Well Total Depth: 4826.00 m
Surface Hole Latitude: 53.262926
Surface Hole Longitude: -116.859411

For data sources see[1][2]

Well History

Date Event
2015-06-03 Obtained License
2015-06-30 Surface Casing Operation Performed
2015-07-07 Intermediate Casing Operation Performed
2015-07-10 Direction Drilling Operation Performed - Deviate
2015-07-16 Direction Drilling Operation Performed - Horizontal
2015-07-17 Well Log Performed
2015-07-25 Finished Drilling
2015-07-25 Well Mode changed to Drilled and Cased
2015-07-30 Production Casing Operation Performed
2015-07-30 Rig Released
2015-08-24 Well Log Performed
2015-09-05 Well Log Performed
2015-09-08 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-11 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-16 Well Began Production
2015-09-16 Well Fluid changed to Gas
2015-09-16 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-06-29 Nabors Drilling Limited 78 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-10 2984.80 Deviate (5 - 79 degrees)
2015-07-16 3384.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-08 Multi-Stage Fracture 4779.20 4779.30 0
2015-09-10 Multi-Stage Fracture 4309.20 4309.30 0
2015-09-10 Multi-Stage Fracture 4256.00 4256.10 0
2015-09-10 Multi-Stage Fracture 4202.70 4202.80 0
2015-09-10 Multi-Stage Fracture 4149.50 4149.60 0
2015-09-10 Multi-Stage Fracture 4096.40 4096.50 0
2015-09-10 Multi-Stage Fracture 4043.30 4043.40 0
2015-09-10 Multi-Stage Fracture 3990.10 3990.20 0
2015-09-10 Multi-Stage Fracture 3936.90 3937.00 0
2015-09-10 Multi-Stage Fracture 3884.00 3884.10 0
2015-09-10 Multi-Stage Fracture 3830.90 3831.00 0
2015-09-09 Multi-Stage Fracture 4734.10 4734.20 0
2015-09-11 Multi-Stage Fracture 3777.70 3777.80 0
2015-09-11 Multi-Stage Fracture 3724.50 3724.60 0
2015-09-11 Multi-Stage Fracture 3671.30 3671.40 0
2015-09-11 Multi-Stage Fracture 3618.10 3618.20 0
2015-09-11 Multi-Stage Fracture 3565.00 3565.10 0
2015-09-11 Multi-Stage Fracture 3511.70 3511.80 0
2015-09-11 Multi-Stage Fracture 3458.50 3458.60 0
2015-09-09 Multi-Stage Fracture 4680.80 4680.90 0
2015-09-09 Multi-Stage Fracture 4627.60 4627.70 0
2015-09-10 Multi-Stage Fracture 4574.40 4574.50 0
2015-09-10 Multi-Stage Fracture 4521.20 4521.30 0
2015-09-10 Multi-Stage Fracture 4468.00 4468.10 0
2015-09-10 Multi-Stage Fracture 4415.40 4415.50 0
2015-09-10 Multi-Stage Fracture 4362.20 4362.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-08 2015-09-11 3,279 6,549 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.4285 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.6307 N/A
silica crystalline 14808-60-7 100 3.6307 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 10.094 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.4854 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0124 N/A
dibromoacetonitrile 3252-43-5 100 0.0124 N/A
non-hazardous ingredients Not Available 100 0.0124 N/A
polyethylene glycol 25322-68-3 100 0.0124 N/A
sodium bromide 7647-15-6 100 0.0124 N/A
CC-77 Trican Clay Control 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide 7744 100 0.1884 N/A
non-hazardous ingredients Not Available 100 0.1884 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0892 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0892 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0892 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0892 N/A
non-hazardous ingredients Not Available 100 0.0892 N/A
S-2 Trican Surfactant 2-ethylhexanol 104-76-7 100 0.0709 N/A
isopropanol 67-63-0 100 0.0709 N/A
methanol 67-56-1 100 0.0709 N/A
oxydiethylenebis(alkyldimethyl ammonium chloride) 68607-28-3 100 0.0709 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0709 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-27 2015-09-06 Recycled Fracturing Water (treated at well site) 2519
2015-09-06 2015-09-06 Recycled Fracturing Water (treated at well site) 1023
2015-09-10 2015-09-13 Surface Water - Lake 2342
2015-09-09 2015-09-11 Recycled Fracturing Water (treated at well site) 665

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1442 0.0 0.0 0.0
2016 7118 0.0 0.0 0.0
2017 4392 0.0 0.0 0.0
2018 6929 0.0 0.0 0.0
2019 8265 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-25 No Incident Encountered 0.00 0.00
2015-09-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References