If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0495241910002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.243147,"lon":-117.489689,"icon":""}]} |
| Location: 00/10-19-049-24W5/2 | |
| Location Alias: 00/10-19-49-24 W5M | |
| Location Alias 2: 00/10-19-049-24 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 049 | |
| Meridian: 5 | |
| Range: 24 | |
| Section: 19 | |
| County/Municipality: Yellowhead County | |
| Well Name: IKM ANTLER 10-19-49-24 | |
| Operator Name: Pieridae Alberta Production Ltd. | |
| License Number: 0247683 | |
| License Date: 2000-12-20 | |
| License Status: Suspension | |
| Spud Date: 2001-01-21 | |
| Final Drill Date: 2001-02-05 | |
| Well Total Depth: 1985.00 m | |
| Surface Hole Latitude: 53.243147 | |
| Surface Hole Longitude: -117.489689 |
| Date | Event |
|---|---|
| 2000-12-20 | Obtained License |
| 2001-01-24 | Surface Casing Operation Performed |
| 2001-01-26 | Direction Drilling Operation Performed - Deviate |
| 2001-01-30 | Drill Stem Test Performed |
| 2001-02-03 | Drill Stem Test Performed |
| 2001-02-05 | Finished Drilling |
| 2001-02-05 | Well Mode changed to Drilled and Cased |
| 2001-02-07 | Drill Stem Test Performed |
| 2001-02-07 | Well Log Performed |
| 2001-02-09 | Drill Stem Test Performed |
| 2001-02-10 | Production Casing Operation Performed |
| 2001-02-11 | Rig Released |
| 2001-02-27 | Well Log Performed |
| 2001-02-28 | Perforation Treatment Performed - Jet Perforation |
| 2001-02-28 | Well Log Performed |
| 2001-03-08 | Well Log Performed |
| 2001-03-10 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2001-01-26 | 552.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2001-02-28 | Perforation | 1516.00 | 1530.00 | 17 |
| 2001-03-10 | Perforation | 1271.00 | 1277.00 | 20 |
For data sources see[5]