If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504011006D00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.298923,"lon":-110.067991,"icon":""}]} |
Location: D0/06-10-050-01W4/0 | |
Location Alias: D0/06-10-50-01 W4M | |
Location Alias 2: D0/06-10-050-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 01 | |
Section: 10 | |
County/Municipality: County of Vermilion River | |
Well Name: C.L. NO. 3 WELL | |
Operator Name: Commoil Limited | |
License Number: B0001558 | |
License Date: 1946-12-04 | |
License Status: RecExempt | |
Spud Date: 1946-12-12 | |
Final Drill Date: 1946-12-26 | |
Well Total Depth: 595.30 m | |
Surface Hole Latitude: 53.298923 | |
Surface Hole Longitude: -110.067991 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1946-12-04 | Obtained License |
1946-12-26 | Finished Drilling |
1946-12-26 | Well Mode changed to Drilled and Cased |
1946-12-27 | Drill Stem Test Performed |
1946-12-28 | Production Casing Operation Performed |
1947-01-18 | Perforation Treatment Performed - Open-Hole Completion |
1947-01-24 | Well Began Production |
1947-01-24 | Well Fluid changed to Crude Oil |
1947-01-24 | Well Mode changed to Pumping |
1947-04-13 | Perforation Treatment Performed - Bullet Perforation |
1947-10-23 | Perforation Treatment Performed - Bullet Perforation |
1948-05-21 | Perforation Treatment Performed - Cement Squeeze |
1948-05-21 | Well Fluid changed to Crude Oil |
1948-05-21 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1947-01-18 | Open Hole/Barefoot Completion | 589.50 | 595.30 | 0 |
1947-04-13 | Bullet Perforation | 589.50 | 590.40 | 10 |
1947-10-23 | Bullet Perforation | 545.90 | 546.50 | 16 |
1947-10-23 | Bullet Perforation | 546.50 | 547.40 | 16 |
1947-10-23 | Bullet Perforation | 543.80 | 548.00 | 3 |
1948-05-21 | Cement Squeeze | 536.80 | 595.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]