If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504012113A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.333456,"lon":-110.098407,"icon":""}]} |
| Location: A0/13-21-050-01W4/0 | |
| Location Alias: A0/13-21-50-01 W4M | |
| Location Alias 2: A0/13-21-050-01 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 01 | |
| Section: 21 | |
| County/Municipality: County of Vermilion River | |
| Well Name: PACIFIC WESTERN MARTIN NO. 77-21 | |
| Operator Name: Canadian Reserve Oil And Gas Ltd. | |
| License Number: 0004558 | |
| License Date: 1952-04-24 | |
| License Status: RecCertified | |
| Spud Date: 1952-05-15 | |
| Final Drill Date: 1952-05-22 | |
| Well Total Depth: 625.10 m | |
| Surface Hole Latitude: 53.333456 | |
| Surface Hole Longitude: -110.098407 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1952-04-24 | Obtained License |
| 1952-05-22 | Finished Drilling |
| 1952-05-22 | Well Mode changed to Drilled and Cased |
| 1952-05-23 | Production Casing Operation Performed |
| 1952-05-25 | Perforation Treatment Performed - Bullet Perforation |
| 1952-05-25 | Perforation Treatment Performed - Cement Squeeze |
| 1952-05-26 | Perforation Treatment Performed - Bullet Perforation |
| 1952-05-26 | Perforation Treatment Performed - Cement Squeeze |
| 1952-05-29 | Perforation Treatment Performed - Bullet Perforation |
| 1952-05-31 | Perforation Treatment Performed - Bullet Perforation |
| 1952-06-05 | Perforation Treatment Performed - Bullet Perforation |
| 1952-06-07 | Perforation Treatment Performed - Bullet Perforation |
| 1952-06-12 | Well Began Production |
| 1952-06-12 | Well Fluid changed to Crude Oil |
| 1952-06-12 | Well Mode changed to Pumping |
| 1953-10-21 | Well Fluid changed to Crude Oil |
| 1953-10-21 | Well Mode changed to Suspended |
| 1954-08-18 | Perforation Treatment Performed - Cement Squeeze |
| 1955-06-05 | Perforation Treatment Performed - Jet Perforation |
| 1955-06-06 | Perforation Treatment Performed - Jet Perforation |
| 1955-06-09 | Well Fluid changed to Crude Oil |
| 1955-06-09 | Well Mode changed to Pumping |
| 1968-07-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1968-07-08 | Perforation Treatment Performed - Cement Plug |
| 1968-07-08 | Well Abandoned |
| 1968-07-08 | Well Fluid changed to Crude Oil |
| 1968-07-08 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1952-05-25 | Bullet Perforation | 613.90 | 614.50 | 16 |
| 1952-06-07 | Bullet Perforation | 593.80 | 594.70 | 10 |
| 1954-08-18 | Cement Squeeze | 593.80 | 605.30 | 0 |
| 1955-06-05 | Perforation | 593.10 | 594.10 | 7 |
| 1955-06-06 | Perforation | 588.90 | 589.50 | 7 |
| 1968-07-08 | Packing Device Capped w/Cement | 585.20 | 585.20 | 0 |
| 1968-07-08 | Cement Plug | 581.90 | 585.20 | 0 |
| 1952-05-25 | Cement Squeeze | 613.90 | 614.50 | 0 |
| 1952-05-26 | Bullet Perforation | 582.80 | 583.40 | 16 |
| 1952-05-26 | Cement Squeeze | 582.80 | 583.40 | 0 |
| 1952-05-29 | Bullet Perforation | 603.80 | 604.70 | 10 |
| 1952-05-29 | Bullet Perforation | 604.40 | 605.30 | 7 |
| 1952-05-31 | Bullet Perforation | 603.80 | 604.40 | 7 |
| 1952-05-31 | Bullet Perforation | 605.30 | 605.90 | 7 |
| 1952-06-05 | Bullet Perforation | 593.80 | 594.70 | 10 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 0 | 0.0 | 0.0 | 0.0 |
| 1968 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]