If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504012113C00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.335261,"lon":-110.101425,"icon":""}]} |
| Location: C0/13-21-050-01W4/0 | |
| Location Alias: C0/13-21-50-01 W4M | |
| Location Alias 2: C0/13-21-050-01 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 01 | |
| Section: 21 | |
| County/Municipality: County of Vermilion River | |
| Well Name: PACIFIC WESTERN MARTIN NO. 88-21 | |
| Operator Name: Canadian Reserve Oil And Gas Ltd. | |
| License Number: 0006324 | |
| License Date: 1953-04-18 | |
| License Status: RecExempt | |
| Spud Date: 1953-05-18 | |
| Final Drill Date: 1953-05-24 | |
| Well Total Depth: 623.30 m | |
| Surface Hole Latitude: 53.335261 | |
| Surface Hole Longitude: -110.101425 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1953-04-18 | Obtained License |
| 1953-05-24 | Finished Drilling |
| 1953-05-24 | Production Casing Operation Performed |
| 1953-05-24 | Well Mode changed to Drilled and Cased |
| 1953-05-27 | Perforation Treatment Performed - Bullet Perforation |
| 1953-05-27 | Perforation Treatment Performed - Cement Squeeze |
| 1953-05-29 | Perforation Treatment Performed - Bullet Perforation |
| 1953-05-29 | Perforation Treatment Performed - Cement Squeeze |
| 1953-06-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1953-06-04 | Perforation Treatment Performed - Bullet Perforation |
| 1953-06-04 | Perforation Treatment Performed - Cement Squeeze |
| 1953-06-09 | Perforation Treatment Performed - Bullet Perforation |
| 1953-06-21 | Well Began Production |
| 1953-06-21 | Well Fluid changed to Crude Oil |
| 1953-06-21 | Well Mode changed to Pumping |
| 1954-08-08 | Perforation Treatment Performed - Cement Squeeze |
| 1954-08-11 | Perforation Treatment Performed - Bullet Perforation |
| 1954-08-12 | Perforation Treatment Performed - Cement Squeeze |
| 1954-08-13 | Perforation Treatment Performed - Bullet Perforation |
| 1956-11-23 | Well Fluid changed to Crude Oil |
| 1956-11-23 | Well Mode changed to Suspended |
| 1958-04-09 | Well Fluid changed to Crude Oil |
| 1958-04-09 | Well Mode changed to Pumping |
| 1963-02-09 | Perforation Treatment Performed - Cement Plug |
| 1963-02-09 | Well Abandoned |
| 1963-02-09 | Well Fluid changed to Crude Oil |
| 1963-02-09 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1953-05-27 | Bullet Perforation | 597.10 | 598.00 | 10 |
| 1954-08-08 | Cement Squeeze | 600.20 | 601.40 | 0 |
| 1954-08-11 | Bullet Perforation | 600.20 | 601.10 | 7 |
| 1954-08-12 | Cement Squeeze | 600.20 | 601.10 | 0 |
| 1954-08-13 | Bullet Perforation | 589.50 | 590.10 | 7 |
| 1963-02-09 | Cement Plug | 545.60 | 605.90 | 0 |
| 1953-05-27 | Cement Squeeze | 597.10 | 598.00 | 0 |
| 1953-05-29 | Bullet Perforation | 584.30 | 585.20 | 10 |
| 1953-05-29 | Cement Squeeze | 584.30 | 585.20 | 0 |
| 1953-06-04 | Packing Device Capped w/Cement | 618.70 | 618.70 | 0 |
| 1953-06-04 | Bullet Perforation | 612.60 | 613.30 | 10 |
| 1953-06-04 | Cement Squeeze | 612.60 | 613.30 | 0 |
| 1953-06-09 | Bullet Perforation | 600.20 | 601.10 | 7 |
| 1953-06-09 | Bullet Perforation | 600.50 | 601.40 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]