X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504012410C02

Well Details

Well ID: 0504012410C02
Loading map...
Location: C0/10-24-050-01W4/2
Location Alias: C0/10-24-50-01 W4M
Location Alias 2: C0/10-24-050-01 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 01
Section: 24
County/Municipality: County of Vermilion River
Well Name: PRIOR LLOYD 10C-24-50-1
Operator Name: Prior Resources Ltd.
License Number: 0050145
License Date: 1974-06-17
License Status: Re-Entered
Spud Date: 1975-03-25
Final Drill Date: 1975-04-01
Well Total Depth: 591.30 m
Surface Hole Latitude: 53.331644
Surface Hole Longitude: -110.016208

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-06-17 Obtained License
1975-04-01 Finished Drilling
1975-04-01 Perforation Treatment Performed - Bullet Perforation
1975-04-01 Well Mode changed to Drilled and Cased
1975-04-04 Well Began Production
1975-04-04 Well Fluid changed to Crude Oil
1975-04-04 Well Mode changed to Pumping
1977-08-22 Well Fluid changed to Crude Oil
1977-08-22 Well Mode changed to Suspended
1990-04-01 Well Fluid changed to Crude Oil
1990-04-01 Well Mode changed to Pumping
1996-04-17 Well Fluid changed to Crude Oil
1996-04-17 Well Mode changed to Closed
1996-10-16 Well Fluid changed to Crude Oil
1996-10-16 Well Mode changed to Pumping
1997-01-30 Well Fluid changed to Crude Oil
1997-01-30 Well Mode changed to Closed
1997-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-23 Perforation Treatment Performed - Jet Perforation
1997-09-23 Perforation Treatment Performed - Remedial Casing
1997-09-23 Plug Back Performed
1997-09-23 Well Fluid changed to Crude Oil
1997-09-23 Well Mode changed to Abandoned Zone
1997-09-28 Well Abandoned
1997-09-28 Well Fluid changed to Crude Oil
1997-09-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-04-01 Bullet Perforation 559.90 562.10 7
1997-09-23 Packing Device Capped w/Cement 541.40 549.40 0
1997-09-23 Perforation 160.00 161.00 13
1997-09-23 Remedial Casing Cementing 160.00 161.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 3144 0.0 0.0 0.0
1976 4776 0.0 0.0 0.0
1977 656 0.0 0.0 0.0
1990 1752 0.0 0.0 0.0
1991 5234 0.0 0.0 0.0
1992 2183 0.0 0.0 0.0
1993 720 0.0 0.0 0.0

For data sources see[5]

References