If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504060216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.279633,"lon":-110.758263,"icon":""}]} |
| Location: 00/16-02-050-06W4/0 | |
| Location Alias: 00/16-02-50-06 W4M | |
| Location Alias 2: 00/16-02-050-06 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 06 | |
| Section: 02 | |
| County/Municipality: County of Vermilion River | |
| Well Name: SPL 4-1 HZ VERMIL 16-2-50-6 | |
| Operator Name: Spur Petroleum Ltd. | |
| License Number: 0437081 | |
| License Date: 2011-09-23 | |
| License Status: Issued | |
| Spud Date: 2011-09-28 | |
| Final Drill Date: 2011-10-01 | |
| Well Total Depth: 1460.00 m | |
| Surface Hole Latitude: 53.279633 | |
| Surface Hole Longitude: -110.758263 |
| Date | Event |
|---|---|
| 2011-09-23 | Obtained License |
| 2011-09-29 | Direction Drilling Operation Performed - Horizontal |
| 2011-09-29 | Surface Casing Operation Performed |
| 2011-10-01 | Finished Drilling |
| 2011-10-01 | Production Casing Operation Performed |
| 2011-10-01 | Rig Released |
| 2011-10-01 | Well Log Performed |
| 2011-10-01 | Well Mode changed to Drilled and Cased |
| 2011-10-04 | Well Log Performed |
| 2011-10-26 | Perforation Treatment Performed - Jet Perforation |
| 2011-10-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-12-08 | Well Began Production |
| 2011-12-08 | Well Fluid changed to Shale Gas Only |
| 2011-12-08 | Well Mode changed to Flowing |
| 2012-01-31 | Well Fluid changed to Shale Gas Only |
| 2012-01-31 | Well Mode changed to Suspended |
| 2013-04-15 | Well Fluid changed to Shale Gas Only |
| 2013-04-15 | Well Mode changed to Flowing |
| 2016-04-30 | Well Fluid changed to Shale Gas Only |
| 2016-04-30 | Well Mode changed to Suspended |
| 2017-02-08 | Well Fluid changed to Shale Gas Only |
| 2017-02-08 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-09-29 | 116.40 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-10-26 | Perforation | 1430.00 | 1430.50 | 17 |
| 2011-10-26 | Perforation | 638.00 | 638.50 | 17 |
| 2011-10-26 | Perforation | 553.00 | 553.50 | 17 |
| 2011-10-28 | Multi-Stage Fracture | 1430.00 | 1430.50 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 1342.00 | 1342.50 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 1251.00 | 1251.50 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 1166.00 | 1166.50 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 1075.00 | 1075.50 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 990.00 | 990.50 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 904.00 | 904.50 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 728.00 | 728.50 | 0 |
| 2011-10-26 | Perforation | 1342.00 | 1342.50 | 17 |
| 2011-10-28 | Multi-Stage Fracture | 638.00 | 638.50 | 0 |
| 2011-10-28 | Multi-Stage Fracture | 553.00 | 553.50 | 0 |
| 2011-10-26 | Perforation | 1251.00 | 1251.50 | 17 |
| 2011-10-26 | Perforation | 1166.00 | 1166.50 | 17 |
| 2011-10-26 | Perforation | 1075.00 | 1075.50 | 17 |
| 2011-10-26 | Perforation | 990.00 | 990.50 | 17 |
| 2011-10-26 | Perforation | 904.00 | 904.50 | 17 |
| 2011-10-26 | Perforation | 814.00 | 814.50 | 17 |
| 2011-10-26 | Perforation | 728.00 | 728.50 | 17 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 552 | 0.0 | 0.0 | 0.0 |
| 2013 | 5955 | 0.0 | 0.0 | 0.0 |
| 2014 | 8413 | 0.0 | 0.0 | 0.0 |
| 2015 | 8676 | 0.0 | 0.0 | 0.0 |
| 2016 | 2850 | 0.0 | 0.0 | 0.0 |
| 2017 | 7847 | 0.0 | 0.0 | 0.0 |
| 2018 | 7593 | 0.0 | 0.0 | 0.0 |
| 2019 | 7703 | 0.0 | 0.0 | 0.0 |
| 2020 | 2134 | 0.0 | 0.0 | 0.0 |
For data sources see[6]