If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504062510020 | |
Location: 02/10-25-050-06W4/0 | |
Location Alias: 02/10-25-50-06 W4M | |
Location Alias 2: 02/10-25-050-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 06 | |
Section: 25 | |
County/Municipality: County of Vermilion River | |
Well Name: GEAR 102 VERMIL 10-25-50-6 | |
Operator Name: Gear Energy Ltd. | |
License Number: 0430327 | |
License Date: 2011-01-20 | |
License Status: Suspension | |
Spud Date: 2011-02-02 | |
Final Drill Date: 2011-02-05 | |
Well Total Depth: 799.00 m | |
Surface Hole Latitude: 53.340853 | |
Surface Hole Longitude: -110.744995 |
Date | Event |
---|---|
2011-01-20 | Obtained License |
2011-02-03 | Surface Casing Operation Performed |
2011-02-04 | Direction Drilling Operation Performed - Deviate |
2011-02-05 | Finished Drilling |
2011-02-05 | Well Mode changed to Drilled and Cased |
2011-02-06 | Well Log Performed |
2011-02-07 | Production Casing Operation Performed |
2011-02-07 | Rig Released |
2011-03-03 | Perforation Treatment Performed - Jet Perforation |
2011-03-03 | Well Log Performed |
2011-03-04 | Well Began Production |
2011-03-04 | Well Fluid changed to Crude Oil |
2011-03-04 | Well Mode changed to Pumping |
2012-04-01 | Well Fluid changed to Crude Oil |
2012-04-01 | Well Mode changed to Suspended |
2012-05-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-05-09 | Perforation Treatment Performed - Jet Perforation |
2012-05-09 | Plug Back Performed |
2012-05-09 | Well Fluid changed to Crude Oil |
2012-05-09 | Well Log Performed |
2012-05-09 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-04 | 127.50 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-03-03 | Perforation | 752.50 | 754.50 | 26 |
2012-05-09 | Packing Device Capped w/Cement | 739.00 | 747.00 | 0 |
2012-05-09 | Perforation | 644.00 | 647.00 | 26 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2066 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]