X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504070504000

Well Details

Well ID: 0504070504000
Loading map...
Location: 00/04-05-050-07W4/0
Location Alias: 00/04-05-50-07 W4M
Location Alias 2: 00/04-05-050-07 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 07
Section: 05
County/Municipality: County of Vermilion River
Well Name: SPL 4-4 HZ WILDMERE 4-5-50-7
Operator Name: Spur Petroleum Ltd.
License Number: 0435422
License Date: 2011-07-23
License Status: Issued
Spud Date: 2011-09-03
Final Drill Date: 2011-09-05
Well Total Depth: 1802.00 m
Surface Hole Latitude: 53.281179
Surface Hole Longitude: -110.977693

For data sources see[1][2]

Well History

Date Event
2011-07-23 Obtained License
2011-09-03 Surface Casing Operation Performed
2011-09-04 Direction Drilling Operation Performed - Horizontal
2011-09-04 Well Log Performed
2011-09-05 Finished Drilling
2011-09-05 Well Mode changed to Drilled and Cased
2011-09-06 Production Casing Operation Performed
2011-09-06 Rig Released
2011-09-18 Well Log Performed
2011-09-22 Perforation Treatment Performed - Jet Perforation
2011-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-25 Well Began Production
2011-11-25 Well Fluid changed to Shale Gas Only
2011-11-25 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-04 172.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-22 Perforation 1689.00 1689.50 20
2011-09-22 Perforation 886.00 886.50 20
2011-09-22 Perforation 790.00 790.50 20
2011-09-22 Perforation 697.00 697.50 20
2011-09-22 Perforation 600.00 600.50 20
2011-09-29 Multi-Stage Fracture 1689.00 1689.50 0
2011-09-29 Multi-Stage Fracture 1629.00 1629.50 0
2011-09-29 Multi-Stage Fracture 1534.00 1534.50 0
2011-09-29 Multi-Stage Fracture 1441.00 1441.50 0
2011-09-29 Multi-Stage Fracture 1347.00 1347.50 0
2011-09-29 Multi-Stage Fracture 1260.00 1260.50 0
2011-09-22 Perforation 1629.00 1629.50 20
2011-09-29 Multi-Stage Fracture 1162.00 1162.50 0
2011-09-29 Multi-Stage Fracture 1069.00 1069.50 0
2011-09-29 Multi-Stage Fracture 973.00 973.50 0
2011-09-29 Multi-Stage Fracture 886.00 886.50 0
2011-09-29 Multi-Stage Fracture 790.00 790.50 0
2011-09-22 Perforation 1534.00 1534.50 20
2011-09-22 Perforation 1441.00 1441.50 20
2011-09-22 Perforation 1347.00 1347.50 20
2011-09-22 Perforation 1260.00 1260.50 20
2011-09-22 Perforation 1162.00 1162.50 20
2011-09-22 Perforation 1069.00 1069.50 20
2011-09-22 Perforation 973.00 973.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 707 0.0 0.0 0.0
2012 5688 0.0 0.0 0.0
2013 8671 0.0 0.0 0.0
2014 8644 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 7439 0.0 0.0 0.0
2017 8707 0.0 0.0 0.0
2018 8372 0.0 0.0 0.0
2019 6140 0.0 0.0 0.0
2020 1128 0.0 0.0 0.0

For data sources see[6]

References