If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504082801000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.350801,"lon":-111.11543,"icon":""}]} |
Location: 00/01-28-050-08W4/0 | |
Location Alias: 00/01-28-50-08 W4M | |
Location Alias 2: 00/01-28-050-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 08 | |
Section: 28 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: PEINC HZ MANN 1-28-50-8 | |
Operator Name: Perpetual Energy Inc. | |
License Number: 0433773 | |
License Date: 2011-05-26 | |
License Status: Issued | |
Spud Date: 2011-05-30 | |
Final Drill Date: 2011-06-05 | |
Well Total Depth: 2236.00 m | |
Surface Hole Latitude: 53.350801 | |
Surface Hole Longitude: -111.115430 |
Date | Event |
---|---|
2011-05-26 | Obtained License |
2011-05-30 | Surface Casing Operation Performed |
2011-05-31 | Direction Drilling Operation Performed - Deviate |
2011-05-31 | Direction Drilling Operation Performed - Horizontal |
2011-05-31 | Well Log Performed |
2011-06-02 | Well Log Performed |
2011-06-05 | Finished Drilling |
2011-06-05 | Well Mode changed to Drilled and Cased |
2011-06-06 | Perforation Treatment Performed - Open-Hole Completion |
2011-06-06 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-06-06 | Production Casing Operation Performed |
2011-06-06 | Rig Released |
2011-06-23 | Well Log Performed |
2011-06-28 | Perforation Treatment Performed - Jet Perforation |
2011-06-28 | Perforation Treatment Performed - Remedial Casing |
2011-07-18 | Well Began Production |
2011-07-18 | Well Fluid changed to Crude Oil |
2011-07-18 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-05-31 | 292.50 | Deviate (5 - 79 degrees) |
2011-05-31 | 721.90 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-06-06 | Slotted Liner | 767.30 | 2037.00 | 0 |
2011-06-06 | Open Hole/Barefoot Completion | 2037.00 | 2236.00 | 0 |
2011-06-28 | Perforation | 215.00 | 216.00 | 17 |
2011-06-28 | Remedial Casing Cementing | 215.00 | 216.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3145 | 0.0 | 0.0 | 0.0 |
2012 | 8279 | 0.0 | 0.0 | 0.0 |
2013 | 8490 | 0.0 | 0.0 | 0.0 |
2014 | 8745 | 0.0 | 0.0 | 0.0 |
2015 | 7148 | 0.0 | 0.0 | 0.0 |
2016 | 7560 | 0.0 | 0.0 | 0.0 |
2017 | 8558 | 0.0 | 0.0 | 0.0 |
2018 | 6097 | 0.0 | 0.0 | 0.0 |
2019 | 8567 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]