If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504090103002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.280507,"lon":-111.187856,"icon":""}]} |
Location: 00/03-01-050-09W4/2 | |
Location Alias: 00/03-01-50-09 W4M | |
Location Alias 2: 00/03-01-050-09 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 09 | |
Section: 01 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: POC MANN 3-1-50-9 | |
Operator Name: Perpetual Operating Corp. | |
License Number: 0186087 | |
License Date: 1996-02-22 | |
License Status: Issued | |
Spud Date: 1996-02-24 | |
Final Drill Date: 1996-02-26 | |
Well Total Depth: 601.50 m | |
Surface Hole Latitude: 53.280507 | |
Surface Hole Longitude: -111.187856 |
Date | Event |
---|---|
1996-02-22 | Obtained License |
1996-02-25 | Surface Casing Operation Performed |
1996-02-26 | Finished Drilling |
1996-02-26 | Well Mode changed to Drilled and Cased |
1996-02-27 | Production Casing Operation Performed |
1996-02-27 | Well Log Performed |
1996-02-28 | Rig Released |
1996-03-11 | Perforation Treatment Performed - Open-Hole Completion |
1996-06-10 | Well Log Performed |
1996-06-13 | Well Log Performed |
1996-06-16 | Perforation Treatment Performed - Open-Hole Completion |
2004-12-04 | Liner Casing Operation Performed |
2004-12-04 | Perforation Treatment Performed - Slotted Liner or Casing |
2004-12-05 | Well Log Performed |
2005-05-09 | Perforation Treatment Performed - Jet Perforation |
2005-05-09 | Well Log Performed |
2005-05-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-05-10 | Perforation Treatment Performed - Jet Perforation |
2005-05-10 | Plug Back Performed |
2005-05-10 | Well Log Performed |
2005-05-11 | Perforation Treatment Performed - Jet Perforation |
2005-05-11 | Well Log Performed |
2005-05-27 | Perforation Treatment Performed - Fractured |
2005-05-31 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-03-11 | Open Hole/Barefoot Completion | 592.40 | 598.40 | 0 |
2005-05-27 | Fracture | 414.00 | 431.00 | 0 |
1996-06-16 | Open Hole/Barefoot Completion | 592.40 | 601.50 | 0 |
2004-12-04 | Slotted Liner | 577.50 | 598.50 | 0 |
2005-05-09 | Perforation | 577.00 | 579.00 | 17 |
2005-05-10 | Packing Device Capped w/Cement | 567.00 | 575.00 | 0 |
2005-05-10 | Perforation | 559.00 | 562.00 | 17 |
2005-05-10 | Perforation | 552.00 | 558.00 | 17 |
2005-05-11 | Perforation | 429.00 | 431.00 | 17 |
2005-05-11 | Perforation | 414.00 | 424.00 | 17 |
For data sources see[4]