X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504090611000

Well Details

Well ID: 0504090611000
Loading map...
Location: 00/11-06-050-09W4/0
Location Alias: 00/11-06-50-09 W4M
Location Alias 2: 00/11-06-050-09 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 09
Section: 06
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 11-6-50-9
Operator Name: Perpetual Operating Corp.
License Number: 0041941
License Date: 1972-01-19
License Status: Suspension
Spud Date: 1972-01-20
Final Drill Date: 1972-01-26
Well Total Depth: 762.00 m
Surface Hole Latitude: 53.287705
Surface Hole Longitude: -111.314171

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-01-19 Obtained License
1972-01-26 Finished Drilling
1972-01-26 Well Mode changed to Drilled and Cased
1972-01-28 Drill Stem Test Performed
1972-01-29 Drill Stem Test Performed
1972-01-30 Production Casing Operation Performed
1973-06-22 Perforation Treatment Performed - Jet Perforation
1973-11-11 Well Began Production
1973-11-11 Well Fluid changed to Gas
1973-11-11 Well Mode changed to Flowing
2001-06-13 Perforation Treatment Performed - Cement Squeeze
2001-06-13 Plug Back Performed
2001-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-17 Perforation Treatment Performed - Jet Perforation
2001-06-17 Plug Back Performed
2001-06-17 Well Fluid changed to Gas
2001-06-17 Well Log Performed
2001-06-17 Well Mode changed to Abandoned Zone
2001-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-18 Plug Back Performed
2001-06-18 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-06-22 Perforation 584.60 585.80 13
2001-06-18 Packing Device Capped w/Cement 614.00 622.00 0
1973-06-22 Perforation 591.00 591.60 13
1973-06-22 Perforation 664.20 665.40 13
2001-06-13 Cement Squeeze 664.30 665.20 0
2001-06-13 Cement Squeeze 584.80 586.00 0
2001-06-13 Cement Squeeze 591.20 591.80 0
2001-06-17 Perforation 685.00 689.50 20
2001-06-17 Packing Device Capped w/Cement 662.00 670.00 0
2001-06-17 Perforation 624.20 625.70 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 744 0.0 0.0 0.0
1974 8749 0.0 0.0 0.0
1975 8740 0.0 0.0 0.0
1976 8610 0.0 0.0 0.0
1977 7093 0.0 0.0 0.0
1981 168 0.0 0.0 0.0
1982 241 0.0 0.0 0.0
1984 112 0.0 0.0 0.0
1994 1298 0.0 0.0 0.0

For data sources see[5]

References