If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504091201000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.295769,"lon":-111.176213,"icon":""}]} |
Location: 00/01-12-050-09W4/0 | |
Location Alias: 00/01-12-50-09 W4M | |
Location Alias 2: 00/01-12-050-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 09 | |
Section: 12 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: PEOC MANN 1-12-50-9 | |
Operator Name: Sequoia Resources Corp. | |
License Number: 0091018 | |
License Date: 1981-07-02 | |
License Status: RecCertified | |
Spud Date: 1981-07-09 | |
Final Drill Date: 1981-07-12 | |
Well Total Depth: 743.00 m | |
Surface Hole Latitude: 53.295769 | |
Surface Hole Longitude: -111.176213 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-07-02 | Obtained License |
1981-07-12 | Finished Drilling |
1981-07-12 | Well Log Performed |
1981-07-12 | Well Mode changed to Drilled and Cased |
1981-07-13 | Drill Stem Test Performed |
1981-07-14 | Drill Stem Test Performed |
1981-07-14 | Production Casing Operation Performed |
1981-09-21 | Perforation Treatment Performed - Jet Perforation |
1981-10-07 | Well Began Production |
1981-10-07 | Well Fluid changed to Crude Oil |
1981-10-07 | Well Mode changed to Pumping |
1982-10-31 | Well Fluid changed to Crude Oil |
1982-10-31 | Well Mode changed to Suspended |
1985-08-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1985-08-23 | Plug Back Performed |
1985-08-23 | Well Fluid changed to Crude Oil |
1985-08-23 | Well Mode changed to Abandoned Zone |
1985-08-24 | Perforation Treatment Performed - Jet Perforation |
1985-08-24 | Well Log Performed |
1985-09-12 | Perforation Treatment Performed - Jet Perforation |
1985-09-12 | Well Log Performed |
1999-10-12 | Well Log Performed |
1999-10-13 | Perforation Treatment Performed - Jet Perforation |
1999-10-13 | Well Log Performed |
1999-10-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-14 | Plug Back Performed |
1999-10-14 | Well Log Performed |
1999-10-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-10-15 | Perforation Treatment Performed - Jet Perforation |
1999-10-15 | Plug Back Performed |
1999-10-15 | Well Log Performed |
1999-10-16 | Perforation Treatment Performed - Cement Squeeze |
1999-10-21 | Well Abandoned |
2001-12-09 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2001-12-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-12-09 | Perforation Treatment Performed - Remedial Casing |
2001-12-13 | Perforation Treatment Performed - Cement Plug |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-09-21 | Perforation | 720.20 | 720.70 | 13 |
1999-10-14 | Packing Device Capped w/Cement | 571.00 | 579.00 | 0 |
1999-10-15 | Perforation | 537.00 | 546.00 | 17 |
1999-10-15 | Packing Device Capped w/Cement | 527.00 | 535.00 | 0 |
1999-10-15 | Perforation | 285.50 | 286.50 | 17 |
1999-10-16 | Cement Squeeze | 0.10 | 286.50 | 0 |
2001-12-09 | Hydra Jet Perforation | 390.00 | 390.50 | 1 |
2001-12-09 | Remedial Casing Cementing | 390.00 | 390.50 | 0 |
2001-12-09 | Packing Device Capped w/Cement | 377.20 | 386.20 | 0 |
2001-12-13 | Cement Plug | 377.20 | 386.20 | 0 |
1981-09-21 | Perforation | 721.50 | 722.00 | 13 |
1981-09-21 | Perforation | 716.00 | 717.00 | 13 |
1981-09-21 | Perforation | 718.00 | 719.00 | 13 |
1985-08-23 | Packing Device Capped w/Cement | 702.00 | 710.00 | 0 |
1985-08-24 | Perforation | 584.50 | 585.00 | 13 |
1985-08-24 | Perforation | 581.00 | 582.00 | 13 |
1985-09-12 | Perforation | 585.00 | 586.00 | 13 |
1999-10-13 | Perforation | 581.00 | 597.00 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 744 | 0.0 | 0.0 | 0.0 |
1982 | 5596 | 0.0 | 0.0 | 0.0 |
For data sources see[5]