X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504091303002

Well Details

Well ID: 0504091303002
Loading map...
Location: 00/03-13-050-09W4/2
Location Alias: 00/03-13-50-09 W4M
Location Alias 2: 00/03-13-050-09 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 09
Section: 13
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 3-13-50-9
Operator Name: Perpetual Operating Corp.
License Number: 0189175
License Date: 1996-07-02
License Status: Issued
Spud Date: 1996-08-01
Final Drill Date: 1996-08-04
Well Total Depth: 700.00 m
Surface Hole Latitude: 53.309671
Surface Hole Longitude: -111.188409

For data sources see[1][2]

Well History

Date Event
1996-07-02 Obtained License
1996-08-01 Surface Casing Operation Performed
1996-08-04 Finished Drilling
1996-08-04 Well Log Performed
1996-08-04 Well Mode changed to Drilled and Cased
1996-08-05 Production Casing Operation Performed
1996-08-05 Rig Released
1996-08-13 Perforation Treatment Performed - Jet Perforation
1996-08-13 Well Log Performed
1996-08-14 Perforation Treatment Performed - Jet Perforation
1996-10-11 Well Began Production
1996-10-11 Well Fluid changed to Gas
1996-10-11 Well Mode changed to Flowing
1997-08-21 Well Log Performed
1997-08-22 Perforation Treatment Performed - Jet Perforation
1997-08-24 Well Fluid changed to Gas
1997-08-24 Well Mode changed to Flowing
1998-10-29 Well Log Performed
1998-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-30 Perforation Treatment Performed - Jet Perforation
1998-10-30 Plug Back Performed
1998-10-30 Well Fluid changed to Gas
1998-10-30 Well Mode changed to Flowing
2001-10-25 Well Fluid changed to Gas
2001-10-25 Well Mode changed to Suspended
2003-06-04 Well Fluid changed to Gas
2003-06-04 Well Mode changed to Flowing
2005-01-01 Well Fluid changed to Gas
2005-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-08-13 Perforation 640.00 641.00 14
1996-08-14 Perforation 554.00 556.00 14
1997-08-22 Perforation 628.00 629.00 20
1998-10-30 Packing Device Capped w/Cement 617.00 625.00 0
1998-10-30 Perforation 600.50 602.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 1928 0.0 0.0 0.0
1997 8602 0.0 0.0 0.0
1998 8696 0.0 0.0 0.0
1999 8752 0.0 0.0 0.0
2000 5492 0.0 0.0 0.0
2003 5061 0.0 0.0 0.0
2004 8586 0.0 0.0 0.0
2005 8657 0.0 0.0 0.0
2006 8731 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 2962 0.0 0.0 0.0
2010 4503 0.0 0.0 0.0
2011 7583 0.0 0.0 0.0
2012 4302 0.0 0.0 0.0
2013 3652 0.0 0.0 0.0
2014 5746 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 7575 0.0 0.0 0.0
2017 8310 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 4195 0.0 0.0 0.0

For data sources see[5]

References