X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504092111003

Well Details

Well ID: 0504092111003
Loading map...
Location: 00/11-21-050-09W4/3
Location Alias: 00/11-21-50-09 W4M
Location Alias 2: 00/11-21-050-09 W4/03
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 09
Section: 21
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 11-21-50-9
Operator Name: Perpetual Operating Corp.
License Number: 0268822
License Date: 2002-03-21
License Status: Suspension
Spud Date: 2002-03-22
Final Drill Date: 2002-03-25
Well Total Depth: 823.00 m
Surface Hole Latitude: 53.327485
Surface Hole Longitude: -111.262155

For data sources see[1][2]

Well History

Date Event
2002-03-21 Obtained License
2002-03-23 Direction Drilling Operation Performed - Deviate
2002-03-23 Surface Casing Operation Performed
2002-03-25 Finished Drilling
2002-03-25 Well Mode changed to Drilled and Cased
2002-03-26 Production Casing Operation Performed
2002-03-26 Rig Released
2002-03-26 Well Log Performed
2002-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-04-01 Perforation Treatment Performed - Jet Perforation
2002-04-01 Plug Back Performed
2002-04-02 Perforation Treatment Performed - Jet Perforation
2002-04-02 Well Log Performed
2002-04-15 Well Began Production
2002-04-15 Well Fluid changed to Gas
2002-04-15 Well Mode changed to Flowing
2003-12-03 Well Fluid changed to Gas
2003-12-03 Well Mode changed to Suspended
2004-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-10-29 Perforation Treatment Performed - Jet Perforation
2004-10-29 Plug Back Performed
2004-10-29 Well Log Performed
2007-02-02 Well Log Performed
2007-02-09 Well Log Performed
2007-02-10 Well Log Performed
2007-03-05 Perforation Treatment Performed - Abrasa-Jet Perforation
2007-03-06 Perforation Treatment Performed - Cement Plug
2007-03-06 Perforation Treatment Performed - Remedial Casing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-03-23 36.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-04-01 Perforation 783.50 784.50 17
2004-10-29 Perforation 637.50 638.50 17
2007-03-05 Hydra Jet Perforation 372.00 378.00 1
2007-03-06 Remedial Casing Cementing 372.00 378.00 0
2007-03-06 Cement Plug 356.00 393.00 0
2002-04-01 Packing Device Capped w/Cement 772.00 780.00 0
2002-04-01 Perforation 742.50 743.50 17
2002-04-01 Perforation 736.00 737.00 17
2002-04-02 Perforation 720.00 723.50 17
2004-10-29 Packing Device Capped w/Cement 723.50 731.50 0
2004-10-29 Packing Device Capped w/Cement 703.00 711.00 0
2004-10-29 Perforation 645.00 646.00 17
2004-10-29 Perforation 641.00 642.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 3397 0.0 0.0 0.0

For data sources see[6]

References