X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504092302000

Well Details

Well ID: 0504092302000
Loading map...
Location: 00/02-23-050-09W4/0
Location Alias: 00/02-23-50-09 W4M
Location Alias 2: 00/02-23-050-09 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 09
Section: 23
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 2-23-50-9
Operator Name: Perpetual Operating Corp.
License Number: 0217585
License Date: 1998-09-16
License Status: RecCertified
Spud Date: 1998-10-03
Final Drill Date: 1998-10-05
Well Total Depth: 626.00 m
Surface Hole Latitude: 53.324431
Surface Hole Longitude: -111.206193

For data sources see[1][2]

Well History

Date Event
1998-09-16 Obtained License
1998-10-03 Surface Casing Operation Performed
1998-10-05 Finished Drilling
1998-10-05 Production Casing Operation Performed
1998-10-05 Well Log Performed
1998-10-05 Well Mode changed to Drilled and Cased
1998-10-06 Rig Released
1998-10-22 Perforation Treatment Performed - Jet Perforation
1998-10-22 Well Log Performed
1998-10-23 Perforation Treatment Performed - Jet Perforation
1998-10-24 Well Log Performed
1998-10-25 Perforation Treatment Performed - Jet Perforation
1998-12-09 Well Began Production
1998-12-09 Well Fluid changed to Gas
1998-12-09 Well Mode changed to Flowing
1999-03-06 Perforation Treatment Performed - Jet Perforation
1999-03-06 Well Fluid changed to Gas
1999-03-06 Well Log Performed
1999-03-06 Well Mode changed to Abandoned Zone
2013-10-10 Perforation Treatment Performed - Cement Squeeze
2013-10-10 Plug Back Performed
2013-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-20 Plug Back Performed
2014-08-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-10-22 Perforation 596.00 597.00 20
2013-10-20 Packing Device Capped w/Cement 601.00 609.00 0
1998-10-22 Perforation 612.00 614.00 20
1998-10-23 Perforation 554.00 555.50 20
1998-10-23 Perforation 557.50 558.80 20
1998-10-25 Perforation 554.00 555.50 20
1999-03-06 Perforation 562.00 564.00 20
2013-10-10 Cement Squeeze 554.00 558.80 0
2013-10-10 Cement Squeeze 562.00 564.00 0
2013-10-10 Cement Squeeze 596.00 597.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 710 0.0 0.0 0.0
1999 1395 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-20 No Incident Encountered 0.00 0.00
2013-10-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References