If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504110907006 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.297196,"lon":-111.552064,"icon":""}]} |
Location: 00/07-09-050-11W4/6 | |
Location Alias: 00/07-09-50-11 W4M | |
Location Alias 2: 00/07-09-050-11 W4/06 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 11 | |
Section: 09 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: TASMAN BIRCH 7-9-50-11 | |
Operator Name: ORLEN Upstream Canada Ltd. | |
License Number: 0333323 | |
License Date: 2005-06-21 | |
License Status: Issued | |
Spud Date: 2005-07-15 | |
Final Drill Date: 2005-08-07 | |
Well Total Depth: 710.90 m | |
Surface Hole Latitude: 53.297196 | |
Surface Hole Longitude: -111.552064 |
Date | Event |
---|---|
2005-06-21 | Obtained License |
2005-07-09 | Surface Casing Operation Performed |
2005-07-16 | Production Casing Operation Performed |
2005-07-16 | Rig Released |
2005-07-16 | Well Log Performed |
2005-08-07 | Finished Drilling |
2005-08-07 | Perforation Treatment Performed - Open-Hole Completion |
2005-08-07 | Well Mode changed to Drilled and Cased |
2005-08-10 | Perforation Treatment Performed - Jet Perforation |
2005-08-11 | Perforation Treatment Performed - Jet Perforation |
2005-10-26 | Perforation Treatment Performed - Cement Squeeze |
2005-10-26 | Plug Back Performed |
2005-10-29 | Perforation Treatment Performed - Jet Perforation |
2009-03-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-16 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2009-03-16 | Plug Back Performed |
2009-03-17 | Perforation Treatment Performed - Jet Perforation |
2009-03-17 | Well Log Performed |
2009-03-17 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-07 | Open Hole/Barefoot Completion | 705.00 | 710.90 | 0 |
2009-03-17 | Perforation | 660.00 | 661.00 | 17 |
2009-03-17 | Perforation | 648.00 | 650.00 | 17 |
2005-08-10 | Perforation | 695.50 | 696.50 | 13 |
2005-08-11 | Perforation | 673.00 | 675.00 | 13 |
2005-10-26 | Cement Squeeze | 673.00 | 675.00 | 0 |
2005-10-29 | Perforation | 614.00 | 615.00 | 13 |
2005-10-29 | Perforation | 608.00 | 611.00 | 13 |
2009-03-16 | Packing Device Capped w/Cement | 694.00 | 702.00 | 0 |
2009-03-16 | Packing Dev Cpd w/Res-Gyp Cem | 689.00 | 691.00 | 0 |
2009-03-17 | Perforation | 665.50 | 667.00 | 17 |
For data sources see[4]