X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504111211004

Well Details

Well ID: 0504111211004
Loading map...
Location: 00/11-12-050-11W4/4
Location Alias: 00/11-12-50-11 W4M
Location Alias 2: 00/11-12-050-11 W4/04
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 11
Section: 12
County/Municipality: County of Minburn No. 27
Well Name: SEQUOIA BIRCH 11-12-50-11
Operator Name: Sequoia Resources Corp.
License Number: 0070554
License Date: 1978-07-06
License Status: Suspension
Spud Date: 1978-07-06
Final Drill Date: 1978-07-11
Well Total Depth: 749.80 m
Surface Hole Latitude: 53.301485
Surface Hole Longitude: -111.484606

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-07-06 Obtained License
1978-07-10 Drill Stem Test Performed
1978-07-11 Finished Drilling
1978-07-12 Drill Stem Test Performed
1978-07-13 Production Casing Operation Performed
1978-10-21 Perforation Treatment Performed - Jet Perforation
1978-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-21 Perforation Treatment Performed - Cement Squeeze
1981-07-24 Perforation Treatment Performed - Jet Perforation
1981-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-13 Well Log Performed
1988-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-02-14 Perforation Treatment Performed - Jet Perforation
1988-02-14 Plug Back Performed
1989-09-24 Well Log Performed
1989-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-09-25 Plug Back Performed
1989-09-26 Perforation Treatment Performed - Jet Perforation
1989-09-26 Well Log Performed
1989-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-30 Perforation Treatment Performed - Remedial Casing
1989-10-02 Perforation Treatment Performed - Jet Perforation
1989-10-02 Well Log Performed
1994-09-06 Well Log Performed
1994-09-10 Perforation Treatment Performed - Jet Perforation
1994-09-10 Well Mode changed to Drilled and Cased
1994-11-01 Well Began Production
1994-11-01 Well Fluid changed to Gas
1994-11-01 Well Mode changed to Flowing
1995-01-23 Perforation Treatment Performed - Jet Perforation
1995-01-23 Well Log Performed
1996-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-11 Plug Back Performed
1996-01-11 Well Log Performed
1996-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-12 Perforation Treatment Performed - Jet Perforation
1996-01-12 Plug Back Performed
1996-01-12 Well Fluid changed to Gas
1996-01-12 Well Mode changed to Abandoned Zone
2002-01-28 Perforation Treatment Performed - Jet Perforation
2002-08-24 Well Log Performed
2002-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-08-25 Perforation Treatment Performed - Jet Perforation
2002-08-25 Plug Back Performed
2002-08-25 Well Log Performed
2002-08-26 Perforation Treatment Performed - Remedial Casing
2004-01-21 Well Log Performed
2004-01-22 Well Log Performed
2004-01-23 Perforation Treatment Performed - Jet Perforation
2004-01-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-27 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-10-21 Perforation 712.00 713.20 7
1989-09-29 Acid Treatment 253.00 254.00 0
1989-09-30 Remedial Casing Cementing 253.00 254.00 0
1989-10-02 Perforation 683.00 684.50 11
1994-09-10 Perforation 640.40 642.20 13
1994-09-10 Perforation 662.60 664.50 13
1995-01-23 Perforation 662.00 665.00 13
1996-01-11 Packing Device Capped w/Cement 668.00 676.00 0
1996-01-12 Packing Device Capped w/Cement 645.70 653.70 0
1996-01-12 Packing Device Capped w/Cement 622.00 630.00 0
1996-01-12 Perforation 602.30 603.50 13
1978-10-22 Acid Treatment 712.00 713.20 0
2002-01-28 Perforation 640.30 642.20 13
2002-08-25 Packing Device Capped w/Cement 627.00 635.00 0
2002-08-25 Packing Device Capped w/Cement 587.00 595.00 0
2002-08-25 Perforation 540.00 541.00 13
2002-08-25 Perforation 301.00 302.00 13
2002-08-26 Remedial Casing Cementing 540.00 541.00 0
2002-08-26 Remedial Casing Cementing 301.00 302.00 0
2004-01-23 Perforation 491.00 493.00 13
2004-01-25 Acid Treatment 491.00 493.00 0
2004-01-27 Remedial Casing Cementing 491.00 493.00 0
1981-07-21 Cement Squeeze 712.00 713.20 0
1981-07-24 Perforation 705.90 706.80 7
1981-08-07 Acid Treatment 705.90 706.80 0
1988-02-14 Packing Device Capped w/Cement 701.00 704.00 0
1988-02-14 Perforation 696.80 698.00 9
1989-09-25 Packing Device Capped w/Cement 687.00 695.00 0
1989-09-26 Perforation 253.00 254.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1441 0.0 0.0 0.0
1995 3779 0.0 0.0 0.0

For data sources see[5]

References