If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504200614002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.291172,"lon":-112.91993,"icon":""}]} |
Location: 00/14-06-050-20W4/2 | |
Location Alias: 00/14-06-50-20 W4M | |
Location Alias 2: 00/14-06-050-20 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 20 | |
Section: 06 | |
County/Municipality: Camrose County | |
Well Name: BERNUM HASTINGS 14-6-50-20 | |
Operator Name: Caltex Resources Ltd. | |
License Number: 0262700 | |
License Date: 2001-11-28 | |
License Status: Suspension | |
Spud Date: 2001-12-08 | |
Final Drill Date: 2001-12-12 | |
Well Total Depth: 1179.00 m | |
Surface Hole Latitude: 53.291172 | |
Surface Hole Longitude: -112.919930 |
Date | Event |
---|---|
2001-11-28 | Obtained License |
2001-12-01 | Surface Casing Operation Performed |
2001-12-12 | Finished Drilling |
2001-12-12 | Well Mode changed to Drilled and Cased |
2001-12-13 | Drill Stem Test Performed |
2001-12-13 | Well Log Performed |
2001-12-14 | Production Casing Operation Performed |
2001-12-14 | Rig Released |
2001-12-20 | Perforation Treatment Performed - Jet Perforation |
2001-12-20 | Well Log Performed |
2002-01-10 | Perforation Treatment Performed - Fractured |
2002-01-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-01-12 | Plug Back Performed |
2002-01-14 | Perforation Treatment Performed - Jet Perforation |
2002-05-10 | Well Began Production |
2002-05-10 | Well Fluid changed to Gas |
2002-05-10 | Well Mode changed to Flowing |
2008-02-03 | Perforation Treatment Performed - Fractured |
2009-03-01 | Well Fluid changed to Gas |
2009-03-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-12-20 | Perforation | 1085.50 | 1088.50 | 17 |
2001-12-20 | Perforation | 1080.50 | 1083.00 | 17 |
2002-01-10 | Fracture | 1080.50 | 1088.50 | 0 |
2002-01-12 | Packing Device Capped w/Cement | 1065.00 | 1075.00 | 0 |
2002-01-14 | Perforation | 956.00 | 957.00 | 17 |
2008-02-03 | Fracture | 956.00 | 957.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 3008 | 0.0 | 0.0 | 0.0 |
2003 | 3758 | 0.0 | 0.0 | 0.0 |
2004 | 8783 | 0.0 | 0.0 | 0.0 |
2005 | 744 | 0.0 | 0.0 | 0.0 |
2007 | 2516 | 0.0 | 0.0 | 0.0 |
2008 | 748 | 0.0 | 0.0 | 0.0 |
For data sources see[5]