X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504210613000

Well Details

Well ID: 0504210613000
Loading map...
Location: 00/13-06-050-21W4/0
Location Alias: 00/13-06-50-21 W4M
Location Alias 2: 00/13-06-050-21 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 21
Section: 06
County/Municipality: Leduc County
Well Name: CABRE JOARCAM 13-6-50-21
Operator Name: Enerplus Corporation
License Number: 0208073
License Date: 1997-11-07
License Status: Suspension
Spud Date: 1998-03-27
Final Drill Date: 1998-04-03
Well Total Depth: 1675.00 m
Surface Hole Latitude: 53.302724
Surface Hole Longitude: -113.065593

For data sources see[1][2]

Well History

Date Event
1997-11-07 Obtained License
1998-03-28 Surface Casing Operation Performed
1998-03-29 Direction Drilling Operation Performed - Deviate
1998-04-03 Finished Drilling
1998-04-03 Well Log Performed
1998-04-03 Well Mode changed to Drilled and Cased
1998-04-05 Well Log Performed
1998-04-06 Production Casing Operation Performed
1998-04-06 Rig Released
1998-04-13 Well Log Performed
1998-04-14 Well Log Performed
1998-04-15 Perforation Treatment Performed - Jet Perforation
1998-04-15 Well Log Performed
1998-04-18 Perforation Treatment Performed - Cement Squeeze
1998-04-18 Perforation Treatment Performed - Jet Perforation
1998-04-18 Well Log Performed
1998-04-23 Perforation Treatment Performed - Jet Perforation
1998-04-23 Well Log Performed
1998-04-29 Well Began Production
1998-04-29 Well Fluid changed to Crude Oil
1998-04-29 Well Mode changed to Pumping
1998-10-06 Perforation Treatment Performed - Jet Perforation
1998-10-06 Well Log Performed
2000-05-24 Well Log Performed
2000-05-26 Well Log Performed
2000-08-01 Well Fluid changed to Crude Oil
2000-08-01 Well Mode changed to Suspended
2004-01-20 Perforation Treatment Performed - Jet Perforation
2009-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-27 Plug Back Performed
2009-08-27 Well Fluid changed to Crude Oil
2009-08-27 Well Mode changed to Abandoned Zone
2009-09-11 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-03-29 135.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-04-15 Perforation 1629.50 1632.00 13
1998-04-18 Perforation 1627.70 1628.00 13
1998-04-18 Cement Squeeze 1627.70 1632.00 0
1998-04-23 Perforation 1630.50 1632.50 13
1998-10-06 Perforation 1628.70 1630.50 13
2004-01-20 Perforation 1629.50 1634.00 17
2009-08-27 Packing Device Capped w/Cement 1600.00 1620.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2091 0.0 0.0 0.0

For data sources see[6]

References