X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504260305000

Well Details

Well ID: 0504260305000
Loading map...
Location: 00/05-03-050-26W4/0
Location Alias: 00/05-03-50-26 W4M
Location Alias 2: 00/05-03-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 03
County/Municipality: Leduc County
Well Name: CIGOL ET AL LEDUC 5-3-50-26
Operator Name: Canadian Natural Resources Limited
License Number: 0003406
License Date: 1951-08-29
License Status: RecCertified
Spud Date: 1951-09-05
Final Drill Date: 1951-10-12
Well Total Depth: 1663.60 m
Surface Hole Latitude: 53.285562
Surface Hole Longitude: -113.728393

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-08-29 Obtained License
1951-10-03 Drill Stem Test Performed
1951-10-04 Drill Stem Test Performed
1951-10-06 Drill Stem Test Performed
1951-10-07 Drill Stem Test Performed
1951-10-08 Drill Stem Test Performed
1951-10-12 Finished Drilling
1951-10-12 Well Mode changed to Drilled and Cased
1951-10-14 Production Casing Operation Performed
1951-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-10-16 Perforation Treatment Performed - Bullet Perforation
1951-10-21 Perforation Treatment Performed - Cement Squeeze
1951-11-07 Perforation Treatment Performed - Bullet Perforation
1951-11-08 Perforation Treatment Performed - Acid Wash - No Pressure
1951-11-12 Perforation Treatment Performed - Cement Squeeze
1951-11-20 Perforation Treatment Performed - Bullet Perforation
1951-11-21 Perforation Treatment Performed - Bullet Perforation
1951-11-25 Perforation Treatment Performed - Cement Squeeze
1951-12-01 Perforation Treatment Performed - Bullet Perforation
1951-12-09 Perforation Treatment Performed - Bullet Perforation
1951-12-09 Perforation Treatment Performed - Cement Squeeze
1951-12-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1951-12-24 Perforation Treatment Performed - Bullet Perforation
1951-12-24 Perforation Treatment Performed - Jet Perforation
1951-12-27 Perforation Treatment Performed - Acid Wash - No Pressure
1951-12-30 Perforation Treatment Performed - Acid Wash - No Pressure
1952-01-23 Well Began Production
1952-01-23 Well Fluid changed to Crude Oil
1952-01-23 Well Mode changed to Pumping
1952-12-01 Perforation Treatment Performed - Acid Wash - No Pressure
1973-06-27 Perforation Treatment Performed - Cement Plug
1973-06-27 Well Abandoned
1973-06-27 Well Fluid changed to Crude Oil
1973-06-27 Well Mode changed to Abandoned
1973-07-05 Perforation Treatment Performed - Cement Plug
1973-07-06 Perforation Treatment Performed - Cement Plug
1973-07-10 Perforation Treatment Performed - Cement Plug
1973-07-11 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-10-16 Bullet Perforation 1592.30 1593.20 13
1951-11-20 Bullet Perforation 1592.30 1593.20 13
1951-11-20 Bullet Perforation 1587.70 1589.50 13
1951-11-21 Bullet Perforation 1590.40 1591.40 13
1951-11-21 Bullet Perforation 1585.90 1587.70 13
1951-11-25 Cement Squeeze 1585.90 1593.20 0
1951-12-01 Bullet Perforation 1587.70 1590.40 13
1951-12-09 Bullet Perforation 1572.20 1572.80 13
1951-12-09 Cement Squeeze 1572.20 1590.40 0
1951-12-23 Packing Device Capped w/Cement 1585.00 1585.00 0
1951-12-24 Bullet Perforation 1581.90 1583.70 13
1951-10-16 Bullet Perforation 1595.90 1597.80 13
1951-12-24 Perforation 1581.90 1583.70 13
1951-12-27 Acid Wash 1581.90 1583.70 0
1951-12-30 Acid Wash 1581.90 1583.70 0
1952-12-01 Acid Wash 1581.90 1583.70 0
1973-06-27 Cement Plug 1541.70 1584.70 0
1973-07-05 Cement Plug 1255.20 1288.70 0
1973-07-05 Cement Plug 1065.90 1107.00 0
1973-07-06 Cement Plug 887.90 915.30 0
1973-07-10 Cement Plug 338.60 375.20 0
1973-07-11 Cement Plug 160.90 199.60 0
1951-10-16 Acid Treatment 1595.90 1597.80 0
1951-10-16 Acid Treatment 1592.30 1593.20 0
1951-10-21 Cement Squeeze 1592.30 1597.80 0
1951-11-07 Bullet Perforation 1592.30 1593.20 13
1951-11-07 Bullet Perforation 1587.40 1589.50 13
1951-11-08 Acid Wash 1587.40 1593.20 0
1951-11-12 Cement Squeeze 1587.40 1593.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1968 3287 0.0 0.0 0.0
1969 3720 0.0 0.0 0.0
1970 1992 0.0 0.0 0.0
1971 8159 0.0 0.0 0.0
1972 144 0.0 0.0 0.0

For data sources see[5]

References