If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504260415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.292298,"lon":-113.741565,"icon":""}]} |
| Location: 00/15-04-050-26W4/0 | |
| Location Alias: 00/15-04-50-26 W4M | |
| Location Alias 2: 00/15-04-050-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 04 | |
| County/Municipality: Leduc County | |
| Well Name: IMPERIAL LEDUC NO 94 | |
| Operator Name: Imperial Oil Resources Limited | |
| License Number: B0002225 | |
| License Date: 1948-07-29 | |
| License Status: RecCertified | |
| Spud Date: 1948-08-06 | |
| Final Drill Date: 1948-09-02 | |
| Well Total Depth: 1651.10 m | |
| Surface Hole Latitude: 53.292298 | |
| Surface Hole Longitude: -113.741565 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1948-07-29 | Obtained License |
| 1948-08-26 | Drill Stem Test Performed |
| 1948-08-28 | Drill Stem Test Performed |
| 1948-09-02 | Finished Drilling |
| 1948-09-02 | Well Mode changed to Drilled and Cased |
| 1948-09-03 | Production Casing Operation Performed |
| 1948-09-10 | Perforation Treatment Performed - Bullet Perforation |
| 1948-09-11 | Well Began Production |
| 1948-09-11 | Well Fluid changed to Crude Oil |
| 1948-09-11 | Well Mode changed to Flowing |
| 1956-09-08 | Perforation Treatment Performed - Cement Squeeze |
| 1956-09-09 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1956-09-09 | Perforation Treatment Performed - Jet Perforation |
| 1959-12-03 | Well Fluid changed to Crude Oil |
| 1959-12-03 | Well Mode changed to Pumping |
| 1975-06-19 | Well Fluid changed to Crude Oil |
| 1975-06-19 | Well Mode changed to Flowing |
| 1977-01-11 | Well Fluid changed to Crude Oil |
| 1977-01-11 | Well Mode changed to Pumping |
| 1982-07-14 | Perforation Treatment Performed - Cement Squeeze |
| 1982-07-19 | Perforation Treatment Performed - Jet Perforation |
| 1982-07-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1982-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1983-04-08 | Well Fluid changed to Crude Oil |
| 1983-04-08 | Well Mode changed to Suspended |
| 1984-07-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-07-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1984-07-23 | Perforation Treatment Performed - Jet Perforation |
| 1984-07-23 | Plug Back Performed |
| 1984-07-24 | Perforation Treatment Performed - Cement Squeeze |
| 1984-07-24 | Perforation Treatment Performed - Jet Perforation |
| 1984-07-24 | Plug Back Performed |
| 1984-07-25 | Well Abandoned |
| 1984-07-25 | Well Fluid changed to Crude Oil |
| 1984-07-25 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1948-09-10 | Bullet Perforation | 1649.30 | 1650.50 | 23 |
| 1984-07-23 | Acid Treatment | 583.70 | 583.90 | 0 |
| 1984-07-23 | Packing Device Capped w/Cement | 555.00 | 578.00 | 0 |
| 1984-07-24 | Perforation | 200.00 | 200.30 | 13 |
| 1984-07-24 | Cement Squeeze | 200.00 | 200.30 | 0 |
| 1956-09-08 | Cement Squeeze | 1649.30 | 1650.50 | 0 |
| 1956-09-09 | Perforation | 1646.50 | 1647.70 | 13 |
| 1956-09-09 | Acid Wash | 1646.50 | 1647.70 | 13 |
| 1982-07-14 | Cement Squeeze | 1646.50 | 1647.70 | 0 |
| 1982-07-19 | Perforation | 1645.80 | 1646.00 | 10 |
| 1982-07-20 | Acid Treatment | 1645.80 | 1646.00 | 0 |
| 1982-07-21 | Acid Treatment | 1645.80 | 1646.00 | 0 |
| 1984-07-23 | Perforation | 583.70 | 583.90 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 138 | 0.0 | 0.0 | 0.0 |
| 1969 | 456 | 0.0 | 0.0 | 0.0 |
| 1970 | 892 | 0.0 | 0.0 | 0.0 |
| 1971 | 4416 | 0.0 | 0.0 | 0.0 |
| 1972 | 8155 | 0.0 | 0.0 | 0.0 |
| 1973 | 8498 | 0.0 | 0.0 | 0.0 |
| 1974 | 8309 | 0.0 | 0.0 | 0.0 |
| 1975 | 8570 | 0.0 | 0.0 | 0.0 |
| 1976 | 7941 | 0.0 | 0.0 | 0.0 |
| 1977 | 7685 | 0.0 | 0.0 | 0.0 |
| 1978 | 8411 | 0.0 | 0.0 | 0.0 |
| 1979 | 8315 | 0.0 | 0.0 | 0.0 |
| 1980 | 7581 | 0.0 | 0.0 | 0.0 |
| 1981 | 8320 | 0.0 | 0.0 | 0.0 |
| 1982 | 4399 | 0.0 | 0.0 | 0.0 |
For data sources see[5]