If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504260808000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.299531,"lon":-113.75992,"icon":""}]} |
| Location: 00/08-08-050-26W4/0 | |
| Location Alias: 00/08-08-50-26 W4M | |
| Location Alias 2: 00/08-08-050-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 08 | |
| County/Municipality: Leduc County | |
| Well Name: MEC LEDUC-WB 8-8-50-26 | |
| Operator Name: NEP Canada ULC | |
| License Number: B0002643 | |
| License Date: 1949-02-19 | |
| License Status: Abandoned | |
| Spud Date: 1949-03-02 | |
| Final Drill Date: 1949-04-08 | |
| Well Total Depth: 1643.20 m | |
| Surface Hole Latitude: 53.299531 | |
| Surface Hole Longitude: -113.759920 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1949-02-19 | Obtained License |
| 1949-03-31 | Drill Stem Test Performed |
| 1949-04-02 | Drill Stem Test Performed |
| 1949-04-05 | Liner Casing Operation Performed |
| 1949-04-08 | Finished Drilling |
| 1949-04-08 | Well Mode changed to Drilled and Cased |
| 1949-04-13 | Perforation Treatment Performed - Bullet Perforation |
| 1949-04-14 | Well Began Production |
| 1949-04-14 | Well Fluid changed to Crude Oil |
| 1949-04-14 | Well Mode changed to Flowing |
| 1960-08-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1960-08-30 | Perforation Treatment Performed - Jet Perforation |
| 1960-09-01 | Well Fluid changed to Crude Oil |
| 1960-09-01 | Well Mode changed to Flowing |
| 1974-02-05 | Well Fluid changed to Crude Oil |
| 1974-02-05 | Well Mode changed to Pumping |
| 1988-03-01 | Well Fluid changed to Crude Oil |
| 1988-03-01 | Well Mode changed to Suspended |
| 1994-11-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-11-23 | Plug Back Performed |
| 1994-11-23 | Well Fluid changed to Crude Oil |
| 1994-11-23 | Well Mode changed to Abandoned Zone |
| 1994-11-27 | Well Log Performed |
| 1997-12-09 | Well Log Performed |
| 1997-12-10 | Perforation Treatment Performed - Jet Perforation |
| 1997-12-10 | Well Log Performed |
| 2001-11-28 | Perforation Treatment Performed - Cement Squeeze |
| 2001-11-28 | Perforation Treatment Performed - Jet Perforation |
| 2001-11-28 | Plug Back Performed |
| 2001-12-05 | Perforation Treatment Performed - Jet Perforation |
| 2001-12-05 | Well Fluid changed to Crude Oil |
| 2001-12-05 | Well Mode changed to Suspended |
| 2001-12-14 | Well Fluid changed to Crude Oil |
| 2001-12-14 | Well Mode changed to Pumping |
| 2011-09-01 | Well Fluid changed to Crude Oil |
| 2011-09-01 | Well Mode changed to Suspended |
| 2012-02-27 | Well Fluid changed to Crude Oil |
| 2012-02-27 | Well Mode changed to Pumping |
| 2012-04-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2014-04-01 | Well Fluid changed to Crude Oil |
| 2014-04-01 | Well Mode changed to Suspended |
| 2017-10-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-10-25 | Plug Back Performed |
| 2017-10-25 | Well Fluid changed to Crude Oil |
| 2017-10-25 | Well Mode changed to Abandoned Zone |
| 2019-06-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-06-01 | Plug Back Performed |
| 2019-06-01 | Well Log Performed |
| 2019-06-02 | Well Log Performed |
| 2019-06-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-06-04 | Perforation Treatment Performed - Jet Perforation |
| 2019-06-04 | Plug Back Performed |
| 2019-06-04 | Well Log Performed |
| 2019-06-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-06-05 | Perforation Treatment Performed - Jet Perforation |
| 2019-06-05 | Plug Back Performed |
| 2019-06-05 | Well Log Performed |
| 2019-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-06-11 | Perforation Treatment Performed - Cement Squeeze |
| 2019-06-11 | Plug Back Performed |
| 2019-10-23 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1949-04-13 | Bullet Perforation | 1639.50 | 1641.00 | 26 |
| 2001-12-05 | Perforation | 1629.20 | 1630.70 | 14 |
| 2012-04-03 | Acid Treatment | 1629.20 | 1630.70 | 0 |
| 2017-10-25 | Packing Device Capped w/Cement | 1616.00 | 1625.00 | 0 |
| 2019-06-01 | Packing Device Capped w/Cement | 1297.00 | 1305.00 | 0 |
| 2019-06-04 | Packing Device Capped w/Cement | 582.00 | 590.00 | 0 |
| 2019-06-04 | Perforation | 386.00 | 387.00 | 17 |
| 2019-06-04 | Packing Device Capped w/Cement | 374.00 | 382.00 | 0 |
| 2019-06-04 | Perforation | 350.00 | 351.00 | 17 |
| 2019-06-05 | Packing Device Capped w/Cement | 336.00 | 344.00 | 0 |
| 2019-06-05 | Perforation | 180.00 | 181.00 | 17 |
| 1960-08-30 | Perforation | 1328.30 | 1336.20 | 7 |
| 2019-06-11 | Cement Squeeze | 180.00 | 181.00 | 0 |
| 2019-06-11 | Packing Device Capped w/Cement | 167.00 | 175.00 | 0 |
| 1960-08-30 | Perforation | 1313.70 | 1324.70 | 3 |
| 1960-08-30 | Acid Treatment | 1313.70 | 1336.20 | 0 |
| 1994-11-23 | Packing Device Capped w/Cement | 1595.00 | 1603.00 | 0 |
| 1997-12-10 | Perforation | 1311.00 | 1315.00 | 14 |
| 1997-12-10 | Perforation | 1317.00 | 1320.00 | 14 |
| 2001-11-28 | Perforation | 1311.00 | 1339.00 | 14 |
| 2001-11-28 | Cement Squeeze | 1311.00 | 1339.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1967 | 1104 | 0.0 | 0.0 | 0.0 |
| 1969 | 1248 | 0.0 | 0.0 | 0.0 |
| 1970 | 1728 | 0.0 | 0.0 | 0.0 |
| 1971 | 1368 | 0.0 | 0.0 | 0.0 |
| 1972 | 7416 | 0.0 | 0.0 | 0.0 |
| 1973 | 8239 | 0.0 | 0.0 | 0.0 |
| 1974 | 8090 | 0.0 | 0.0 | 0.0 |
| 1975 | 8483 | 0.0 | 0.0 | 0.0 |
| 1976 | 8315 | 0.0 | 0.0 | 0.0 |
| 1977 | 8571 | 0.0 | 0.0 | 0.0 |
| 1978 | 8499 | 0.0 | 0.0 | 0.0 |
| 1979 | 8219 | 0.0 | 0.0 | 0.0 |
| 1980 | 8495 | 0.0 | 0.0 | 0.0 |
| 1981 | 8615 | 0.0 | 0.0 | 0.0 |
| 1982 | 7828 | 0.0 | 0.0 | 0.0 |
| 1983 | 8177 | 0.0 | 0.0 | 0.0 |
| 1984 | 8594 | 0.0 | 0.0 | 0.0 |
| 1985 | 6227 | 0.0 | 0.0 | 0.0 |
| 1986 | 828 | 0.0 | 0.0 | 0.0 |
| 2001 | 384 | 0.0 | 0.0 | 0.0 |
| 2002 | 8219 | 0.0 | 0.0 | 0.0 |
| 2003 | 8592 | 0.0 | 0.0 | 0.0 |
| 2004 | 8462 | 0.0 | 0.0 | 0.0 |
| 2005 | 8366 | 0.0 | 0.0 | 0.0 |
| 2006 | 8150 | 0.0 | 0.0 | 0.0 |
| 2007 | 5838 | 0.0 | 0.0 | 0.0 |
| 2012 | 6802 | 0.0 | 0.0 | 0.0 |
| 2013 | 2076 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-11-08 | No Incident Encountered | 0.00 | 0.00 |
| 2017-10-25 | No Incident Encountered | 0.00 | 0.00 |
| 2019-06-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]