X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504261511022

Well Details

Well ID: 0504261511022
Loading map...
Location: 02/11-15-050-26W4/2
Location Alias: 02/11-15-50-26 W4M
Location Alias 2: 02/11-15-050-26 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 15
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 11-15-50-26
Operator Name: NEP Canada ULC
License Number: 0003106
License Date: 1951-06-27
License Status: Issued
Spud Date: 1951-08-05
Final Drill Date: 1951-08-27
Well Total Depth: 1634.90 m
Surface Hole Latitude: 53.318229
Surface Hole Longitude: -113.723103

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-06-27 Obtained License
1951-08-24 Production Casing Operation Performed
1951-08-27 Finished Drilling
1951-08-27 Perforation Treatment Performed - Open-Hole Completion
1951-08-27 Well Mode changed to Drilled and Cased
1965-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-10-20 Perforation Treatment Performed - Bullet Perforation
1984-05-01 Well Log Performed
1984-05-08 Liner Casing Operation Performed
1984-05-08 Perforation Treatment Performed - Cement Squeeze
1984-05-10 Well Log Performed
1984-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-11 Perforation Treatment Performed - Jet Perforation
1984-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-16 Perforation Treatment Performed - Jet Perforation
1984-05-16 Well Log Performed
1984-05-17 Well Log Performed
1990-02-08 Perforation Treatment Performed - Jet Perforation
1990-02-08 Well Log Performed
1990-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-13 Perforation Treatment Performed - Jet Perforation
1998-07-13 Plug Back Performed
1998-07-15 Perforation Treatment Performed - Fractured
1998-07-17 Well Log Performed
1998-07-20 Well Log Performed
1998-07-21 Well Log Performed
1998-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-08-19 Well Log Performed
1998-11-01 Well Began Injection
1998-11-01 Well Fluid changed to Water
1998-11-01 Well Type changed to Injection
2002-04-16 Perforation Treatment Performed - Cement Squeeze
2002-04-16 Plug Back Performed
2002-04-16 Well Fluid changed to Water
2002-04-16 Well Mode changed to Abandoned Zone
2002-04-16 Well Type changed to Injection
2002-04-30 Perforation Treatment Performed - Jet Perforation
2002-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-05-01 Perforation Treatment Performed - Jet Perforation
2019-03-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-08-27 Open Hole/Barefoot Completion 1610.90 1634.90 0
1990-02-09 Acid Treatment 1625.30 1625.60 0
1998-07-13 Packing Device Capped w/Cement 1610.00 1618.00 0
1998-07-13 Perforation 1185.00 1192.00 13
1998-07-15 Fracture 1185.00 1192.00 0
1998-07-29 Acid Treatment 1185.00 1192.00 0
2002-04-16 Cement Squeeze 1185.00 1192.00 0
2002-04-30 Perforation 1622.60 1624.60 17
2002-05-01 Acid Treatment 1622.60 1624.60 0
2002-05-01 Perforation 1625.30 1625.60 17
2002-05-01 Acid Treatment 1625.30 1626.30 0
1965-10-20 Bullet Perforation 1632.20 1634.90 0
1965-10-20 Acid Treatment 1632.20 1634.90 0
1984-05-08 Cement Squeeze 1610.90 1634.90 0
1984-05-11 Perforation 1630.70 1630.90 6
1984-05-11 Acid Treatment 1630.70 1630.90 0
1984-05-16 Perforation 1629.80 1629.90 0
1984-05-16 Acid Treatment 1629.80 1629.90 0
1990-02-08 Perforation 1625.30 1625.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0

For data sources see[5]

References