X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504261613032

Well Details

Well ID: 0504261613032
Loading map...
Location: 03/13-16-050-26W4/2
Location Alias: 03/13-16-50-26 W4M
Location Alias 2: 03/13-16-050-26 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 16
County/Municipality: Leduc County
Well Name: MEC HZ LEDUC-WB 12-16-50-26
Operator Name: NEP Canada ULC
License Number: B0002471
License Date: 1948-11-13
License Status: Abandoned
Spud Date: 1948-12-07
Final Drill Date: 1998-11-05
Well Total Depth: 1847.00 m
Surface Hole Latitude: 53.317836
Surface Hole Longitude: -113.753657

For data sources see[1][2]

Well History

Date Event
1948-11-13 Obtained License
1998-10-24 Well Log Performed
1998-10-29 Direction Drilling Operation Performed - Horizontal
1998-11-02 Well Log Performed
1998-11-05 Finished Drilling
1998-11-05 Well Log Performed
1998-11-05 Well Mode changed to Drilled and Cased
1998-11-06 Liner Casing Operation Performed
1998-11-06 Perforation Treatment Performed - Open-Hole Completion
1998-11-07 Rig Released
1998-11-20 Well Began Production
1998-11-20 Well Fluid changed to Crude Oil
1998-11-20 Well Mode changed to Pumping
2002-08-31 Well Fluid changed to Crude Oil
2002-08-31 Well Mode changed to Suspended
2019-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-19 Perforation Treatment Performed - Jet Perforation
2019-03-19 Plug Back Performed
2019-03-19 Well Log Performed
2019-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-20 Perforation Treatment Performed - Cement Squeeze
2019-03-20 Perforation Treatment Performed - Jet Perforation
2019-03-20 Plug Back Performed
2019-03-20 Well Fluid changed to Crude Oil
2019-03-20 Well Log Performed
2019-03-20 Well Mode changed to Abandoned Zone
2019-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-22 Perforation Treatment Performed - Cement Squeeze
2019-03-22 Perforation Treatment Performed - Jet Perforation
2019-03-22 Plug Back Performed
2019-03-22 Well Log Performed
2019-03-24 Well Abandoned
2019-03-24 Well Fluid changed to Crude Oil
2019-03-24 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-10-29 1150.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-11-06 Open Hole/Barefoot Completion 1496.50 1847.00 0
2019-03-22 Cement Squeeze 250.00 251.00 0
2019-03-22 Packing Device Capped w/Cement 234.60 242.60 0
2019-03-19 Packing Device Capped w/Cement 1400.50 1405.00 0
2019-03-19 Perforation 1400.00 1400.50 13
2019-03-20 Cement Squeeze 1400.00 1400.50 0
2019-03-20 Packing Device Capped w/Cement 1127.00 1135.00 0
2019-03-20 Packing Device Capped w/Cement 582.00 590.00 0
2019-03-20 Perforation 368.00 369.00 13
2019-03-22 Packing Device Capped w/Cement 355.60 363.60 0
2019-03-22 Perforation 250.00 251.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 894 0.0 0.0 0.0
1999 4984 0.0 0.0 0.0
2000 7826 0.0 0.0 0.0
2001 5696 0.0 0.0 0.0

For data sources see[6]

References