X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504261615022

Well Details

Well ID: 0504261615022
Loading map...
Location: 02/15-16-050-26W4/2
Location Alias: 02/15-16-50-26 W4M
Location Alias 2: 02/15-16-050-26 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 16
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 15-16-50-26
Operator Name: NEP Canada ULC
License Number: B0002587
License Date: 1949-01-13
License Status: Suspension
Spud Date: 1949-01-30
Final Drill Date: 1949-03-11
Well Total Depth: 1640.40 m
Surface Hole Latitude: 53.321477
Surface Hole Longitude: -113.742171

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-01-13 Obtained License
1949-02-21 Drill Stem Test Performed
1949-02-22 Drill Stem Test Performed
1949-02-23 Drill Stem Test Performed
1949-03-11 Finished Drilling
1949-03-11 Well Mode changed to Drilled and Cased
1949-03-15 Liner Casing Operation Performed
1949-03-18 Perforation Treatment Performed - Bullet Perforation
1985-05-11 Perforation Treatment Performed - Cement Squeeze
1985-06-05 Well Log Performed
1985-06-17 Well Log Performed
1985-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-18 Perforation Treatment Performed - Jet Perforation
1985-06-18 Well Log Performed
1985-06-25 Perforation Treatment Performed - Chemical Squeeze
1998-04-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-04-15 Plug Back Performed
1998-04-15 Well Log Performed
1998-04-19 Perforation Treatment Performed - Jet Perforation
1998-04-19 Well Log Performed
1998-04-20 Perforation Treatment Performed - Fractured
1998-04-28 Well Began Production
1998-04-28 Well Fluid changed to Crude Oil
1998-04-28 Well Mode changed to Pumping
1998-10-14 Well Log Performed
1998-10-15 Well Log Performed
1998-10-16 Well Log Performed
1998-10-18 Well Log Performed
1999-05-01 Well Began Injection
1999-05-01 Well Fluid changed to Water
1999-05-01 Well Type changed to Injection
2002-04-30 Perforation Treatment Performed - Cement Squeeze
2002-04-30 Plug Back Performed
2002-04-30 Well Fluid changed to Water
2002-04-30 Well Mode changed to Abandoned Zone
2002-04-30 Well Type changed to Injection
2002-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-05-07 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-03-18 Bullet Perforation 1635.90 1637.10 30
2002-05-07 Perforation 1615.00 1616.80 17
2002-05-07 Acid Treatment 1615.00 1616.80 0
1985-05-11 Cement Squeeze 1635.90 1637.10 0
1985-06-18 Perforation 1633.00 1633.10 13
1985-06-18 Acid Treatment 1633.00 1633.10 0
1985-06-25 Chemical Squeeze 1633.00 1633.10 0
1998-04-15 Packing Device Capped w/Cement 1614.00 1622.00 0
1998-04-19 Perforation 1188.50 1195.50 13
1998-04-20 Fracture 1188.50 1195.50 0
2002-04-30 Cement Squeeze 1188.50 1195.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 3758 0.0 0.0 0.0
1999 0 0.0 0.0 0.0

For data sources see[5]

References