X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262103023

Well Details

Well ID: 0504262103023
Loading map...
Location: 02/03-21-050-26W4/3
Location Alias: 02/03-21-50-26 W4M
Location Alias 2: 02/03-21-050-26 W4/03
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 21
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 3-21-50-26
Operator Name: NEP Canada ULC
License Number: 0000021
License Date: 1949-06-02
License Status: Abandoned
Spud Date: 1949-06-07
Final Drill Date: 1949-07-07
Well Total Depth: 1638.90 m
Surface Hole Latitude: 53.324943
Surface Hole Longitude: -113.747178

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-06-02 Obtained License
1949-06-20 Drill Stem Test Performed
1949-06-21 Drill Stem Test Performed
1949-06-22 Drill Stem Test Performed
1949-06-23 Drill Stem Test Performed
1949-06-24 Drill Stem Test Performed
1949-07-04 Liner Casing Operation Performed
1949-07-07 Finished Drilling
1949-07-07 Well Mode changed to Drilled and Cased
1949-07-10 Perforation Treatment Performed - Bullet Perforation
1982-07-16 Perforation Treatment Performed - Cement Squeeze
1982-07-23 Perforation Treatment Performed - Jet Perforation
1982-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-25 Well Log Performed
1988-01-26 Perforation Treatment Performed - Cement Squeeze
1988-01-27 Perforation Treatment Performed - Jet Perforation
1988-01-27 Well Log Performed
1988-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-29 Perforation Treatment Performed - Chemical Squeeze
1988-05-04 Perforation Treatment Performed - Cement Squeeze
1988-05-09 Well Log Performed
1988-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-10 Perforation Treatment Performed - Jet Perforation
1988-05-10 Well Log Performed
1988-05-12 Perforation Treatment Performed - Cement Squeeze
1988-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-16 Perforation Treatment Performed - Jet Perforation
1989-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-14 Well Log Performed
1989-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-08-17 Perforation Treatment Performed - Cement Squeeze
1989-08-23 Perforation Treatment Performed - Jet Perforation
1989-08-23 Well Log Performed
1989-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-08 Well Log Performed
1998-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-09 Perforation Treatment Performed - Jet Perforation
1998-09-09 Plug Back Performed
1998-09-09 Well Log Performed
1998-10-17 Perforation Treatment Performed - Fractured
2005-05-13 Perforation Treatment Performed - Cement Squeeze
2005-05-13 Plug Back Performed
2005-05-20 Perforation Treatment Performed - Jet Perforation
2019-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-17 Plug Back Performed
2019-02-17 Well Log Performed
2019-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-18 Perforation Treatment Performed - Jet Perforation
2019-02-18 Plug Back Performed
2019-02-18 Well Log Performed
2019-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-20 Perforation Treatment Performed - Cement Squeeze
2019-02-20 Plug Back Performed
2019-02-20 Well Mode changed to Abandoned Zone
2019-03-14 Well Abandoned
2019-03-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-07-10 Bullet Perforation 1634.60 1636.20 26
1988-05-10 Perforation 1623.70 1623.90 13
1988-05-10 Acid Treatment 1623.70 1623.90 0
1988-05-12 Cement Squeeze 1623.70 1623.90 0
1988-05-16 Perforation 1632.10 1632.20 13
1988-05-16 Acid Treatment 1632.10 1632.20 0
1989-08-14 Acid Treatment 1632.10 1632.20 0
1989-08-17 Acid Treatment 1632.10 1632.20 0
1989-08-17 Cement Squeeze 1632.10 1632.20 0
1989-08-23 Perforation 1629.00 1630.50 13
1989-08-25 Acid Treatment 1629.00 1630.50 0
1982-07-16 Cement Squeeze 1634.60 1636.20 0
1998-09-09 Packing Device Capped w/Cement 1601.00 1609.00 0
1998-09-09 Perforation 1305.00 1308.00 13
1998-10-17 Fracture 1305.00 1308.00 0
2005-05-13 Cement Squeeze 1305.00 1308.00 0
2005-05-20 Perforation 1610.00 1612.00 17
2019-02-17 Packing Device Capped w/Cement 1600.00 1608.00 0
2019-02-18 Packing Device Capped w/Cement 1577.00 1585.00 0
2019-02-18 Packing Device Capped w/Cement 1292.00 1300.00 0
2019-02-18 Perforation 371.00 372.00 16
2019-02-20 Cement Squeeze 371.00 372.00 0
1982-07-23 Perforation 1634.10 1634.30 10
2019-02-20 Packing Device Capped w/Cement 350.00 360.00 0
1982-07-26 Acid Treatment 1634.10 1634.30 0
1988-01-26 Cement Squeeze 1634.10 1634.30 0
1988-01-27 Perforation 1632.10 1632.20 13
1988-01-28 Acid Treatment 1632.10 1632.20 0
1988-01-29 Chemical Squeeze 1632.10 1632.20 0
1988-05-04 Cement Squeeze 1632.10 1632.20 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-09-04 No Incident Encountered 0.00 0.00
2005-05-19 No Incident Encountered 0.00 0.00
2019-02-18 No Incident Encountered 0.00 0.00

For data sources see[5]

References