If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504262108020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.328864,"lon":-113.735637,"icon":""}]} |
| Location: 02/08-21-050-26W4/0 | |
| Location Alias: 02/08-21-50-26 W4M | |
| Location Alias 2: 02/08-21-050-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 21 | |
| County/Municipality: Leduc County | |
| Well Name: MEC LEDUC-WB 8-21-50-26 | |
| Operator Name: NEP Canada ULC | |
| License Number: B0002649 | |
| License Date: 1949-02-19 | |
| License Status: Abandoned | |
| Spud Date: 1949-02-28 | |
| Final Drill Date: 1949-03-28 | |
| Well Total Depth: 1649.00 m | |
| Surface Hole Latitude: 53.328864 | |
| Surface Hole Longitude: -113.735637 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1949-02-19 | Obtained License |
| 1949-03-28 | Finished Drilling |
| 1949-03-28 | Well Mode changed to Drilled and Cased |
| 1949-04-01 | Liner Casing Operation Performed |
| 1949-04-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1949-04-05 | Perforation Treatment Performed - Bullet Perforation |
| 1949-04-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1949-04-11 | Perforation Treatment Performed - Bullet Perforation |
| 1949-04-14 | Perforation Treatment Performed - Bullet Perforation |
| 1949-04-15 | Perforation Treatment Performed - Bullet Perforation |
| 1949-04-16 | Well Began Production |
| 1949-04-16 | Well Fluid changed to Crude Oil |
| 1949-04-16 | Well Mode changed to Flowing |
| 1949-09-17 | Perforation Treatment Performed - Selective Bullet Perforations |
| 1949-09-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1949-09-26 | Perforation Treatment Performed - Bullet Perforation |
| 1949-10-05 | Perforation Treatment Performed - Bullet Perforation |
| 1949-10-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1960-08-23 | Perforation Treatment Performed - Jet Perforation |
| 1960-08-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1960-09-15 | Well Fluid changed to Crude Oil |
| 1960-09-15 | Well Mode changed to Flowing |
| 1961-03-29 | Well Fluid changed to Crude Oil |
| 1961-03-29 | Well Mode changed to Flowing |
| 1962-03-23 | Perforation Treatment Performed - Cement Squeeze |
| 1962-03-26 | Perforation Treatment Performed - Cement Squeeze |
| 1962-03-29 | Perforation Treatment Performed - Cement Squeeze |
| 1964-04-21 | Perforation Treatment Performed - Jet Perforation |
| 1964-04-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1964-04-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-06-21 | Perforation Treatment Performed - Cement Squeeze |
| 1974-06-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1974-06-25 | Perforation Treatment Performed - Cement Squeeze |
| 1974-06-27 | Perforation Treatment Performed - Cement Squeeze |
| 1974-07-02 | Perforation Treatment Performed - Jet Perforation |
| 1974-07-03 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1976-08-05 | Perforation Treatment Performed - Cement Squeeze |
| 1976-08-05 | Perforation Treatment Performed - Open-Hole Completion |
| 1976-10-26 | Perforation Treatment Performed - Jet Perforation |
| 1976-10-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1976-12-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1983-04-08 | Well Fluid changed to Crude Oil |
| 1983-04-08 | Well Mode changed to Suspended |
| 1985-12-09 | Perforation Treatment Performed - Cement Plug |
| 1985-12-09 | Plug Back Performed |
| 1985-12-09 | Well Fluid changed to Crude Oil |
| 1985-12-09 | Well Mode changed to Abandoned Zone |
| 1986-12-02 | Well Log Performed |
| 1986-12-03 | Perforation Treatment Performed - Jet Perforation |
| 1986-12-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1998-02-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1998-02-01 | Plug Back Performed |
| 1998-02-02 | Perforation Treatment Performed - Jet Perforation |
| 1998-02-02 | Well Log Performed |
| 1998-02-10 | Perforation Treatment Performed - Fractured |
| 2000-11-07 | Perforation Treatment Performed - Cement Squeeze |
| 2000-11-07 | Plug Back Performed |
| 2000-11-10 | Perforation Treatment Performed - Jet Perforation |
| 2019-09-16 | Well Log Performed |
| 2019-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-09-17 | Plug Back Performed |
| 2019-09-17 | Well Log Performed |
| 2019-09-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-09-18 | Perforation Treatment Performed - Jet Perforation |
| 2019-09-18 | Plug Back Performed |
| 2019-09-18 | Well Log Performed |
| 2019-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-09-19 | Perforation Treatment Performed - Cement Squeeze |
| 2019-09-19 | Plug Back Performed |
| 2019-10-24 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1949-04-05 | Bullet Perforation | 1631.00 | 1632.50 | 20 |
| 1949-09-26 | Bullet Perforation | 1631.30 | 1632.80 | 0 |
| 1949-10-05 | Bullet Perforation | 1630.70 | 1632.20 | 20 |
| 1949-10-11 | Acid Treatment | 1630.70 | 1632.20 | 0 |
| 1960-08-23 | Perforation | 1300.90 | 1311.90 | 7 |
| 1960-08-23 | Perforation | 1285.60 | 1300.90 | 3 |
| 1960-08-24 | Acid Treatment | 1285.60 | 1311.90 | 0 |
| 1962-03-23 | Cement Squeeze | 1285.60 | 1311.90 | 0 |
| 1962-03-26 | Cement Squeeze | 1285.60 | 1311.90 | 0 |
| 1962-03-29 | Cement Squeeze | 1285.60 | 1311.90 | 0 |
| 1964-04-21 | Perforation | 1633.10 | 1633.40 | 16 |
| 1949-04-05 | Acid Treatment | 1631.00 | 1632.50 | 0 |
| 1964-04-22 | Acid Treatment | 1633.10 | 1633.40 | 0 |
| 1964-04-23 | Acid Treatment | 1633.10 | 1633.40 | 0 |
| 1974-06-21 | Cement Squeeze | 1629.20 | 1633.40 | 0 |
| 1974-06-25 | Acid Treatment | 1629.20 | 1633.40 | 0 |
| 1974-06-25 | Cement Squeeze | 1629.20 | 1633.40 | 0 |
| 1974-06-27 | Cement Squeeze | 1629.20 | 1633.40 | 0 |
| 1974-07-02 | Perforation | 1631.60 | 1631.90 | 7 |
| 1974-07-03 | Acid Wash | 1631.60 | 1631.90 | 0 |
| 1976-08-05 | Cement Squeeze | 1631.60 | 1631.90 | 0 |
| 1976-08-05 | Open Hole/Barefoot Completion | 1634.60 | 1649.00 | 0 |
| 1949-04-06 | Acid Treatment | 1631.00 | 1632.50 | 0 |
| 1976-10-26 | Perforation | 1628.50 | 1629.80 | 7 |
| 1976-10-28 | Acid Treatment | 1628.50 | 1629.80 | 0 |
| 1976-12-17 | Acid Treatment | 1628.50 | 1629.80 | 0 |
| 1985-12-09 | Cement Plug | 1503.00 | 1631.00 | 0 |
| 1986-12-03 | Perforation | 1526.00 | 1529.00 | 13 |
| 1986-12-03 | Perforation | 1535.50 | 1537.50 | 13 |
| 1986-12-03 | Perforation | 1538.50 | 1541.50 | 13 |
| 1986-12-04 | Acid Treatment | 1526.00 | 1538.50 | 0 |
| 1998-02-01 | Packing Device Capped w/Cement | 1510.00 | 1518.00 | 0 |
| 1998-02-02 | Perforation | 1178.00 | 1188.00 | 14 |
| 1949-04-11 | Bullet Perforation | 1631.60 | 1633.10 | 30 |
| 1998-02-10 | Fracture | 1178.00 | 1188.00 | 0 |
| 2000-11-07 | Cement Squeeze | 1124.10 | 1510.00 | 0 |
| 2000-11-10 | Perforation | 1299.90 | 1304.90 | 17 |
| 2019-09-17 | Packing Device Capped w/Cement | 1272.00 | 1280.00 | 0 |
| 2019-09-18 | Packing Device Capped w/Cement | 1165.00 | 1173.00 | 0 |
| 2019-09-18 | Packing Device Capped w/Cement | 580.00 | 588.00 | 0 |
| 2019-09-18 | Perforation | 353.00 | 354.00 | 13 |
| 2019-09-19 | Cement Squeeze | 353.00 | 354.00 | 0 |
| 2019-09-19 | Packing Device Capped w/Cement | 342.00 | 350.00 | 0 |
| 1949-04-14 | Bullet Perforation | 1631.30 | 1632.80 | 7 |
| 1949-04-15 | Bullet Perforation | 1631.30 | 1632.80 | 26 |
| 1949-09-17 | Selective Bullet Perforations | 1629.20 | 1629.20 | 0 |
| 1949-09-17 | Selective Bullet Perforations | 1629.20 | 1629.20 | 0 |
| 1949-09-21 | Acid Treatment | 1629.20 | 1629.20 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1972 | 24 | 0.0 | 0.0 | 0.0 |
| 1974 | 96 | 0.0 | 0.0 | 0.0 |
| 1976 | 72 | 0.0 | 0.0 | 0.0 |
| 1978 | 2104 | 0.0 | 0.0 | 0.0 |
| 1979 | 8256 | 0.0 | 0.0 | 0.0 |
| 1980 | 8096 | 0.0 | 0.0 | 0.0 |
| 1981 | 852 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-09-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]