X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262108020

Well Details

Well ID: 0504262108020
Loading map...
Location: 02/08-21-050-26W4/0
Location Alias: 02/08-21-50-26 W4M
Location Alias 2: 02/08-21-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 21
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 8-21-50-26
Operator Name: NEP Canada ULC
License Number: B0002649
License Date: 1949-02-19
License Status: Abandoned
Spud Date: 1949-02-28
Final Drill Date: 1949-03-28
Well Total Depth: 1649.00 m
Surface Hole Latitude: 53.328864
Surface Hole Longitude: -113.735637

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-02-19 Obtained License
1949-03-28 Finished Drilling
1949-03-28 Well Mode changed to Drilled and Cased
1949-04-01 Liner Casing Operation Performed
1949-04-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-04-05 Perforation Treatment Performed - Bullet Perforation
1949-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-04-11 Perforation Treatment Performed - Bullet Perforation
1949-04-14 Perforation Treatment Performed - Bullet Perforation
1949-04-15 Perforation Treatment Performed - Bullet Perforation
1949-04-16 Well Began Production
1949-04-16 Well Fluid changed to Crude Oil
1949-04-16 Well Mode changed to Flowing
1949-09-17 Perforation Treatment Performed - Selective Bullet Perforations
1949-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-09-26 Perforation Treatment Performed - Bullet Perforation
1949-10-05 Perforation Treatment Performed - Bullet Perforation
1949-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-23 Perforation Treatment Performed - Jet Perforation
1960-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-15 Well Fluid changed to Crude Oil
1960-09-15 Well Mode changed to Flowing
1961-03-29 Well Fluid changed to Crude Oil
1961-03-29 Well Mode changed to Flowing
1962-03-23 Perforation Treatment Performed - Cement Squeeze
1962-03-26 Perforation Treatment Performed - Cement Squeeze
1962-03-29 Perforation Treatment Performed - Cement Squeeze
1964-04-21 Perforation Treatment Performed - Jet Perforation
1964-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-21 Perforation Treatment Performed - Cement Squeeze
1974-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-06-25 Perforation Treatment Performed - Cement Squeeze
1974-06-27 Perforation Treatment Performed - Cement Squeeze
1974-07-02 Perforation Treatment Performed - Jet Perforation
1974-07-03 Perforation Treatment Performed - Acid Wash - No Pressure
1976-08-05 Perforation Treatment Performed - Cement Squeeze
1976-08-05 Perforation Treatment Performed - Open-Hole Completion
1976-10-26 Perforation Treatment Performed - Jet Perforation
1976-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-08 Well Fluid changed to Crude Oil
1983-04-08 Well Mode changed to Suspended
1985-12-09 Perforation Treatment Performed - Cement Plug
1985-12-09 Plug Back Performed
1985-12-09 Well Fluid changed to Crude Oil
1985-12-09 Well Mode changed to Abandoned Zone
1986-12-02 Well Log Performed
1986-12-03 Perforation Treatment Performed - Jet Perforation
1986-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-01 Plug Back Performed
1998-02-02 Perforation Treatment Performed - Jet Perforation
1998-02-02 Well Log Performed
1998-02-10 Perforation Treatment Performed - Fractured
2000-11-07 Perforation Treatment Performed - Cement Squeeze
2000-11-07 Plug Back Performed
2000-11-10 Perforation Treatment Performed - Jet Perforation
2019-09-16 Well Log Performed
2019-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-17 Plug Back Performed
2019-09-17 Well Log Performed
2019-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-18 Perforation Treatment Performed - Jet Perforation
2019-09-18 Plug Back Performed
2019-09-18 Well Log Performed
2019-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-19 Perforation Treatment Performed - Cement Squeeze
2019-09-19 Plug Back Performed
2019-10-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-04-05 Bullet Perforation 1631.00 1632.50 20
1949-09-26 Bullet Perforation 1631.30 1632.80 0
1949-10-05 Bullet Perforation 1630.70 1632.20 20
1949-10-11 Acid Treatment 1630.70 1632.20 0
1960-08-23 Perforation 1300.90 1311.90 7
1960-08-23 Perforation 1285.60 1300.90 3
1960-08-24 Acid Treatment 1285.60 1311.90 0
1962-03-23 Cement Squeeze 1285.60 1311.90 0
1962-03-26 Cement Squeeze 1285.60 1311.90 0
1962-03-29 Cement Squeeze 1285.60 1311.90 0
1964-04-21 Perforation 1633.10 1633.40 16
1949-04-05 Acid Treatment 1631.00 1632.50 0
1964-04-22 Acid Treatment 1633.10 1633.40 0
1964-04-23 Acid Treatment 1633.10 1633.40 0
1974-06-21 Cement Squeeze 1629.20 1633.40 0
1974-06-25 Acid Treatment 1629.20 1633.40 0
1974-06-25 Cement Squeeze 1629.20 1633.40 0
1974-06-27 Cement Squeeze 1629.20 1633.40 0
1974-07-02 Perforation 1631.60 1631.90 7
1974-07-03 Acid Wash 1631.60 1631.90 0
1976-08-05 Cement Squeeze 1631.60 1631.90 0
1976-08-05 Open Hole/Barefoot Completion 1634.60 1649.00 0
1949-04-06 Acid Treatment 1631.00 1632.50 0
1976-10-26 Perforation 1628.50 1629.80 7
1976-10-28 Acid Treatment 1628.50 1629.80 0
1976-12-17 Acid Treatment 1628.50 1629.80 0
1985-12-09 Cement Plug 1503.00 1631.00 0
1986-12-03 Perforation 1526.00 1529.00 13
1986-12-03 Perforation 1535.50 1537.50 13
1986-12-03 Perforation 1538.50 1541.50 13
1986-12-04 Acid Treatment 1526.00 1538.50 0
1998-02-01 Packing Device Capped w/Cement 1510.00 1518.00 0
1998-02-02 Perforation 1178.00 1188.00 14
1949-04-11 Bullet Perforation 1631.60 1633.10 30
1998-02-10 Fracture 1178.00 1188.00 0
2000-11-07 Cement Squeeze 1124.10 1510.00 0
2000-11-10 Perforation 1299.90 1304.90 17
2019-09-17 Packing Device Capped w/Cement 1272.00 1280.00 0
2019-09-18 Packing Device Capped w/Cement 1165.00 1173.00 0
2019-09-18 Packing Device Capped w/Cement 580.00 588.00 0
2019-09-18 Perforation 353.00 354.00 13
2019-09-19 Cement Squeeze 353.00 354.00 0
2019-09-19 Packing Device Capped w/Cement 342.00 350.00 0
1949-04-14 Bullet Perforation 1631.30 1632.80 7
1949-04-15 Bullet Perforation 1631.30 1632.80 26
1949-09-17 Selective Bullet Perforations 1629.20 1629.20 0
1949-09-17 Selective Bullet Perforations 1629.20 1629.20 0
1949-09-21 Acid Treatment 1629.20 1629.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1972 24 0.0 0.0 0.0
1974 96 0.0 0.0 0.0
1976 72 0.0 0.0 0.0
1978 2104 0.0 0.0 0.0
1979 8256 0.0 0.0 0.0
1980 8096 0.0 0.0 0.0
1981 852 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References