X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262513020

Well Details

Well ID: 0504262513020
Loading map...
Location: 02/13-25-050-26W4/0
Location Alias: 02/13-25-50-26 W4M
Location Alias 2: 02/13-25-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 25
County/Municipality: Edmonton
Well Name: CENTRAL CO-OP #5C
Operator Name: Imperial Oil Resources Limited
License Number: B0002266
License Date: 1948-08-10
License Status: RecCertified
Spud Date: 1948-08-13
Final Drill Date: 1948-09-01
Well Total Depth: 1280.50 m
Surface Hole Latitude: 53.350471
Surface Hole Longitude: -113.680498

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-08-10 Obtained License
1948-08-29 Drill Stem Test Performed
1948-08-31 Drill Stem Test Performed
1948-09-01 Drill Stem Test Performed
1948-09-01 Finished Drilling
1948-09-01 Well Mode changed to Drilled and Cased
1948-09-03 Production Casing Operation Performed
1948-09-22 Drill Stem Test Performed
1948-09-26 Perforation Treatment Performed - Selective Bullet Perforations
1948-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1948-10-05 Perforation Treatment Performed - Selective Bullet Perforations
1948-10-12 Perforation Treatment Performed - Bullet Perforation
1948-10-12 Well Began Production
1948-10-12 Well Fluid changed to Crude Oil
1948-10-12 Well Mode changed to Flowing
1960-09-19 Perforation Treatment Performed - Jet Perforation
1960-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-07-26 Well Fluid changed to Gas
1962-07-26 Well Mode changed to Flowing
1979-09-30 Well Fluid changed to Gas
1979-09-30 Well Mode changed to Suspended
1995-05-10 Perforation Treatment Performed - Jet Perforation
1995-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-10 Perforation Treatment Performed - Jet Perforation
1996-07-10 Plug Back Performed
1996-07-10 Well Log Performed
1996-08-08 Perforation Treatment Performed - Remedial Casing
1996-08-19 Well Abandoned
1996-08-19 Well Fluid changed to Gas
1996-08-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-09-26 Selective Bullet Perforations 1270.70 1270.70 10
1996-07-10 Packing Device Capped w/Cement 1224.00 1232.00 0
1996-07-10 Perforation 160.00 161.00 13
1996-08-08 Remedial Casing Cementing 160.00 161.00 0
1948-09-29 Acid Treatment 1270.70 1270.70 0
1948-10-05 Selective Bullet Perforations 1270.10 1270.10 10
1948-10-12 Bullet Perforation 1269.50 1270.70 20
1960-09-19 Perforation 1260.70 1263.70 7
1960-09-19 Perforation 1264.30 1269.20 7
1960-09-20 Acid Treatment 1260.70 1269.20 0
1995-05-10 Perforation 1260.30 1262.90 16
1995-05-12 Acid Treatment 1260.30 1262.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7915 0.0 0.0 0.0
1968 7804 0.0 0.0 0.0
1969 3431 0.0 0.0 0.0
1970 8046 0.0 0.0 0.0
1971 7455 0.0 0.0 0.0
1972 1368 0.0 0.0 0.0
1995 1065 0.0 0.0 0.0

For data sources see[5]

References