If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504262608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.343313,"lon":-113.687626,"icon":""}]} |
Location: 00/08-26-050-26W4/0 | |
Location Alias: 00/08-26-50-26 W4M | |
Location Alias 2: 00/08-26-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 26 | |
County/Municipality: Devon | |
Well Name: IMPERIAL HUDSON'S BAY LEDUC NO. 31 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: B0001985 | |
License Date: 1947-12-24 | |
License Status: RecCertified | |
Spud Date: 1947-12-24 | |
Final Drill Date: 1948-01-23 | |
Well Total Depth: 1623.70 m | |
Surface Hole Latitude: 53.343313 | |
Surface Hole Longitude: -113.687626 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1947-12-24 | Obtained License |
1948-01-20 | Production Casing Operation Performed |
1948-01-23 | Finished Drilling |
1948-01-23 | Perforation Treatment Performed - Open-Hole Completion |
1948-01-23 | Well Mode changed to Drilled and Cased |
1948-01-25 | Well Began Production |
1948-01-25 | Well Fluid changed to Crude Oil |
1948-01-25 | Well Mode changed to Flowing |
1957-05-12 | Well Fluid changed to Crude Oil |
1957-05-12 | Well Mode changed to Pumping |
1983-04-08 | Well Fluid changed to Crude Oil |
1983-04-08 | Well Mode changed to Suspended |
1992-04-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1992-04-24 | Perforation Treatment Performed - Jet Perforation |
1992-04-24 | Plug Back Performed |
1992-04-24 | Well Log Performed |
1992-05-24 | Perforation Treatment Performed - Cement Plug |
1992-05-24 | Perforation Treatment Performed - Remedial Casing |
1992-05-24 | Well Fluid changed to Crude Oil |
1992-05-24 | Well Mode changed to Abandoned |
1992-06-04 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1948-01-23 | Open Hole/Barefoot Completion | 1622.10 | 1623.70 | 0 |
1992-04-24 | Packing Device Capped w/Cement | 1599.00 | 1607.00 | 0 |
1992-04-24 | Perforation | 160.00 | 160.50 | 13 |
1992-05-24 | Remedial Casing Cementing | 160.00 | 160.50 | 0 |
1992-05-24 | Cement Plug | 64.00 | 160.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 160 | 0.0 | 0.0 | 0.0 |
For data sources see[5]