If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504262613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.350525,"lon":-113.704864,"icon":""}]} |
Location: 00/13-26-050-26W4/0 | |
Location Alias: 00/13-26-50-26 W4M | |
Location Alias 2: 00/13-26-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 26 | |
County/Municipality: Devon | |
Well Name: IMPERIAL HUDSON'S BAY LEDUC NO. 108 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: B0002338 | |
License Date: 1948-09-11 | |
License Status: Abandoned | |
Spud Date: 1948-09-21 | |
Final Drill Date: 1948-10-18 | |
Well Total Depth: 1629.70 m | |
Surface Hole Latitude: 53.350525 | |
Surface Hole Longitude: -113.704864 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1948-09-11 | Obtained License |
1948-10-09 | Drill Stem Test Performed |
1948-10-10 | Drill Stem Test Performed |
1948-10-18 | Finished Drilling |
1948-10-18 | Well Mode changed to Drilled and Cased |
1948-10-19 | Liner Casing Operation Performed |
1948-10-22 | Perforation Treatment Performed - Bullet Perforation |
1948-10-25 | Perforation Treatment Performed - Acid Wash - No Pressure |
1948-10-25 | Well Began Production |
1948-10-25 | Well Fluid changed to Crude Oil |
1948-10-25 | Well Mode changed to Flowing |
1977-04-05 | Well Fluid changed to Crude Oil |
1977-04-05 | Well Mode changed to Pumping |
1986-11-17 | Well Fluid changed to Crude Oil |
1986-11-17 | Well Mode changed to Suspended |
1989-06-03 | Well Log Performed |
1989-06-04 | Perforation Treatment Performed - Cement Squeeze |
1989-06-11 | Perforation Treatment Performed - Open-Hole Completion |
1989-06-14 | Well Log Performed |
1989-06-15 | Perforation Treatment Performed - Cement Squeeze |
1989-06-16 | Perforation Treatment Performed - Jet Perforation |
1989-06-16 | Well Log Performed |
1989-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-10-31 | Well Fluid changed to Gas |
1989-10-31 | Well Mode changed to Flowing |
1990-11-08 | Well Log Performed |
1991-02-12 | Well Log Performed |
1991-08-13 | Well Log Performed |
1993-08-13 | Well Log Performed |
1995-12-01 | Well Fluid changed to Gas |
1995-12-01 | Well Mode changed to Suspended |
1996-05-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-05-22 | Perforation Treatment Performed - Cement Plug |
1996-05-22 | Perforation Treatment Performed - Jet Perforation |
1996-05-22 | Perforation Treatment Performed - Remedial Casing |
1996-05-22 | Plug Back Performed |
1996-05-22 | Well Log Performed |
1996-06-17 | Well Abandoned |
1996-06-17 | Well Fluid changed to Gas |
1996-06-17 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1948-10-22 | Bullet Perforation | 1610.60 | 1612.10 | 20 |
1996-05-22 | Perforation | 160.00 | 161.00 | 13 |
1996-05-22 | Remedial Casing Cementing | 160.00 | 161.00 | 0 |
1996-05-22 | Cement Plug | 71.70 | 161.00 | 0 |
1948-10-25 | Acid Wash | 1610.60 | 1612.10 | 0 |
1989-06-04 | Cement Squeeze | 1610.60 | 1612.10 | 0 |
1989-06-11 | Open Hole/Barefoot Completion | 1614.20 | 1629.70 | 0 |
1989-06-15 | Cement Squeeze | 1614.20 | 1629.70 | 0 |
1989-06-16 | Perforation | 1553.00 | 1557.00 | 13 |
1989-06-17 | Acid Treatment | 1553.00 | 1557.00 | 0 |
1996-05-22 | Packing Device Capped w/Cement | 1532.00 | 1540.00 | 0 |
1996-05-22 | Packing Device Capped w/Cement | 572.00 | 580.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 8441 | 0.0 | 0.0 | 0.0 |
1968 | 7445 | 0.0 | 0.0 | 0.0 |
1969 | 4116 | 0.0 | 0.0 | 0.0 |
1970 | 1944 | 0.0 | 0.0 | 0.0 |
1971 | 3600 | 0.0 | 0.0 | 0.0 |
1972 | 7340 | 0.0 | 0.0 | 0.0 |
1973 | 8128 | 0.0 | 0.0 | 0.0 |
1974 | 8177 | 0.0 | 0.0 | 0.0 |
1975 | 7478 | 0.0 | 0.0 | 0.0 |
1976 | 8223 | 0.0 | 0.0 | 0.0 |
1977 | 8432 | 0.0 | 0.0 | 0.0 |
1978 | 8211 | 0.0 | 0.0 | 0.0 |
1979 | 8537 | 0.0 | 0.0 | 0.0 |
1980 | 8157 | 0.0 | 0.0 | 0.0 |
1981 | 7583 | 0.0 | 0.0 | 0.0 |
1982 | 7837 | 0.0 | 0.0 | 0.0 |
1983 | 6861 | 0.0 | 0.0 | 0.0 |
1984 | 8600 | 0.0 | 0.0 | 0.0 |
1985 | 6966 | 0.0 | 0.0 | 0.0 |
1986 | 288 | 0.0 | 0.0 | 0.0 |
1989 | 1463 | 0.0 | 0.0 | 0.0 |
1990 | 6824 | 0.0 | 0.0 | 0.0 |
1991 | 8128 | 0.0 | 0.0 | 0.0 |
1992 | 8327 | 0.0 | 0.0 | 0.0 |
1993 | 8183 | 0.0 | 0.0 | 0.0 |
1994 | 8578 | 0.0 | 0.0 | 0.0 |
1995 | 6912 | 0.0 | 0.0 | 0.0 |
For data sources see[5]