X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262616000

Well Details

Well ID: 0504262616000
Loading map...
Location: 00/16-26-050-26W4/0
Location Alias: 00/16-26-50-26 W4M
Location Alias 2: 00/16-26-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 26
County/Municipality: Edmonton
Well Name: IMPERIAL LEDUC NO. 80
Operator Name: Imperial Oil Resources Limited
License Number: B0002138
License Date: 1948-06-10
License Status: RecCertified
Spud Date: 1948-06-15
Final Drill Date: 1948-07-21
Well Total Depth: 1616.70 m
Surface Hole Latitude: 53.350471
Surface Hole Longitude: -113.686848

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-06-10 Obtained License
1948-06-30 Drill Stem Test Performed
1948-07-01 Drill Stem Test Performed
1948-07-03 Drill Stem Test Performed
1948-07-04 Drill Stem Test Performed
1948-07-17 Drill Stem Test Performed
1948-07-21 Finished Drilling
1948-07-21 Well Mode changed to Drilled and Cased
1948-07-23 Production Casing Operation Performed
1948-07-25 Perforation Treatment Performed - Acid Wash - No Pressure
1948-07-25 Perforation Treatment Performed - Bullet Perforation
1948-07-26 Well Began Production
1948-07-26 Well Fluid changed to Crude Oil
1948-07-26 Well Mode changed to Flowing
1972-06-30 Well Fluid changed to Crude Oil
1972-06-30 Well Mode changed to Pumping
1982-06-15 Perforation Treatment Performed - Cement Squeeze
1982-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-17 Perforation Treatment Performed - Jet Perforation
1990-03-15 Well Fluid changed to Crude Oil
1990-03-15 Well Mode changed to Suspended
1995-05-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-05-19 Plug Back Performed
1995-05-19 Well Log Performed
1995-05-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-05-24 Well Fluid changed to Crude Oil
1995-05-24 Well Mode changed to Abandoned
1995-06-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1948-07-25 Bullet Perforation 1613.00 1614.50 13
1948-07-25 Acid Wash 1613.00 1614.50 0
1982-06-15 Cement Squeeze 1613.00 1614.50 0
1982-06-17 Perforation 1613.00 1613.20 10
1982-06-17 Acid Treatment 1613.00 1613.20 0
1995-05-19 Packing Device Capped w/Cement 1591.00 1599.00 0
1995-05-24 Packing Device Capped w/Cement 884.90 1223.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8635 0.0 0.0 0.0
1968 8319 0.0 0.0 0.0
1969 4007 0.0 0.0 0.0
1970 8556 0.0 0.0 0.0
1971 7924 0.0 0.0 0.0
1972 7148 0.0 0.0 0.0
1973 8456 0.0 0.0 0.0
1974 8031 0.0 0.0 0.0
1975 8439 0.0 0.0 0.0
1976 3836 0.0 0.0 0.0
1982 3048 0.0 0.0 0.0
1983 8584 0.0 0.0 0.0
1984 8617 0.0 0.0 0.0
1985 7800 0.0 0.0 0.0
1986 7558 0.0 0.0 0.0
1987 5353 0.0 0.0 0.0
1988 6227 0.0 0.0 0.0
1989 8001 0.0 0.0 0.0
1990 1706 0.0 0.0 0.0

For data sources see[5]

References