X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262703000

Well Details

Well ID: 0504262703000
Loading map...
Location: 00/03-27-050-26W4/0
Location Alias: 00/03-27-50-26 W4M
Location Alias 2: 00/03-27-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 27
County/Municipality: Devon
Well Name: IMPERIAL LEDUC NO. 262
Operator Name: Imperial Oil Resources Limited
License Number: 0001493
License Date: 1950-05-20
License Status: RecCertified
Spud Date: 1950-07-27
Final Drill Date: 1950-08-27
Well Total Depth: 1630.00 m
Surface Hole Latitude: 53.339674
Surface Hole Longitude: -113.723184

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-05-20 Obtained License
1950-08-18 Drill Stem Test Performed
1950-08-21 Liner Casing Operation Performed
1950-08-27 Finished Drilling
1950-08-27 Well Mode changed to Drilled and Cased
1950-08-31 Perforation Treatment Performed - Acid Wash - No Pressure
1950-08-31 Perforation Treatment Performed - Bullet Perforation
1950-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1950-09-02 Well Began Production
1950-09-02 Well Fluid changed to Crude Oil
1950-09-02 Well Mode changed to Flowing
1973-09-14 Perforation Treatment Performed - Cement Squeeze
1973-09-19 Perforation Treatment Performed - Acid Wash - No Pressure
1973-09-19 Perforation Treatment Performed - Jet Perforation
1978-05-12 Well Fluid changed to Crude Oil
1978-05-12 Well Mode changed to Pumping
1985-02-27 Perforation Treatment Performed - Cement Squeeze
1985-02-27 Well Log Performed
1985-03-01 Well Log Performed
1985-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-04 Perforation Treatment Performed - Jet Perforation
1985-03-06 Perforation Treatment Performed - Cement Squeeze
1985-03-08 Well Log Performed
1985-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-11 Perforation Treatment Performed - Jet Perforation
1985-03-11 Well Log Performed
1988-11-04 Well Log Performed
1989-06-08 Well Fluid changed to Crude Oil
1989-06-08 Well Mode changed to Suspended
1989-06-23 Well Log Performed
1989-06-24 Well Log Performed
1989-06-25 Perforation Treatment Performed - Cement Squeeze
1989-06-27 Well Log Performed
1989-06-28 Perforation Treatment Performed - Open-Hole Completion
1989-06-29 Well Log Performed
1989-07-01 Well Log Performed
1989-07-02 Perforation Treatment Performed - Cement Squeeze
1989-07-02 Perforation Treatment Performed - Jet Perforation
1989-07-02 Well Log Performed
1989-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-26 Well Fluid changed to Gas
1989-10-26 Well Mode changed to Flowing
1990-01-10 Well Log Performed
1990-10-25 Well Log Performed
1991-02-14 Well Log Performed
1991-07-09 Well Log Performed
1992-02-10 Well Log Performed
1992-08-08 Well Log Performed
1993-02-13 Well Log Performed
1993-08-13 Well Log Performed
1994-08-16 Well Fluid changed to Gas
1994-08-16 Well Mode changed to Suspended
1995-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-12 Perforation Treatment Performed - Jet Perforation
1995-07-12 Plug Back Performed
1995-07-12 Well Log Performed
1995-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-28 Perforation Treatment Performed - Remedial Casing
1995-07-28 Well Fluid changed to Gas
1995-07-28 Well Mode changed to Abandoned
1995-08-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-08-31 Bullet Perforation 1617.90 1619.40 13
1985-03-06 Cement Squeeze 1618.20 1618.40 0
1985-03-11 Perforation 1618.00 1618.10 13
1985-03-11 Acid Treatment 1618.00 1618.10 0
1989-06-25 Cement Squeeze 1618.00 1618.10 0
1989-06-28 Open Hole/Barefoot Completion 1621.50 1630.00 0
1989-07-02 Cement Squeeze 1621.50 1630.00 0
1989-07-02 Perforation 1576.00 1581.00 13
1989-07-03 Acid Treatment 1576.00 1581.00 0
1995-07-12 Packing Device Capped w/Cement 1542.00 1550.00 0
1995-07-12 Perforation 160.00 161.00 14
1950-08-31 Acid Wash 1617.90 1619.40 0
1995-07-28 Remedial Casing Cementing 160.00 161.00 0
1995-07-28 Packing Device Capped w/Cement 44.00 164.00 0
1950-09-01 Acid Treatment 1617.90 1619.40 0
1973-09-14 Cement Squeeze 1617.90 1619.40 0
1973-09-19 Perforation 1618.80 1619.00 10
1973-09-19 Acid Wash 1618.80 1619.00 0
1985-02-27 Cement Squeeze 1618.80 1619.00 0
1985-03-04 Perforation 1618.20 1618.40 13
1985-03-04 Acid Treatment 1618.20 1618.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1967 405 0.0 0.0 0.0
1972 72 0.0 0.0 0.0
1973 2364 0.0 0.0 0.0
1974 8292 0.0 0.0 0.0
1975 8611 0.0 0.0 0.0
1976 8603 0.0 0.0 0.0
1977 8491 0.0 0.0 0.0
1978 5796 0.0 0.0 0.0
1979 7608 0.0 0.0 0.0
1980 8243 0.0 0.0 0.0
1981 7231 0.0 0.0 0.0
1982 7823 0.0 0.0 0.0
1983 8376 0.0 0.0 0.0
1984 7558 0.0 0.0 0.0
1985 7676 0.0 0.0 0.0
1986 6570 0.0 0.0 0.0
1987 7662 0.0 0.0 0.0
1988 7911 0.0 0.0 0.0
1989 5548 0.0 0.0 0.0
1990 7170 0.0 0.0 0.0
1991 8223 0.0 0.0 0.0
1992 8607 0.0 0.0 0.0
1993 8202 0.0 0.0 0.0
1994 3818 0.0 0.0 0.0

For data sources see[5]

References