If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504262708000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.343028,"lon":-113.7112,"icon":""}]} |
Location: 00/08-27-050-26W4/0 | |
Location Alias: 00/08-27-50-26 W4M | |
Location Alias 2: 00/08-27-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 27 | |
County/Municipality: Devon | |
Well Name: IMPERIAL LEDUC NO. 132 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: B0002419 | |
License Date: 1948-10-21 | |
License Status: RecCertified | |
Spud Date: 1948-11-10 | |
Final Drill Date: 1948-12-17 | |
Well Total Depth: 1618.20 m | |
Surface Hole Latitude: 53.343028 | |
Surface Hole Longitude: -113.711200 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1948-10-21 | Obtained License |
1948-12-07 | Drill Stem Test Performed |
1948-12-09 | Drill Stem Test Performed |
1948-12-17 | Finished Drilling |
1948-12-17 | Well Mode changed to Drilled and Cased |
1948-12-18 | Liner Casing Operation Performed |
1948-12-22 | Perforation Treatment Performed - Bullet Perforation |
1948-12-23 | Well Began Production |
1948-12-23 | Well Fluid changed to Crude Oil |
1948-12-23 | Well Mode changed to Flowing |
1972-05-01 | Well Fluid changed to Crude Oil |
1972-05-01 | Well Mode changed to Pumping |
1984-11-09 | Well Log Performed |
1984-11-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-11-13 | Perforation Treatment Performed - Cement Squeeze |
1984-11-16 | Perforation Treatment Performed - Jet Perforation |
1984-11-16 | Well Log Performed |
1984-11-19 | Perforation Treatment Performed - Acid Wash - No Pressure |
1990-02-07 | Well Fluid changed to Crude Oil |
1990-02-07 | Well Mode changed to Suspended |
1995-03-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-03-29 | Perforation Treatment Performed - Jet Perforation |
1995-03-29 | Plug Back Performed |
1995-03-29 | Well Log Performed |
1995-04-21 | Perforation Treatment Performed - Remedial Casing |
1995-04-21 | Well Fluid changed to Crude Oil |
1995-04-21 | Well Mode changed to Abandoned |
2006-09-26 | Well Log Performed |
2006-09-27 | Perforation Treatment Performed - Jet Perforation |
2006-09-27 | Well Log Performed |
2006-09-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-28 | Perforation Treatment Performed - Jet Perforation |
2006-09-28 | Well Log Performed |
2006-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-09-29 | Perforation Treatment Performed - Jet Perforation |
2006-09-29 | Perforation Treatment Performed - Remedial Casing |
2006-09-29 | Plug Back Performed |
2006-09-29 | Well Log Performed |
2006-10-11 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1948-12-22 | Bullet Perforation | 1614.50 | 1616.00 | 20 |
2006-09-27 | Perforation | 412.50 | 414.50 | 17 |
2006-09-28 | Packing Device Capped w/Cement | 342.00 | 402.00 | 0 |
2006-09-28 | Perforation | 191.00 | 192.00 | 17 |
2006-09-29 | Packing Device Capped w/Cement | 177.00 | 185.00 | 0 |
2006-09-29 | Perforation | 133.50 | 134.50 | 17 |
2006-09-29 | Remedial Casing Cementing | 133.50 | 134.50 | 0 |
2006-09-29 | Packing Device Capped w/Cement | 107.00 | 122.00 | 0 |
1984-11-13 | Acid Treatment | 1614.50 | 1616.00 | 0 |
1984-11-13 | Cement Squeeze | 1614.50 | 1616.00 | 0 |
1984-11-16 | Perforation | 1612.70 | 1612.90 | 13 |
1984-11-19 | Acid Wash | 1612.70 | 1612.90 | 0 |
1995-03-29 | Packing Device Capped w/Cement | 1592.00 | 1600.00 | 0 |
1995-03-29 | Packing Device Capped w/Cement | 582.00 | 590.00 | 0 |
1995-03-29 | Perforation | 160.00 | 161.00 | 13 |
1995-04-21 | Remedial Casing Cementing | 160.00 | 161.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 8398 | 0.0 | 0.0 | 0.0 |
1968 | 7704 | 0.0 | 0.0 | 0.0 |
1969 | 7828 | 0.0 | 0.0 | 0.0 |
1970 | 6943 | 0.0 | 0.0 | 0.0 |
1971 | 6997 | 0.0 | 0.0 | 0.0 |
1972 | 6980 | 0.0 | 0.0 | 0.0 |
1973 | 8579 | 0.0 | 0.0 | 0.0 |
1974 | 8475 | 0.0 | 0.0 | 0.0 |
1975 | 8575 | 0.0 | 0.0 | 0.0 |
1976 | 8603 | 0.0 | 0.0 | 0.0 |
1977 | 8394 | 0.0 | 0.0 | 0.0 |
1978 | 8183 | 0.0 | 0.0 | 0.0 |
1979 | 8399 | 0.0 | 0.0 | 0.0 |
1980 | 7056 | 0.0 | 0.0 | 0.0 |
1981 | 8591 | 0.0 | 0.0 | 0.0 |
1982 | 6504 | 0.0 | 0.0 | 0.0 |
1983 | 6932 | 0.0 | 0.0 | 0.0 |
1984 | 7476 | 0.0 | 0.0 | 0.0 |
1985 | 8300 | 0.0 | 0.0 | 0.0 |
1986 | 8471 | 0.0 | 0.0 | 0.0 |
1987 | 8497 | 0.0 | 0.0 | 0.0 |
1988 | 8608 | 0.0 | 0.0 | 0.0 |
1989 | 8266 | 0.0 | 0.0 | 0.0 |
1990 | 870 | 0.0 | 0.0 | 0.0 |
For data sources see[5]