Well Details

Well ID: 0504262711000
Loading map...
Location: 00/11-27-050-26W4/0
Location Alias: 00/11-27-50-26 W4M
Location Alias 2: 00/11-27-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 27
County/Municipality: Devon
Well Name: IMPERIAL LEDUC NO. 150
Operator Name: Imperial Oil Resources Limited
License Number: B0002505
License Date: 1948-12-01
License Status: RecCertified
Spud Date: 1949-01-05
Final Drill Date: 1949-02-12
Well Total Depth: 1626.00 m
Surface Hole Latitude: 53.346900
Surface Hole Longitude: -113.723228

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-12-01 Obtained License
1949-02-03 Liner Casing Operation Performed
1949-02-12 Finished Drilling
1949-02-12 Well Mode changed to Drilled and Cased
1949-02-16 Perforation Treatment Performed - Bullet Perforation
1949-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-02-20 Well Began Production
1949-02-20 Well Fluid changed to Crude Oil
1949-02-20 Well Mode changed to Flowing
1983-08-24 Perforation Treatment Performed - Cement Squeeze
1983-08-24 Well Log Performed
1983-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-26 Perforation Treatment Performed - Jet Perforation
1983-08-29 Perforation Treatment Performed - Cement Squeeze
1983-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-31 Perforation Treatment Performed - Jet Perforation
1983-08-31 Well Log Performed
1983-09-06 Well Fluid changed to Crude Oil
1983-09-06 Well Mode changed to Pumping
1985-07-25 Perforation Treatment Performed - Cement Squeeze
1985-07-29 Perforation Treatment Performed - Jet Perforation
1985-07-29 Well Log Performed
1985-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-01 Perforation Treatment Performed - Cement Squeeze
1985-08-06 Perforation Treatment Performed - Jet Perforation
1985-08-06 Well Log Performed
1985-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-01-05 Well Fluid changed to Crude Oil
1987-01-05 Well Mode changed to Suspended
1988-04-28 Perforation Treatment Performed - Cement Squeeze
1989-03-25 Well Log Performed
1989-03-27 Well Log Performed
1989-03-29 Perforation Treatment Performed - Open-Hole Completion
1989-03-29 Well Log Performed
1989-05-24 Well Log Performed
1989-05-25 Well Log Performed
1989-05-26 Well Log Performed
1989-06-26 Well Log Performed
1989-06-28 Well Log Performed
1990-10-25 Well Log Performed
1991-02-01 Well Log Performed
1991-04-10 Well Log Performed
1991-08-15 Well Log Performed
1992-02-24 Well Log Performed
1993-09-02 Well Log Performed
1996-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-18 Perforation Treatment Performed - Jet Perforation
1996-07-18 Plug Back Performed
1996-07-18 Well Fluid changed to Crude Oil
1996-07-18 Well Mode changed to Abandoned Zone
1996-07-19 Well Log Performed
1996-08-06 Perforation Treatment Performed - Cement Plug
1996-08-06 Perforation Treatment Performed - Remedial Casing
1996-08-17 Well Abandoned
1996-08-17 Well Fluid changed to Crude Oil
1996-08-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-02-16 Bullet Perforation 1614.50 1616.00 23
1985-07-29 Perforation 1611.50 1611.70 13
1985-07-30 Acid Treatment 1611.50 1611.70 0
1985-08-01 Cement Squeeze 1611.50 1611.70 0
1985-08-06 Perforation 1610.80 1610.90 13
1985-08-07 Acid Treatment 1610.80 1610.90 0
1988-04-28 Cement Squeeze 1610.80 1610.90 0
1989-03-29 Open Hole/Barefoot Completion 1618.20 1626.00 0
1996-07-18 Packing Device Capped w/Cement 1592.00 1600.00 0
1996-07-18 Packing Device Capped w/Cement 1231.00 1239.00 0
1996-07-18 Perforation 160.00 161.00 13
1949-02-19 Acid Treatment 1614.50 1616.00 0
1996-08-06 Remedial Casing Cementing 160.00 161.00 0
1996-08-06 Cement Plug 47.30 161.00 0
1983-08-24 Cement Squeeze 1614.50 1616.00 0
1983-08-26 Perforation 1607.80 1608.00 10
1983-08-26 Acid Treatment 1607.80 1608.00 0
1983-08-29 Cement Squeeze 1607.80 1608.00 0
1983-08-31 Perforation 1612.50 1612.70 10
1983-08-31 Acid Treatment 1612.50 1612.70 0
1985-07-25 Cement Squeeze 1612.50 1612.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8586 0.0 0.0 0.0
1968 8088 0.0 0.0 0.0
1969 8092 0.0 0.0 0.0
1970 8514 0.0 0.0 0.0
1971 8172 0.0 0.0 0.0
1972 8628 0.0 0.0 0.0
1973 8627 0.0 0.0 0.0
1974 7859 0.0 0.0 0.0
1975 8567 0.0 0.0 0.0
1976 8603 0.0 0.0 0.0
1977 8451 0.0 0.0 0.0
1978 8407 0.0 0.0 0.0
1979 2472 0.0 0.0 0.0
1981 180 0.0 0.0 0.0
1983 2316 0.0 0.0 0.0
1984 8423 0.0 0.0 0.0
1985 5283 0.0 0.0 0.0
1986 4228 0.0 0.0 0.0
1987 100 0.0 0.0 0.0