X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262810003

Well Details

Well ID: 0504262810003
Loading map...
Location: 00/10-28-050-26W4/3
Location Alias: 00/10-28-50-26 W4M
Location Alias 2: 00/10-28-050-26 W4/03
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 28
County/Municipality: Devon
Well Name: MEC LEDUC-WB 10-28-50-26
Operator Name: NEP Canada ULC
License Number: 0002382
License Date: 1950-11-30
License Status: Suspension
Spud Date: 1951-01-06
Final Drill Date: 1951-02-06
Well Total Depth: 1623.70 m
Surface Hole Latitude: 53.346884
Surface Hole Longitude: -113.741667

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-11-30 Obtained License
1951-01-29 Drill Stem Test Performed
1951-01-31 Drill Stem Test Performed
1951-02-02 Liner Casing Operation Performed
1951-02-06 Finished Drilling
1951-02-06 Well Mode changed to Drilled and Cased
1951-02-09 Perforation Treatment Performed - Acid Wash - No Pressure
1951-02-09 Perforation Treatment Performed - Jet Perforation
1951-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-02-14 Perforation Treatment Performed - Bullet Perforation
1951-04-22 Perforation Treatment Performed - Cement Squeeze
1951-04-26 Perforation Treatment Performed - Bullet Perforation
1951-05-06 Perforation Treatment Performed - Acid Wash - No Pressure
1951-05-06 Perforation Treatment Performed - Bullet Perforation
1951-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-05-09 Perforation Treatment Performed - Cement Squeeze
1951-05-12 Perforation Treatment Performed - Bullet Perforation
1951-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-05-18 Perforation Treatment Performed - Cement Plug
1951-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-05-19 Perforation Treatment Performed - Bullet Perforation
1951-05-22 Perforation Treatment Performed - Bullet Perforation
1951-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-25 Perforation Treatment Performed - Jet Perforation
1980-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-09-17 Perforation Treatment Performed - Jet Perforation
1987-09-17 Well Log Performed
1987-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-04 Well Log Performed
1999-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-05-05 Plug Back Performed
1999-05-05 Well Log Performed
1999-05-06 Perforation Treatment Performed - Jet Perforation
1999-05-12 Well Began Production
1999-05-12 Well Fluid changed to Gas
1999-05-12 Well Mode changed to Flowing
2013-03-01 Well Fluid changed to Gas
2013-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-02-09 Perforation 1620.00 1621.50 20
1951-05-07 Acid Treatment 1618.50 1620.90 0
1951-05-09 Cement Squeeze 1618.50 1620.90 0
1951-05-12 Bullet Perforation 1615.70 1617.30 13
1951-05-12 Bullet Perforation 1616.40 1617.90 13
1951-05-12 Bullet Perforation 1617.00 1618.50 13
1951-05-14 Acid Treatment 1615.70 1618.50 0
1951-05-15 Acid Treatment 1615.70 1618.50 0
1951-05-18 Cement Plug 1560.60 1623.70 0
1951-05-19 Bullet Perforation 1536.20 1545.30 16
1951-05-19 Acid Treatment 1536.20 1545.30 0
1951-02-09 Acid Wash 1620.00 1621.50 0
1951-05-22 Bullet Perforation 1533.10 1536.80 13
1951-05-22 Bullet Perforation 1536.20 1545.30 7
1951-05-23 Acid Treatment 1533.10 1545.30 0
1977-06-07 Acid Treatment 1533.10 1545.30 0
1980-07-25 Perforation 1553.00 1561.00 13
1980-07-26 Acid Treatment 1553.00 1561.00 0
1987-09-17 Perforation 1530.00 1533.00 13
1987-09-17 Perforation 1545.00 1553.00 13
1987-09-28 Acid Treatment 1530.00 1561.60 0
1999-05-05 Packing Device Capped w/Cement 1512.00 1520.00 0
1951-02-12 Acid Treatment 1620.00 1621.50 0
1999-05-06 Perforation 1276.00 1278.00 17
1999-05-06 Perforation 1285.50 1288.50 17
1951-02-14 Bullet Perforation 1620.00 1621.50 13
1951-02-14 Acid Treatment 1620.00 1621.50 0
1951-04-22 Cement Squeeze 1620.00 1621.50 0
1951-04-26 Bullet Perforation 1618.50 1620.00 20
1951-05-06 Bullet Perforation 1619.70 1620.90 13
1951-05-06 Acid Wash 1618.50 1620.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 5447 0.0 0.0 0.0
2000 8702 0.0 0.0 0.0
2001 8282 0.0 0.0 0.0
2002 7950 0.0 0.0 0.0
2003 8550 0.0 0.0 0.0
2004 8223 0.0 0.0 0.0
2005 7736 0.0 0.0 0.0
2006 7176 0.0 0.0 0.0
2007 7980 0.0 0.0 0.0
2008 8352 0.0 0.0 0.0
2009 8188 0.0 0.0 0.0
2010 7990 0.0 0.0 0.0
2011 7819 0.0 0.0 0.0
2012 717 0.0 0.0 0.0

For data sources see[5]

References