If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504262815000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.350501,"lon":-113.74169,"icon":""}]} |
Location: 00/15-28-050-26W4/0 | |
Location Alias: 00/15-28-50-26 W4M | |
Location Alias 2: 00/15-28-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 28 | |
County/Municipality: Devon | |
Well Name: IMPERIAL LEDUC NO. 311 | |
Operator Name: Imperial Oil Limited | |
License Number: 0002384 | |
License Date: 1950-11-30 | |
License Status: RecExempt | |
Spud Date: 1950-12-09 | |
Final Drill Date: 1951-01-07 | |
Well Total Depth: 1634.90 m | |
Surface Hole Latitude: 53.350501 | |
Surface Hole Longitude: -113.741690 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-11-30 | Obtained License |
1950-12-30 | Drill Stem Test Performed |
1951-01-01 | Drill Stem Test Performed |
1951-01-04 | Production Casing Operation Performed |
1951-01-07 | Finished Drilling |
1951-01-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1951-01-10 | Perforation Treatment Performed - Bullet Perforation |
1951-01-11 | Drill Stem Test Performed |
1951-04-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1951-05-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1951-05-11 | Perforation Treatment Performed - Cement Plug |
1951-05-12 | Perforation Treatment Performed - Jet Perforation |
1951-05-13 | Perforation Treatment Performed - Acid Wash - No Pressure |
1951-05-18 | Perforation Treatment Performed - Cement Plug |
1951-05-28 | Well Mode changed to Drilled and Cased |
1952-10-25 | Perforation Treatment Performed - Jet Perforation |
1952-11-01 | Perforation Treatment Performed - Cement Plug |
1952-11-02 | Well Fluid changed to Crude Oil |
1952-11-02 | Well Mode changed to Potential |
1952-11-03 | Well Abandoned |
1952-11-03 | Well Fluid changed to Crude Oil |
1952-11-03 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-01-10 | Bullet Perforation | 1540.80 | 1543.80 | 13 |
1952-10-25 | Perforation | 1292.00 | 1292.40 | 13 |
1952-11-01 | Cement Plug | 894.60 | 925.10 | 0 |
1951-01-10 | Bullet Perforation | 1545.30 | 1563.60 | 13 |
1951-01-10 | Acid Treatment | 1540.80 | 1563.60 | 0 |
1951-04-27 | Packing Device Capped w/Cement | 1563.60 | 1566.70 | 0 |
1951-05-08 | Acid Treatment | 1540.80 | 1563.60 | 0 |
1951-05-11 | Cement Plug | 1551.40 | 1563.60 | 0 |
1951-05-12 | Perforation | 1538.00 | 1545.30 | 13 |
1951-05-13 | Acid Wash | 1538.00 | 1545.30 | 0 |
1951-05-18 | Cement Plug | 1546.90 | 1551.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]