If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0504262901003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.339659,"lon":-113.760071,"icon":""}]} |
| Location: 00/01-29-050-26W4/3 | |
| Location Alias: 00/01-29-50-26 W4M | |
| Location Alias 2: 00/01-29-050-26 W4/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 29 | |
| County/Municipality: Leduc County | |
| Well Name: MEC LEDUC-WB 1-29-50-26 | |
| Operator Name: NEP Canada ULC | |
| License Number: B0002493 | |
| License Date: 1948-11-24 | |
| License Status: Abandoned | |
| Spud Date: 1948-11-23 | |
| Final Drill Date: 1949-01-11 | |
| Well Total Depth: 1625.20 m | |
| Surface Hole Latitude: 53.339659 | |
| Surface Hole Longitude: -113.760071 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1948-11-24 | Obtained License |
| 1948-11-27 | Drill Stem Test Performed |
| 1948-11-29 | Drill Stem Test Performed |
| 1948-11-30 | Drill Stem Test Performed |
| 1948-12-02 | Drill Stem Test Performed |
| 1948-12-03 | Drill Stem Test Performed |
| 1948-12-04 | Drill Stem Test Performed |
| 1948-12-31 | Drill Stem Test Performed |
| 1949-01-11 | Finished Drilling |
| 1949-01-11 | Well Mode changed to Drilled and Cased |
| 1949-01-12 | Liner Casing Operation Performed |
| 1949-01-14 | Perforation Treatment Performed - Cement Squeeze |
| 1949-01-14 | Perforation Treatment Performed - Jet Perforation |
| 1949-01-18 | Perforation Treatment Performed - Cement Squeeze |
| 1949-01-18 | Perforation Treatment Performed - Jet Perforation |
| 1949-01-22 | Perforation Treatment Performed - Cement Squeeze |
| 1949-01-22 | Perforation Treatment Performed - Jet Perforation |
| 1949-01-25 | Perforation Treatment Performed - Cement Squeeze |
| 1949-01-25 | Perforation Treatment Performed - Jet Perforation |
| 1949-02-05 | Perforation Treatment Performed - Bullet Perforation |
| 1988-01-07 | Well Log Performed |
| 1988-01-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1988-01-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-01-11 | Perforation Treatment Performed - Jet Perforation |
| 1988-01-11 | Well Log Performed |
| 1988-01-13 | Perforation Treatment Performed - Jet Perforation |
| 1988-01-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2001-03-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-03-26 | Plug Back Performed |
| 2001-03-28 | Perforation Treatment Performed - Jet Perforation |
| 2001-03-29 | Perforation Treatment Performed - Fractured |
| 2001-03-31 | Perforation Treatment Performed - Jet Perforation |
| 2019-02-12 | Perforation Treatment Performed - Cement Plug |
| 2019-02-12 | Perforation Treatment Performed - Cement Squeeze |
| 2019-02-12 | Plug Back Performed |
| 2019-02-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-02-13 | Perforation Treatment Performed - Jet Perforation |
| 2019-02-13 | Plug Back Performed |
| 2019-02-13 | Well Log Performed |
| 2019-02-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-02-14 | Perforation Treatment Performed - Cement Squeeze |
| 2019-02-14 | Plug Back Performed |
| 2019-02-15 | Well Log Performed |
| 2019-03-05 | Perforation Treatment Performed - Jet Perforation |
| 2019-03-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-03-06 | Perforation Treatment Performed - Cement Squeeze |
| 2019-03-06 | Plug Back Performed |
| 2019-03-06 | Well Mode changed to Abandoned Zone |
| 2019-03-14 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1949-01-14 | Perforation | 1527.60 | 1529.60 | 3 |
| 1988-01-08 | Packing Device Capped w/Cement | 1621.50 | 1623.10 | 0 |
| 1988-01-11 | Perforation | 1618.20 | 1618.40 | 3 |
| 1988-01-11 | Acid Treatment | 1618.20 | 1618.40 | 0 |
| 1988-01-13 | Perforation | 1618.00 | 1618.20 | 4 |
| 1988-01-14 | Acid Treatment | 1618.00 | 1618.20 | 0 |
| 2001-03-26 | Packing Device Capped w/Cement | 1594.00 | 1602.00 | 0 |
| 2001-03-28 | Perforation | 1351.50 | 1352.70 | 14 |
| 2001-03-29 | Fracture | 1351.50 | 1352.70 | 0 |
| 2001-03-31 | Perforation | 1265.80 | 1268.00 | 14 |
| 2019-02-12 | Cement Squeeze | 1351.50 | 1352.70 | 0 |
| 1949-01-14 | Cement Squeeze | 1527.60 | 1529.60 | 0 |
| 2019-02-12 | Cement Squeeze | 1265.80 | 1268.00 | 0 |
| 2019-02-12 | Cement Plug | 969.80 | 1560.00 | 0 |
| 2019-02-13 | Packing Device Capped w/Cement | 572.00 | 580.00 | 0 |
| 2019-02-13 | Perforation | 353.00 | 354.00 | 13 |
| 2019-02-14 | Cement Squeeze | 353.00 | 354.00 | 0 |
| 2019-02-14 | Packing Device Capped w/Cement | 340.00 | 348.00 | 0 |
| 2019-03-05 | Perforation | 268.00 | 269.00 | 13 |
| 2019-03-06 | Cement Squeeze | 268.00 | 269.00 | 0 |
| 2019-03-06 | Packing Device Capped w/Cement | 256.00 | 264.00 | 0 |
| 1949-01-18 | Perforation | 1360.50 | 1362.50 | 3 |
| 1949-01-18 | Cement Squeeze | 1360.50 | 1362.50 | 0 |
| 1949-01-22 | Perforation | 1288.20 | 1290.20 | 3 |
| 1949-01-22 | Cement Squeeze | 1288.20 | 1290.20 | 0 |
| 1949-01-25 | Perforation | 1079.00 | 1081.00 | 3 |
| 1949-01-25 | Cement Squeeze | 1079.00 | 1081.00 | 0 |
| 1949-02-05 | Bullet Perforation | 1621.50 | 1623.10 | 23 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-02-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]