X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504262901003

Well Details

Well ID: 0504262901003
Loading map...
Location: 00/01-29-050-26W4/3
Location Alias: 00/01-29-50-26 W4M
Location Alias 2: 00/01-29-050-26 W4/03
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 29
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 1-29-50-26
Operator Name: NEP Canada ULC
License Number: B0002493
License Date: 1948-11-24
License Status: Abandoned
Spud Date: 1948-11-23
Final Drill Date: 1949-01-11
Well Total Depth: 1625.20 m
Surface Hole Latitude: 53.339659
Surface Hole Longitude: -113.760071

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-11-24 Obtained License
1948-11-27 Drill Stem Test Performed
1948-11-29 Drill Stem Test Performed
1948-11-30 Drill Stem Test Performed
1948-12-02 Drill Stem Test Performed
1948-12-03 Drill Stem Test Performed
1948-12-04 Drill Stem Test Performed
1948-12-31 Drill Stem Test Performed
1949-01-11 Finished Drilling
1949-01-11 Well Mode changed to Drilled and Cased
1949-01-12 Liner Casing Operation Performed
1949-01-14 Perforation Treatment Performed - Cement Squeeze
1949-01-14 Perforation Treatment Performed - Jet Perforation
1949-01-18 Perforation Treatment Performed - Cement Squeeze
1949-01-18 Perforation Treatment Performed - Jet Perforation
1949-01-22 Perforation Treatment Performed - Cement Squeeze
1949-01-22 Perforation Treatment Performed - Jet Perforation
1949-01-25 Perforation Treatment Performed - Cement Squeeze
1949-01-25 Perforation Treatment Performed - Jet Perforation
1949-02-05 Perforation Treatment Performed - Bullet Perforation
1988-01-07 Well Log Performed
1988-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-11 Perforation Treatment Performed - Jet Perforation
1988-01-11 Well Log Performed
1988-01-13 Perforation Treatment Performed - Jet Perforation
1988-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-26 Plug Back Performed
2001-03-28 Perforation Treatment Performed - Jet Perforation
2001-03-29 Perforation Treatment Performed - Fractured
2001-03-31 Perforation Treatment Performed - Jet Perforation
2019-02-12 Perforation Treatment Performed - Cement Plug
2019-02-12 Perforation Treatment Performed - Cement Squeeze
2019-02-12 Plug Back Performed
2019-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-13 Perforation Treatment Performed - Jet Perforation
2019-02-13 Plug Back Performed
2019-02-13 Well Log Performed
2019-02-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-14 Perforation Treatment Performed - Cement Squeeze
2019-02-14 Plug Back Performed
2019-02-15 Well Log Performed
2019-03-05 Perforation Treatment Performed - Jet Perforation
2019-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-06 Perforation Treatment Performed - Cement Squeeze
2019-03-06 Plug Back Performed
2019-03-06 Well Mode changed to Abandoned Zone
2019-03-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-01-14 Perforation 1527.60 1529.60 3
1988-01-08 Packing Device Capped w/Cement 1621.50 1623.10 0
1988-01-11 Perforation 1618.20 1618.40 3
1988-01-11 Acid Treatment 1618.20 1618.40 0
1988-01-13 Perforation 1618.00 1618.20 4
1988-01-14 Acid Treatment 1618.00 1618.20 0
2001-03-26 Packing Device Capped w/Cement 1594.00 1602.00 0
2001-03-28 Perforation 1351.50 1352.70 14
2001-03-29 Fracture 1351.50 1352.70 0
2001-03-31 Perforation 1265.80 1268.00 14
2019-02-12 Cement Squeeze 1351.50 1352.70 0
1949-01-14 Cement Squeeze 1527.60 1529.60 0
2019-02-12 Cement Squeeze 1265.80 1268.00 0
2019-02-12 Cement Plug 969.80 1560.00 0
2019-02-13 Packing Device Capped w/Cement 572.00 580.00 0
2019-02-13 Perforation 353.00 354.00 13
2019-02-14 Cement Squeeze 353.00 354.00 0
2019-02-14 Packing Device Capped w/Cement 340.00 348.00 0
2019-03-05 Perforation 268.00 269.00 13
2019-03-06 Cement Squeeze 268.00 269.00 0
2019-03-06 Packing Device Capped w/Cement 256.00 264.00 0
1949-01-18 Perforation 1360.50 1362.50 3
1949-01-18 Cement Squeeze 1360.50 1362.50 0
1949-01-22 Perforation 1288.20 1290.20 3
1949-01-22 Cement Squeeze 1288.20 1290.20 0
1949-01-25 Perforation 1079.00 1081.00 3
1949-01-25 Cement Squeeze 1079.00 1081.00 0
1949-02-05 Bullet Perforation 1621.50 1623.10 23

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-04 No Incident Encountered 0.00 0.00

For data sources see[5]

References