X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263004000

Well Details

Well ID: 0504263004000
Loading map...
Location: 00/04-30-050-26W4/0
Location Alias: 00/04-30-50-26 W4M
Location Alias 2: 00/04-30-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 30
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 4-30-50-26
Operator Name: NEP Canada ULC
License Number: 0008023
License Date: 1954-05-13
License Status: RecCertified
Spud Date: 1954-06-17
Final Drill Date: 1954-07-19
Well Total Depth: 1621.50 m
Surface Hole Latitude: 53.340230
Surface Hole Longitude: -113.801282

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-05-13 Obtained License
1954-07-01 Drill Stem Test Performed
1954-07-07 Drill Stem Test Performed
1954-07-12 Production Casing Operation Performed
1954-07-15 Perforation Treatment Performed - Open-Hole Completion
1954-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-07-19 Drill Stem Test Performed
1954-07-19 Finished Drilling
1954-07-19 Perforation Treatment Performed - Open-Hole Completion
1954-07-19 Well Mode changed to Drilled and Cased
1954-07-20 Drill Stem Test Performed
1954-07-27 Well Began Production
1954-07-27 Well Fluid changed to Crude Oil
1954-07-27 Well Mode changed to Flowing
1957-07-09 Well Fluid changed to Crude Oil
1957-07-09 Well Mode changed to Pumping
1960-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-12-07 Well Fluid changed to Crude Oil
1960-12-07 Well Mode changed to Suspended
1962-05-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-05-01 Well Fluid changed to Crude Oil
1962-05-01 Well Mode changed to Abandoned Zone
1962-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-05-02 Perforation Treatment Performed - Bullet Perforation
1964-08-25 Perforation Treatment Performed - Cement Plug
1964-08-28 Perforation Treatment Performed - Jet Perforation
1998-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-27 Plug Back Performed
1998-10-06 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-07-15 Open Hole/Barefoot Completion 1617.60 1619.10 0
1998-09-27 Packing Device Capped w/Cement 1280.00 1288.00 0
1954-07-16 Acid Treatment 1617.60 1619.10 0
1954-07-19 Open Hole/Barefoot Completion 1617.60 1621.50 0
1960-09-02 Acid Treatment 1617.60 1621.50 0
1962-05-01 Packing Device Capped w/Cement 1597.50 1603.20 0
1962-05-02 Bullet Perforation 1527.00 1543.50 7
1962-05-02 Acid Treatment 1527.00 1543.50 0
1964-08-25 Cement Plug 1513.00 1603.20 0
1964-08-28 Perforation 1303.60 1305.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References