X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263212022

Well Details

Well ID: 0504263212022
Loading map...
Location: 02/12-32-050-26W4/2
Location Alias: 02/12-32-50-26 W4M
Location Alias 2: 02/12-32-050-26 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 32
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 12-32-50-26
Operator Name: NEP Canada ULC
License Number: 0002458
License Date: 1950-12-21
License Status: Abandoned
Spud Date: 1951-01-05
Final Drill Date: 1951-01-26
Well Total Depth: 1484.70 m
Surface Hole Latitude: 53.361368
Surface Hole Longitude: -113.778732

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-12-21 Obtained License
1951-01-24 Drill Stem Test Performed
1951-01-25 Drill Stem Test Performed
1951-01-26 Drill Stem Test Performed
1951-01-26 Finished Drilling
1951-01-26 Well Mode changed to Drilled and Cased
1951-01-27 Production Casing Operation Performed
1951-01-30 Perforation Treatment Performed - Open-Hole Completion
1954-08-17 Perforation Treatment Performed - Open-Hole Completion
1958-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-27 Plug Back Performed
1997-10-28 Perforation Treatment Performed - Jet Perforation
1998-03-20 Well Began Production
1998-03-20 Well Fluid changed to Gas
1998-03-20 Well Mode changed to Flowing
1999-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-27 Plug Back Performed
1999-09-27 Well Fluid changed to Gas
1999-09-27 Well Mode changed to Abandoned Zone
1999-09-28 Perforation Treatment Performed - Jet Perforation
2004-09-08 Perforation Treatment Performed - Cement Squeeze
2004-09-08 Plug Back Performed
2004-09-16 Well Log Performed
2004-09-17 Perforation Treatment Performed - Jet Perforation
2004-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-04 Plug Back Performed
2018-03-04 Well Log Performed
2018-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-05 Plug Back Performed
2018-10-09 Perforation Treatment Performed - Jet Perforation
2018-10-09 Well Log Performed
2018-10-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-10 Perforation Treatment Performed - Cement Squeeze
2018-10-10 Plug Back Performed
2018-10-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-01-30 Open Hole/Barefoot Completion 1453.90 1478.30 0
2004-09-17 Perforation 1293.00 1303.00 17
2004-09-17 Perforation 1310.00 1313.00 17
2004-09-17 Perforation 1325.00 1330.00 17
2004-09-17 Perforation 1341.00 1346.00 17
2004-09-21 Acid Treatment 1293.00 1303.00 0
2004-09-21 Acid Treatment 1310.00 1313.00 0
2004-09-21 Acid Treatment 1325.00 1330.00 0
2004-09-21 Acid Treatment 1341.00 1346.00 0
2009-03-25 Acid Treatment 1293.00 1346.00 0
2018-03-04 Packing Device Capped w/Cement 1277.00 1285.00 0
1954-08-17 Open Hole/Barefoot Completion 1453.90 1484.70 0
2018-03-05 Packing Device Capped w/Cement 1227.00 1235.00 0
2018-03-05 Packing Device Capped w/Cement 1132.00 1140.00 0
2018-10-09 Perforation 508.00 509.00 13
2018-10-09 Perforation 265.20 266.20 13
2018-10-10 Cement Squeeze 265.20 509.00 0
2018-10-10 Packing Device Capped w/Cement 495.00 503.00 0
2018-10-10 Packing Device Capped w/Cement 253.00 261.00 0
1958-06-09 Acid Treatment 1468.50 1478.90 0
1997-10-27 Packing Device Capped w/Cement 1441.00 1449.00 0
1997-10-28 Perforation 1243.00 1245.00 13
1997-10-28 Perforation 1247.00 1249.00 13
1999-09-27 Packing Device Capped w/Cement 1232.00 1240.00 0
1999-09-28 Perforation 1150.00 1152.00 14
2004-09-08 Cement Squeeze 1150.00 1152.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 6560 0.0 0.0 0.0
1999 469 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-04 No Incident Encountered 0.00 0.00
2018-10-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References