X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263311002

Well Details

Well ID: 0504263311002
Loading map...
Location: 00/11-33-050-26W4/2
Location Alias: 00/11-33-50-26 W4M
Location Alias 2: 00/11-33-050-26 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 33
County/Municipality: Devon
Well Name: MEC LEDUC-WB 11-33-50-26
Operator Name: NEP Canada ULC
License Number: 0003361
License Date: 1951-08-22
License Status: Abandoned
Spud Date: 1951-10-02
Final Drill Date: 1951-10-29
Well Total Depth: 1620.00 m
Surface Hole Latitude: 53.361328
Surface Hole Longitude: -113.747673

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-08-22 Obtained License
1951-10-25 Liner Casing Operation Performed
1951-10-29 Finished Drilling
1951-10-29 Well Mode changed to Drilled and Cased
1951-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-11-03 Perforation Treatment Performed - Jet Perforation
1961-11-17 Perforation Treatment Performed - Jet Perforation
1961-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-01-19 Well Began Production
1962-01-19 Well Fluid changed to Gas
1962-01-19 Well Mode changed to Flowing
1964-04-01 Perforation Treatment Performed - Cement Squeeze
1964-04-02 Perforation Treatment Performed - Cement Squeeze
1964-04-02 Well Fluid changed to Gas
1964-04-02 Well Mode changed to Abandoned Zone
1984-03-05 Well Log Performed
1984-03-06 Perforation Treatment Performed - Cement Squeeze
1984-03-13 Perforation Treatment Performed - Jet Perforation
1984-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-16 Perforation Treatment Performed - Cement Squeeze
1984-03-20 Perforation Treatment Performed - Jet Perforation
1984-03-20 Well Log Performed
1984-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-22 Perforation Treatment Performed - Jet Perforation
1997-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-19 Plug Back Performed
1997-09-19 Well Log Performed
1997-09-23 Perforation Treatment Performed - Jet Perforation
1997-09-23 Well Log Performed
1997-09-29 Perforation Treatment Performed - Jet Perforation
1997-09-29 Well Log Performed
1997-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-03 Perforation Treatment Performed - Jet Perforation
1997-10-03 Plug Back Performed
1997-10-03 Well Log Performed
1998-04-23 Perforation Treatment Performed - Jet Perforation
1998-04-27 Perforation Treatment Performed - Remedial Casing
1998-09-24 Well Abandoned
1998-09-24 Well Fluid changed to Gas
1998-09-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-11-03 Perforation 1616.40 1617.90 13
1984-03-13 Perforation 1614.80 1615.00 3
1984-03-14 Acid Treatment 1614.80 1615.00 0
1984-03-16 Cement Squeeze 1614.80 1615.00 0
1984-03-20 Perforation 1613.90 1614.60 3
1984-03-21 Acid Treatment 1613.90 1614.60 0
1984-03-22 Perforation 1612.50 1612.60 3
1984-03-22 Acid Treatment 1612.50 1612.60 0
1997-09-19 Packing Device Capped w/Cement 1567.00 1575.00 0
1997-09-23 Perforation 1259.10 1262.80 18
1997-09-29 Perforation 1286.60 1289.60 18
1951-11-03 Acid Treatment 1616.40 1617.90 0
1997-09-29 Perforation 1291.20 1293.90 18
1997-10-03 Packing Device Capped w/Cement 1242.00 1250.00 0
1997-10-03 Perforation 1071.00 1074.00 18
1997-10-03 Packing Device Capped w/Cement 1059.00 1067.00 0
1998-04-23 Perforation 160.00 161.00 13
1998-04-23 Perforation 162.00 163.00 13
1998-04-27 Remedial Casing Cementing 160.00 163.00 0
1961-11-17 Perforation 1290.80 1293.90 7
1961-11-17 Perforation 1286.30 1289.30 7
1961-11-17 Perforation 1280.80 1283.80 7
1961-11-18 Acid Treatment 1280.80 1293.90 0
1964-04-01 Cement Squeeze 1280.80 1293.90 0
1964-04-02 Cement Squeeze 1280.80 1293.90 0
1984-03-06 Cement Squeeze 1616.40 1617.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0

For data sources see[5]

References