If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504263311020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.361465,"lon":-113.748131,"icon":""}]} |
Location: 02/11-33-050-26W4/0 | |
Location Alias: 02/11-33-50-26 W4M | |
Location Alias 2: 02/11-33-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 33 | |
County/Municipality: Devon | |
Well Name: MEC LEDUC-WB 11-33-50-26 | |
Operator Name: NEP Canada ULC | |
License Number: 0006439 | |
License Date: 1953-05-15 | |
License Status: Abandoned | |
Spud Date: 1953-05-24 | |
Final Drill Date: 1953-06-21 | |
Well Total Depth: 1548.10 m | |
Surface Hole Latitude: 53.361465 | |
Surface Hole Longitude: -113.748131 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-05-15 | Obtained License |
1953-06-06 | Drill Stem Test Performed |
1953-06-07 | Drill Stem Test Performed |
1953-06-09 | Drill Stem Test Performed |
1953-06-18 | Production Casing Operation Performed |
1953-06-21 | Finished Drilling |
1953-06-21 | Perforation Treatment Performed - Open-Hole Completion |
1953-06-21 | Well Mode changed to Drilled and Cased |
1953-06-27 | Well Began Production |
1953-06-27 | Well Fluid changed to Crude Oil |
1953-06-27 | Well Mode changed to Pumping |
1954-10-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-02-14 | Well Fluid changed to Crude Oil |
1973-02-14 | Well Mode changed to Suspended |
1977-03-22 | Perforation Treatment Performed - Cement Plug |
1977-03-22 | Well Fluid changed to Crude Oil |
1977-03-22 | Well Mode changed to Abandoned Zone |
1977-03-23 | Perforation Treatment Performed - Cement Plug |
1977-03-25 | Perforation Treatment Performed - Jet Perforation |
1987-04-07 | Perforation Treatment Performed - Cement Squeeze |
1987-04-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-04-22 | Perforation Treatment Performed - Jet Perforation |
1987-04-22 | Perforation Treatment Performed - Open-Hole Completion |
1987-06-14 | Well Fluid changed to Crude Oil |
1987-06-14 | Well Mode changed to Pumping |
1988-01-29 | Perforation Treatment Performed - Fractured |
1996-03-01 | Well Fluid changed to Crude Oil |
1996-03-01 | Well Mode changed to Suspended |
1998-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-09-15 | Plug Back Performed |
1998-09-15 | Well Fluid changed to Crude Oil |
1998-09-15 | Well Mode changed to Abandoned Zone |
1998-09-17 | Perforation Treatment Performed - Jet Perforation |
1998-09-18 | Perforation Treatment Performed - Remedial Casing |
1998-09-23 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-06-21 | Open Hole/Barefoot Completion | 1528.60 | 1548.10 | 0 |
1988-01-29 | Fracture | 1528.60 | 1548.10 | 0 |
1998-09-15 | Packing Device Capped w/Cement | 1204.90 | 1519.00 | 0 |
1998-09-17 | Perforation | 160.00 | 161.00 | 13 |
1998-09-18 | Remedial Casing Cementing | 160.00 | 161.00 | 0 |
1954-10-10 | Acid Treatment | 1528.60 | 1548.10 | 0 |
1977-03-22 | Cement Plug | 1527.70 | 1548.10 | 0 |
1977-03-23 | Cement Plug | 1495.70 | 1527.70 | 0 |
1977-03-25 | Perforation | 1314.60 | 1315.80 | 7 |
1987-04-07 | Cement Squeeze | 1314.60 | 1315.80 | 0 |
1987-04-22 | Open Hole/Barefoot Completion | 1528.60 | 1548.10 | 0 |
1987-04-22 | Perforation | 1530.00 | 1543.00 | 7 |
1987-04-22 | Acid Treatment | 1528.60 | 1548.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 5801 | 0.0 | 0.0 | 0.0 |
1968 | 5447 | 0.0 | 0.0 | 0.0 |
1969 | 936 | 0.0 | 0.0 | 0.0 |
1987 | 4673 | 0.0 | 0.0 | 0.0 |
1988 | 7721 | 0.0 | 0.0 | 0.0 |
1989 | 8201 | 0.0 | 0.0 | 0.0 |
1990 | 8291 | 0.0 | 0.0 | 0.0 |
1991 | 7853 | 0.0 | 0.0 | 0.0 |
1992 | 8120 | 0.0 | 0.0 | 0.0 |
1993 | 7302 | 0.0 | 0.0 | 0.0 |
1994 | 7887 | 0.0 | 0.0 | 0.0 |
1995 | 5510 | 0.0 | 0.0 | 0.0 |
1996 | 979 | 0.0 | 0.0 | 0.0 |
For data sources see[5]