X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263504020

Well Details

Well ID: 0504263504020
Loading map...
Location: 02/04-35-050-26W4/0
Location Alias: 02/04-35-50-26 W4M
Location Alias 2: 02/04-35-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 35
County/Municipality: Devon
Well Name: IMP LEDUC IN 4-35N-50-26
Operator Name: Imperial Oil Limited
License Number: 0002106
License Date: 1950-10-02
License Status: RecExempt
Spud Date: 1950-10-04
Final Drill Date: 1950-11-06
Well Total Depth: 1514.90 m
Surface Hole Latitude: 53.353543
Surface Hole Longitude: -113.705248

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-10-02 Obtained License
1950-11-04 Drill Stem Test Performed
1950-11-05 Drill Stem Test Performed
1950-11-06 Finished Drilling
1950-11-06 Well Mode changed to Drilled and Cased
1950-11-08 Drill Stem Test Performed
1950-11-09 Drill Stem Test Performed
1950-11-09 Production Casing Operation Performed
1950-11-13 Perforation Treatment Performed - Open-Hole Completion
1950-11-14 Perforation Treatment Performed - Bullet Perforation
1951-01-02 Perforation Treatment Performed - Acid Wash - No Pressure
1951-01-03 Well Began Production
1951-01-03 Well Fluid changed to Crude Oil
1951-01-03 Well Mode changed to Flowing
1957-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-12-30 Well Fluid changed to Crude Oil
1963-12-30 Well Mode changed to Pumping
1968-10-19 Well Began Injection
1968-10-19 Well Fluid changed to Water
1968-10-19 Well Type changed to Injection
1975-08-18 Perforation Treatment Performed - Cement Plug
1975-08-27 Well Abandoned
1975-08-27 Well Fluid changed to Water
1975-08-27 Well Mode changed to Abandoned
1975-08-27 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-11-13 Open Hole/Barefoot Completion 1511.80 1514.90 0
1950-11-14 Bullet Perforation 1481.30 1514.90 7
1951-01-02 Acid Wash 1481.30 1514.90 0
1957-12-18 Acid Treatment 1481.30 1514.90 0
1975-08-18 Cement Plug 1455.40 1514.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1968 3014 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0

For data sources see[5]

References