X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263510002

Well Details

Well ID: 0504263510002
Loading map...
Location: 00/10-35-050-26W4/2
Location Alias: 00/10-35-50-26 W4M
Location Alias 2: 00/10-35-050-26 W4/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 35
County/Municipality: Parkland County
Well Name: MEC LEDUC-WB 10-35-50-26
Operator Name: NEP Canada ULC
License Number: B0002436
License Date: 1948-11-01
License Status: Suspension
Spud Date: 1948-11-24
Final Drill Date: 1949-01-18
Well Total Depth: 1561.80 m
Surface Hole Latitude: 53.361354
Surface Hole Longitude: -113.693141

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1948-11-01 Obtained License
1948-12-21 Drill Stem Test Performed
1949-01-03 Drill Stem Test Performed
1949-01-18 Finished Drilling
1949-01-18 Well Mode changed to Drilled and Cased
1949-01-22 Liner Casing Operation Performed
1949-01-27 Perforation Treatment Performed - Bullet Perforation
1949-02-01 Perforation Treatment Performed - Acid Wash - No Pressure
1982-06-14 Perforation Treatment Performed - Cement Squeeze
1982-06-16 Perforation Treatment Performed - Jet Perforation
1982-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-21 Perforation Treatment Performed - Cement Squeeze
1982-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-24 Perforation Treatment Performed - Jet Perforation
1992-01-28 Well Log Performed
1993-02-11 Well Log Performed
1993-08-16 Well Log Performed
1996-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-31 Plug Back Performed
1996-08-02 Perforation Treatment Performed - Jet Perforation
1996-08-02 Well Log Performed
1996-12-13 Well Began Production
1996-12-13 Well Fluid changed to Gas
1996-12-13 Well Mode changed to Flowing
1997-05-07 Well Fluid changed to Gas
1997-05-07 Well Mode changed to Suspended
1997-09-30 Well Log Performed
1997-12-13 Perforation Treatment Performed - Jet Perforation
1997-12-13 Well Log Performed
1997-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-03-11 Perforation Treatment Performed - Cement Squeeze
1998-03-11 Well Log Performed
1998-03-12 Perforation Treatment Performed - Jet Perforation
1998-03-22 Perforation Treatment Performed - Fractured
1998-04-08 Well Fluid changed to Gas
1998-04-08 Well Mode changed to Suspended
2001-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-14 Perforation Treatment Performed - Jet Perforation
2001-03-14 Plug Back Performed
2001-03-14 Well Fluid changed to Gas
2001-03-14 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-01-27 Bullet Perforation 1558.10 1559.70 20
1996-08-02 Perforation 983.40 984.40 13
1996-08-02 Perforation 988.00 989.00 13
1997-12-13 Perforation 1434.50 1441.00 14
1997-12-15 Acid Treatment 1434.50 1441.00 0
1997-12-16 Acid Treatment 1434.50 1441.00 0
1998-03-11 Cement Squeeze 1434.50 1441.00 0
1998-03-12 Perforation 1088.00 1095.00 13
1998-03-22 Fracture 1088.00 1095.00 0
2001-03-14 Perforation 988.00 990.00 15
2001-03-14 Packing Device Capped w/Cement 1077.00 1081.00 0
1949-02-01 Acid Wash 1558.10 1559.70 0
1982-06-14 Cement Squeeze 1558.10 1559.70 0
1982-06-16 Perforation 1557.20 1557.50 10
1982-06-17 Acid Treatment 1557.20 1557.50 0
1982-06-21 Cement Squeeze 1557.20 1557.50 0
1982-06-24 Perforation 1558.00 1558.20 10
1982-06-24 Acid Treatment 1558.00 1558.20 0
1996-07-31 Packing Device Capped w/Cement 1532.00 1540.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 364 0.0 0.0 0.0
1997 2025 0.0 0.0 0.0

For data sources see[5]

References